Skip to main content

How to get from Jp Nagara 3rd Phase to BMS College of Engineering by bus?

From Jp Nagara 3rd Phase to BMS College of Engineering by bus

To get from Jp Nagara 3rd Phase to BMS College of Engineering in Srinagar, take the 370-A KMT-JBS-UJPD bus from Jp Nagara 3rd Phase station to Lalbagh West Gate station. Next, take the MF-16A bus from Lalbagh West Gate station to Subramanya Swamy Temple station. The total trip duration for this route is approximately 39 min. The ride fare is ₹35.00. The bus schedule from Jp Nagara 3rd Phase may change. We recommend you check the updated bus schedule to BMS College of Engineering on the Moovit app.

39min₹35.00
Bus - 370-A KMT-JBS-UJPD370-A KMT-JBS-UJPD
Bus - MF-16AMF-16A
Walk to BMS College of Engineering
Leaves from Jp Nagara 3rd Phase

Step by Step

  • 1
    Start from bus station
    Start from bus station
    Jp Nagara 3rd Phase
  • 2
    Bus - 370-A KMT-JBS-UJPD370-A KMT-JBS-UJPD
    Wait for bus
    370-A KMT-JBS-UJPD
    Kr Market (Kalasipalya)
  • 3
    Ride to bus station
    Ride to bus station
    Lalbagh West Gate
    19 min
  • 4
    Bus - MF-16AMF-16A
    Wait for bus
    MF-16A
    Shanthinagara Bus Station
  • 5
    Ride to bus station
    Ride to bus station
    Subramanya Swamy Temple
    12 min
  • 6
    Walk to BMS College of Engineering
    Walk to
    BMS College of Engineering
    Bull Temple Road
    210 m • 3 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Bengaluru.
All local mobility options in one app

Public transit directions from Jp Nagara 3rd Phase to BMS College of Engineering

The distance between Jp Nagara 3rd Phase, Srinagar and BMS College of Engineering, Srinagar is approximately 10.5 km, which can typically be travelled in 39 min. Moovit will show you the directions from Jp Nagara 3rd Phase to BMS College of Engineering by bus, so no matter how you choose to travel in Srinagar – you will always have plenty of easy options.

Bus schedule from Jp Nagara 3rd Phase to BMS College of Engineering

To check the bus schedule from Jp Nagara 3rd Phase to BMS College of Engineering using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Jp Nagara 3rd Phase) and destination (BMS College of Engineering), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Jp Nagara 3rd Phase to BMS College of Engineering?

    The fastest way takes 39 minutes, using Bus line 370-A KMT-JBS-UJPD, Bus line MF-16A.

  • Is there a direct bus between Jp Nagara 3rd Phase and BMS College of Engineering?

    No, you’ll have to take 2 bus lines in total. The total travelling time is 39 min.

  • Which bus line goes from Jp Nagara 3rd Phase to BMS College of Engineering?

    The 370-A KMT-JBS-UJPD bus line goes from Lalbagh West Gate station near Jp Nagara 3rd Phase in B.T.M.Layout to Subramanya Swamy Temple station. From there you’ll have to take one bus line till Subramanya Swamy Temple station near BMS College of Engineering in Srinagar.

  • How long does it take to travel from Jp Nagara 3rd Phase to BMS College of Engineering by bus?

    The total travel time between Jp Nagara 3rd Phase in B.T.M.Layout and BMS College of Engineering in Srinagar by bus is about 39 min.

  • Where do I get on the bus near Jp Nagara 3rd Phase to get to BMS College of Engineering?

    Get on the 370-A KMT-JBS-UJPD bus from the Lalbagh West Gate stop near Jp Nagara 3rd Phase in B.T.M.Layout.

  • Where do I get off the bus when travelling between Jp Nagara 3rd Phase and BMS College of Engineering?

    Get off the bus at the Subramanya Swamy Temple stop, which is closest to BMS College of Engineering in Srinagar.

  • How much is the bus fare from Jp Nagara 3rd Phase to BMS College of Engineering?

    The ride from Jp Nagara 3rd Phase to BMS College of Engineering costs ₹35.00.