Skip to main content

How to get from South Kirkland Park & Ride to City of Edgewood by bus and light rail?

From South Kirkland Park & Ride to City of Edgewood by bus and light rail

To get from South Kirkland Park & Ride to City of Edgewood you’ll need to take 2 bus lines and one light rail line: take the 255 bus from South Kirkland Park & Ride station to Montlake Blvd NE & NE Pacific Pl - Bay 4 station. Next, you’ll have to switch to the 1 LINE light rail and finally take the 402 bus from Federal Way Downtown Station - Bay 6 station to Meridian Ave E & 24th St E station. The total trip duration for this route is approximately 2 hr 12 min. The ride fare is $7.75. The bus and light rail schedule from South Kirkland Park & Ride may change. We recommend you check the updated bus and light rail schedule to City of Edgewood on the Moovit app.

132min$7.75
Bus - 255255
Light Rail - 1 LINE
1 LINE
Bus - 402
402
Walk to City of Edgewood
Leaves from South Kirkland Park & Ride

Step by Step

  • 1
    Start from bus station
    Start from bus station
    South Kirkland Park & Ride
  • 2
    Bus - 255255
    Wait for bus
    255
    University District Kirkland
  • 3
    Ride to bus station
    Ride to bus station
    Montlake Blvd NE & NE Pacific Pl - Bay 4
    ID 25755
    15 min
  • 4
    Walk to light rail station
    Walk to light rail station
    University of Washington Station
    80 yd • 1 min
  • 5
    Light Rail - 1 LINE1 LINE
    Wait for light rail
    1 LINE
    Federal Way Downtown
  • 6
    Ride to light rail station
    Ride to light rail station
    Federal Way Downtown
    62 min
  • 7
    Walk to bus station
    Walk to bus station
    Federal Way Downtown Station - Bay 6
    ID 4695
    50 yd • 1 min
  • 8
    Bus - 402402
    Wait for bus
    402
    176th & Meridian Via Puyallup
  • 9
    Ride to bus station
    Ride to bus station
    Meridian Ave E & 24th St E
    ID 1142
    23 min
  • 10
    Walk to City of Edgewood
    Walk to
    City of Edgewood
    60 yd • 1 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Seattle - Tacoma, WA.
All local mobility options in one app

Public transit directions from South Kirkland Park & Ride to City of Edgewood

The distance between South Kirkland Park & Ride and City of Edgewood is approximately 40.49 mi, which can typically be travelled in 132 min. Moovit will show you the directions from South Kirkland Park & Ride to City of Edgewood by bus and light rail, so no matter how you choose to travel in Edgewood – you will always have plenty of easy options.

Bus And Light Rail schedule from South Kirkland Park & Ride to City of Edgewood

To check the bus and light rail schedule from South Kirkland Park & Ride to City of Edgewood using the Moovit app, first download and open the app on your smartphone. Enter your starting point (South Kirkland Park & Ride) and destination (City of Edgewood), then select the desired date and time of travel. Moovit will show all available bus and light rail routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus and light rail, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus and light rail schedules.

Questions & Answers

  • What is the fastest way to get from South Kirkland Park & Ride to City of Edgewood?

    The fastest way takes 132 minutes, using Bus line 255, Light Rail line 1 LINE, Bus line 402.

  • Is there a direct bus between South Kirkland Park & Ride and City of Edgewood?

    No, you’ll have to take 2 bus lines and one light rail line in total. The total travelling time is 2 hr 12 min.

  • Which bus line goes from South Kirkland Park & Ride to City of Edgewood?

    The 255 bus line goes from Montlake Blvd NE & NE Pacific Pl - Bay 4 station near South Kirkland Park & Ride in Kirkland to University of Washington Station. From there you’ll have to take one bus line and one light rail line till University of Washington Station near City of Edgewood.

  • How long does it take to travel from South Kirkland Park & Ride to City of Edgewood by bus and light rail?

    The total travel time between South Kirkland Park & Ride and City of Edgewood by bus and light rail is about 2 hr 12 min.

  • Where do I get on the bus near South Kirkland Park & Ride to get to City of Edgewood?

    Get on the 255 bus from the Montlake Blvd NE & NE Pacific Pl - Bay 4 stop near South Kirkland Park & Ride in Kirkland.

  • Where do I get off the bus when travelling between South Kirkland Park & Ride and City of Edgewood?

    Get off the bus at the University of Washington Station, which is closest to City of Edgewood.

  • How much is the total bus and light rail fare from South Kirkland Park & Ride to City of Edgewood?

    The ride from South Kirkland Park & Ride to City of Edgewood costs $7.75.