Skip to main content

How to get from Gantt to Judson by bus?

Gantt to Judson - Bus Schedule

The 507 bus from Gantt to Judson runs from 5:56 AM to 9:55 PM, with departures every 30 min-1 hr 10 min. The trip takes about 42 min, with regular service throughout the operating hours.

From Gantt to Judson by bus

Take one direct bus from Gantt to Judson in Greenville: take the 507 bus from White Horse & S Fairfield Rd station to Augusta St & Thruston St station. The total trip duration for this route is approximately 42 min. The bus schedule from Gantt may change. We recommend you check the updated bus schedule to Judson on the Moovit app.

42min
Bus - 507507
Walk to Judson
Leaves from White Horse & S Fairfield Rd

Step by Step

  • 1
    Start from bus station
    Start from bus station
    Gantt
  • 2
    Bus - 507507
    Wait for bus
    507
    Downtown Via Augusta St
  • 3
    Ride to bus station
    Ride to bus station
    Augusta St & Thruston St
    21 min
  • 4
    Walk to Judson
    Walk to
    Judson
    0.99 mi • 21 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Greenville.
All local mobility options in one app

Public transit directions from Gantt to Judson

The distance between Gantt, Greenville and Judson, Greenville is approximately 7.26 mi, which can typically be traveled in 42 min. Moovit will show you the directions from Gantt to Judson by bus, so no matter how you choose to travel in Greenville – you will always have plenty of easy options.

Bus schedule from Gantt to Judson

To check the bus schedule from Gantt to Judson using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Gantt) and destination (Judson), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Gantt to Judson?

    The fastest way takes 42 minutes, using bus line 507.

  • Is there a direct bus between Gantt and Judson in Greenville?

    Yes, there is a direct bus going from Gantt to Judson in Greenville in 42 min.

  • Which bus line goes from Gantt to Judson in Greenville?

    The 507 bus line goes from Augusta St & Thruston St station near Gantt to Judson station near Judson in Greenville.

  • How long does it take to travel from Gantt to Judson in Greenville by bus?

    The total travel time between Gantt and Judson in Greenville by bus is about 42 min.

  • Where do I get on the bus near Gantt to get to Judson in Greenville?

    Get on the 507 bus from the Augusta St & Thruston St stop near Gantt in Greenville.

  • Where do I get off the bus when traveling between Gantt and Judson in Greenville?

    Get off the bus at the Judson stop, which is closest to Judson in Greenville.

  • When is the last bus from Gantt to Judson in Greenville?

    The last bus from Gantt to Judson in Greenville is the Augusta line. It leaves the White Horse & S Fairfield Rd stop at 2:57 AM.