Skip to main content

How to get from New Agripada (Santacruz-E) to Chandivali by bus?

New Agripada (Santacruz-E) to Chandivali - Bus Schedule

The 181 bus from New Agripada (Santacruz-E) to Chandivali runs from 06:57 to 08:02, with departures every 15 min. The trip takes about 41 min, with regular service throughout the operating hours.

From New Agripada (Santacruz-E) to Chandivali by bus

To get from New Agripada (Santacruz-E) to Chandivali in Chandivali, take the 181 bus from New Agripada (Santacruz-E) station to Chakala station. Next, take the A-185 bus from Chakala station to State Bank Marol station. The total trip duration for this route is approximately 41 min. The ride fare is ₹22.00. The bus schedule from New Agripada (Santacruz-E) may change. We recommend you check the updated bus schedule to Chandivali on the Moovit app.

41min₹22.00
Bus - 181181
Bus - A-185A-185
Walk to Chandivali
Leaves from New Agripada (Santacruz-E)

Step by Step

  • 1
    Start from bus station
    Start from bus station
    New Agripada (Santacruz-E)
  • 2
    Bus - 181181
    Wait for bus
    181
    Marol Depot
  • 3
    Ride to bus station
    Ride to bus station
    Chakala
    13 min
  • 4
    Bus - A-185A-185
    Wait for bus
    A-185
    Kannamwar Nagar No.2
  • 5
    Ride to bus station
    Ride to bus station
    State Bank Marol
    12 min
  • 6
    Walk to Chandivali
    Walk to
    Chandivali
    Ahmed Raza Marg
    1.05 km • 14 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Mumbai.
All local mobility options in one app

Public transit directions from New Agripada (Santacruz-E) to Chandivali

The distance between New Agripada (Santacruz-E) and Chandivali is approximately 8.91 km, which can typically be traveled in 41 min. Moovit will show you the directions from New Agripada (Santacruz-E) to Chandivali by bus, so no matter how you choose to travel in Chandivali – you will always have plenty of easy options.

Bus schedule from New Agripada (Santacruz-E) to Chandivali

To check the bus schedule from New Agripada (Santacruz-E) to Chandivali using the Moovit app, first download and open the app on your smartphone. Enter your starting point (New Agripada (Santacruz-E)) and destination (Chandivali), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from New Agripada (Santacruz-E) to Chandivali?

    The fastest way takes 41 minutes, using bus line 181, bus line A-185.

  • Is there a direct bus between New Agripada (Santacruz-E) and Chandivali?

    No, you’ll have to take 2 bus lines in total. The total traveling time is 41 min.

  • Which bus line goes from New Agripada (Santacruz-E) to Chandivali?

    The 181 bus line goes from Chakala station near New Agripada (Santacruz-E) in Vile Parle to State Bank Marol station. From there you’ll have to take one bus line till State Bank Marol station near Chandivali.

  • How long does it take to travel from New Agripada (Santacruz-E) to Chandivali by bus?

    The total travel time between New Agripada (Santacruz-E) and Chandivali by bus is about 41 min.

  • Where do I get on the bus near New Agripada (Santacruz-E) to get to Chandivali?

    Get on the 181 bus from the Chakala stop near New Agripada (Santacruz-E) in Vile Parle.

  • Where do I get off the bus when traveling between New Agripada (Santacruz-E) and Chandivali?

    Get off the bus at the State Bank Marol stop, which is closest to Chandivali.

  • How much is the bus fare from New Agripada (Santacruz-E) to Chandivali?

    The ride from New Agripada (Santacruz-E) to Chandivali costs ₹22.00.