Skip to main content

How to get from Matunga Labour Camp to Chandivali by bus?

From Matunga Labour Camp to Chandivali by bus

Take one direct bus from Matunga Labour Camp to Chandivali in Chandivali: take the 29 LTD bus from Matunga Labour Camp station to State Bank Marol station. The total trip duration for this route is approximately 47 min. The ride fare is ₹20.00. The bus schedule from Matunga Labour Camp may change. We recommend you check the updated bus schedule to Chandivali on the Moovit app.

47min₹20.00
Walk to bus station
Bus - 29 LTD29 LTD
Walk to Chandivali
Leaves from Matunga Labour Camp

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Matunga Labour Camp
    70 m • 1 min
  • 2
    Bus - 29 LTD29 LTD
    Wait for bus
    29 LTD
    Vihar Lake
  • 3
    Ride to bus station
    Ride to bus station
    State Bank Marol
    33 min
  • 4
    Walk to Chandivali
    Walk to
    Chandivali
    Ahmed Raza Marg
    1.05 km • 14 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Mumbai.
All local mobility options in one app

Public transit directions from Matunga Labour Camp to Chandivali

The distance between Matunga Labour Camp and Chandivali is approximately 11.92 km, which can typically be travelled in 47 min. Moovit will show you the directions from Matunga Labour Camp to Chandivali by bus, so no matter how you choose to travel in Chandivali – you will always have plenty of easy options.

Bus schedule from Matunga Labour Camp to Chandivali

To check the bus schedule from Matunga Labour Camp to Chandivali using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Matunga Labour Camp) and destination (Chandivali), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Matunga Labour Camp to Chandivali?

    The fastest way takes 47 minutes, using Bus line 29 LTD.

  • Is there a direct bus between Matunga Labour Camp and Chandivali?

    Yes, there’s a direct bus going from Matunga Labour Camp in Dharavi (Sc) to Chandivali in Chandivali in 47 min.

  • Which bus line goes from Matunga Labour Camp to Chandivali?

    The 29 LTD bus line goes from Matunga Labour Camp station near Matunga Labour Camp in Dharavi (Sc) to State Bank Marol station near Chandivali in Chandivali.

  • How long does it take to travel from Matunga Labour Camp to Chandivali by bus?

    The total travel time between Matunga Labour Camp and Chandivali by bus is about 47 min.

  • Where do I get on the bus near Matunga Labour Camp to get to Chandivali?

    Get on the 29 LTD bus from the Matunga Labour Camp stop near Matunga Labour Camp in Dharavi (Sc).

  • Where do I get off the bus when travelling between Matunga Labour Camp and Chandivali?

    Get off the bus at the State Bank Marol stop, which is closest to Chandivali.

  • When is the first bus from Matunga Labour Camp to Chandivali?

    The first bus from Matunga Labour Camp in Dharavi (Sc) to Chandivali in Chandivali is Wadala Depot - Sangharsh Nagar (Chandivali). It leaves the Kumbharwada (Dharavi) stop at 10:39 AM.

  • How much is the bus fare from Matunga Labour Camp to Chandivali?

    The ride from Matunga Labour Camp to Chandivali costs ₹20.00.