Skip to main content

How to get from Ganesh Nagar (Chintal-Balanagar) to Attapur by metro?

From Ganesh Nagar (Chintal-Balanagar) to Attapur by metro

To get from Ganesh Nagar (Chintal-Balanagar) to Attapur in Hyderabad, you’ll need to take one metro line: take the 9X/283D from Ganesh Nagar (Chintal-Balanagar) station to Moosapet station. Next, you’ll have to switch to the C1-RED metro and finally take the 5K/92 from Lakdikapool station to Hyderguda station. The total trip duration for this route is approximately 1 hr 10 min. The ride fare is ₹70.00. The metro schedule from Ganesh Nagar (Chintal-Balanagar) may change. We recommend you check the updated metro schedule to Attapur on the Moovit app.

70min₹70.00
9X/283DC1-RED
Metro - C1-REDC1-RED
5K/92C1-RED
Walk to Attapur
Leaves from Ganesh Nagar (Chintal-Balanagar)

Step by Step

  • 1
    Start from  station
    Start from station
    Ganesh Nagar (Chintal-Balanagar)
  • 2
    9X/283DC1-RED
    Wait for
    9X/283D
    Central Bus Station (Cbs)
  • 3
    Ride to
    Ride to
    Moosapet
    15 min
  • 4
    Walk to metro station
    Walk to metro station
    Moosapet
    40 m • 1 min
  • 5
    Metro - C1-REDC1-RED
    Wait for metro
    C1-RED
    L. B. Nagar
  • 6
    Ride to metro station
    Ride to metro station
    Lakdi-Ka-Pul
    17 min
  • 7
    Walk to
    Walk to
    Lakdikapool
    20 m • 1 min
  • 8
    5K/92C1-RED
    Wait for
    5K/92
    Rajendranagar
  • 9
    Ride to
    Ride to
    Hyderguda
    21 min
  • 10
    Walk to Attapur
    Walk to
    Attapur
    Hyderabad Elevated Expressway ""P.V. Narasimha Rao""
    640 m • 9 min
*Duration based on 8am traffic

From Ganesh Nagar (Chintal-Balanagar) to Attapur by

To get from Ganesh Nagar (Chintal-Balanagar) to Attapur in Hyderabad, you’ll need to take : take the 283D from Ganesh Nagar (Chintal-Balanagar) station to Erragadda station. Next, you’ll have to switch to the and finally take the 300D from Mehdipatnam Bus Station station to Hyderguda station. The total trip duration for this route is approximately 60 min. The ride fare is ₹50.00. The metro schedule from Ganesh Nagar (Chintal-Balanagar) may change. We recommend you check the updated metro schedule to Attapur on the Moovit app.

60min₹50.00
Walk to Attapur
Leaves from Ganesh Nagar (Chintal-Balanagar)

Step by Step

  • 1
    Start from  station
    Start from station
    Ganesh Nagar (Chintal-Balanagar)
  • 2
    Wait for
    283D
    Central Bus Station (Cbs)
  • 3
    Ride to
    Ride to
    Erragadda 
    14 min
  • 4
    Wait for
    289M
    Mehdipatnam Bus Stop
  • 5
    Ride to
    Ride to
    Mehdipatnam Bus Station
    24 min
  • 6
    Wait for
    300D
    Mehdipatnam
  • 7
    Ride to
    Ride to
    Hyderguda
    11 min
  • 8
    Walk to Attapur
    Walk to
    Attapur
    Hyderabad Elevated Expressway ""P.V. Narasimha Rao""
    640 m • 9 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Hyderabad.
All local mobility options in one app

Public transit directions from Ganesh Nagar (Chintal-Balanagar) to Attapur

The distance between Ganesh Nagar (Chintal-Balanagar), Hyderabad and Attapur, Hyderabad is approximately 23.41 km, which can typically be travelled in 70 min. Moovit will show you the directions from Ganesh Nagar (Chintal-Balanagar) to Attapur by metro, so no matter how you choose to travel in Hyderabad – you will always have plenty of easy options.

Metro schedule from Ganesh Nagar (Chintal-Balanagar) to Attapur

To check the metro schedule from Ganesh Nagar (Chintal-Balanagar) to Attapur using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Ganesh Nagar (Chintal-Balanagar)) and destination (Attapur), then select the desired date and time of travel. Moovit will show all available metro routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each metro, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest metro schedules.

From Ganesh Nagar (Chintal-Balanagar) to Attapur by

To get from Ganesh Nagar (Chintal-Balanagar) to Attapur in Hyderabad, you’ll need to take : take the 283D from Ganesh Nagar (Chintal-Balanagar) station to Erragadda station. Next, you’ll have to switch to the and finally take the 300D from Mehdipatnam Bus Station station to Hyderguda station. The total trip duration for this route is approximately 60 min. The ride fare is ₹50.00. The metro schedule from Ganesh Nagar (Chintal-Balanagar) may change. We recommend you check the updated metro schedule to Attapur on the Moovit app.

60min₹50.00
Walk to Attapur
Leaves from Ganesh Nagar (Chintal-Balanagar)

Step by Step

  • 1
    Start from  station
    Start from station
    Ganesh Nagar (Chintal-Balanagar)
  • 2
    Wait for
    283D
    Central Bus Station (Cbs)
  • 3
    Ride to
    Ride to
    Erragadda 
    14 min
  • 4
    Wait for
    289M
    Mehdipatnam Bus Stop
  • 5
    Ride to
    Ride to
    Mehdipatnam Bus Station
    24 min
  • 6
    Wait for
    300D
    Mehdipatnam
  • 7
    Ride to
    Ride to
    Hyderguda
    11 min
  • 8
    Walk to Attapur
    Walk to
    Attapur
    Hyderabad Elevated Expressway ""P.V. Narasimha Rao""
    640 m • 9 min
*Duration based on 8am traffic

Questions & Answers

  • What is the fastest way to get from Ganesh Nagar (Chintal-Balanagar) to Attapur?

    The fastest way takes 70 minutes, using , Metro line C1-RED,.

  • What is the alternative route to get from Ganesh Nagar (Chintal-Balanagar) to Attapur?

    The alternative route takes 60 minutes, using , ,.

  • Is there a direct between Ganesh Nagar (Chintal-Balanagar) and Attapur?

    No, you’ll have to take one metro line in total. The total travelling time is 1 hr 10 min.

  • Which line goes from Ganesh Nagar (Chintal-Balanagar) to Attapur?

    The line goes from Central Bus Station (Cbs) station near Ganesh Nagar (Chintal-Balanagar) in Medchal to Moosapet station. From there you’ll have to take one metro line till Moosapet station near Attapur in Hyderabad.

  • How long does it take to travel from Ganesh Nagar (Chintal-Balanagar) to Attapur by metro?

    The total travel time between Ganesh Nagar (Chintal-Balanagar) in Medchal and Attapur in Hyderabad by metro is about 1 hr 10 min.

  • Where do I get on the near Ganesh Nagar (Chintal-Balanagar) to get to Attapur?

  • Where do I get off the when travelling between Ganesh Nagar (Chintal-Balanagar) and Attapur?

    Get off the at the Moosapet stop, which is closest to Attapur in Hyderabad.

  • How much is the fare from Ganesh Nagar (Chintal-Balanagar) to Attapur?

    The ride from Ganesh Nagar (Chintal-Balanagar) to Attapur costs ₹70.00.