Skip to main content

How to get from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest by subway?

From Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest by subway

Take one direct subway from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest in Toronto: take the 1 subway from Vaughan Metropolitan Centre station to Yorkdale station. The total trip duration for this route is approximately 40 min. The ride fare is CA$3.30. The subway schedule from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station may change. We recommend you check the updated subway schedule to Baycrest on the Moovit app.

40minCA$3.30
Walk to subway stationSubway - 1
Subway - 1
Walk to Baycrest
Leaves from Vaughan Metropolitan Centre

Step by Step

  • 1
    Walk to subway station
    Walk to subway station
    Vaughan Metropolitan Centre
    20 m • 1 min
  • 2
    Subway - 1
    Wait for subway
    1
    Finch Station - Subway Platform
  • 3
    Ride to subway station
    Ride to subway station
    Yorkdale
    20 min
  • 4
    Walk to Baycrest
    Walk to
    Baycrest
    3560 Bathurst Street
    1.28 km • 17 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Toronto.
All local mobility options in one app

Public transit directions from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest

The distance between Hwy 7 at (Wb) Vaughan Metropolitan Centre Station, Toronto and Baycrest, Toronto is approximately 12.92 km, which can typically be travelled in 40 min. Moovit will show you the directions from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest by subway, so no matter how you choose to travel in Toronto – you will always have plenty of easy options.

Subway schedule from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest

To check the subway schedule from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Hwy 7 at (Wb) Vaughan Metropolitan Centre Station) and destination (Baycrest), then select the desired date and time of travel. Moovit will show all available subway routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each subway, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest subway schedules.

Questions & Answers

  • What is the fastest way to get from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest?

    The fastest way takes 40 minutes, using Subway line 1.

  • Is there a direct subway between Hwy 7 at (Wb) Vaughan Metropolitan Centre Station and Baycrest?

    Yes, there’s a direct subway going from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station in Vaughan to Baycrest in Toronto in 40 min.

  • Which subway line goes from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest?

    The 1 subway line goes from Vaughan Metropolitan Centre station near Hwy 7 at (Wb) Vaughan Metropolitan Centre Station in Vaughan to Finch Station - Subway Platform station near Baycrest in Toronto.

  • How long does it take to travel from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest by subway?

    The total travel time between Hwy 7 at (Wb) Vaughan Metropolitan Centre Station in Vaughan and Baycrest in Toronto by subway is about 40 min.

  • Where do I get on the subway near Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to get to Baycrest?

    Get on the 1 subway from the Vaughan Metropolitan Centre station near Hwy 7 at (Wb) Vaughan Metropolitan Centre Station in Vaughan.

  • Where do I get off the subway when travelling between Hwy 7 at (Wb) Vaughan Metropolitan Centre Station and Baycrest?

    Get off the subway at the Finch Station - Subway Platform station, which is closest to Baycrest in Toronto.

  • When is the first subway from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest?

    The first subway from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station in Vaughan to Baycrest in Toronto is Line 1 Yonge - University. It leaves the Vaughan Metropolitan Centre station at 7:06 PM.

  • How much is the subway fare from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest?

    The ride from Hwy 7 at (Wb) Vaughan Metropolitan Centre Station to Baycrest costs CA$3.30.