Skip to main content

How to get from Central Power Research Institute to Attapur by bus?

From Central Power Research Institute to Attapur by bus

To get from Central Power Research Institute to Attapur in Rajendranagar Mandal, take the 280J bus from Cpri station to Secunderabad station. Next, take the 5K bus from Secunderabad station to Attapur station. The total trip duration for this route is approximately 1 hr 29 min. The bus schedule from Central Power Research Institute may change. We recommend you check the updated bus schedule to Attapur on the Moovit app.

89min
Walk to bus station
Bus - 280J280J
Bus - 5K5K
Walk to Attapur
Leaves from Cpri

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Cpri
    50 m • 1 min
  • 2
    Bus - 280J280J
    Wait for bus
    280J
    JBS
  • 3
    Ride to bus station
    Ride to bus station
    Secunderabad
    42 min
  • 4
    Bus - 5K5K
    Wait for bus
    5K
    Aramghar
  • 5
    Ride to bus station
    Ride to bus station
    Attapur
    32 min
  • 6
    Walk to Attapur
    Walk to
    Attapur
    Hyderabad Elevated Expressway ""P.V. Narasimha Rao""
    850 m • 11 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Hyderabad.
All local mobility options in one app

Public transit directions from Central Power Research Institute to Attapur

The distance between Central Power Research Institute, Rajendranagar Mandal and Attapur, Rajendranagar Mandal is approximately 31.96 km, which can typically be travelled in 89 min. Moovit will show you the directions from Central Power Research Institute to Attapur by bus, so no matter how you choose to travel in Rajendranagar Mandal – you will always have plenty of easy options.

Bus schedule from Central Power Research Institute to Attapur

To check the bus schedule from Central Power Research Institute to Attapur using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Central Power Research Institute) and destination (Attapur), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Central Power Research Institute to Attapur?

    The fastest way takes 89 minutes, using Bus line 280J, Bus line 5K.

  • Is there a direct bus between Central Power Research Institute and Attapur?

    No, you’ll have to take 2 bus lines in total. The total travelling time is 1 hr 29 min.

  • Which bus line goes from Central Power Research Institute to Attapur?

    The 280J bus line goes from Cpri station near Central Power Research Institute in Medipally Mandal to Secunderabad station. From there you’ll have to take one bus line till Secunderabad station near Attapur in Rajendranagar Mandal.

  • How long does it take to travel from Central Power Research Institute to Attapur by bus?

    The total travel time between Central Power Research Institute in Medipally Mandal and Attapur in Rajendranagar Mandal by bus is about 1 hr 29 min.

  • Where do I get on the bus near Central Power Research Institute to get to Attapur?

    Get on the 280J bus from the Cpri stop near Central Power Research Institute in Medipally Mandal.

  • Where do I get off the bus when travelling between Central Power Research Institute and Attapur?

    Get off the bus at the Secunderabad stop, which is closest to Attapur in Rajendranagar Mandal.

  • When is the first bus from Central Power Research Institute to Attapur?

    The first bus from Central Power Research Institute in Medipally Mandal to Attapur in Rajendranagar Mandal is (300/250C) 300-CHERLAPALLY RLY STN-TO-MEHDIPATNAM-UPL. It leaves the Chengicherla Cross Road stop at 9:55 AM.