Skip to main content

How to get from Neilsoft Company Infosys Phase 3 to Malavli by bus and train?

Neilsoft Company Infosys Phase 3 to Malavli - Bus Schedule

The 373 bus from Neilsoft Company Infosys Phase 3 to Malavli runs from 06:00 to 16:50, with departures every 2 hr 40 min-5 hr 20 min. The trip takes about 2 hr 23 min, with regular service throughout the operating hours.

From Neilsoft Company Infosys Phase 3 to Malavli by bus and train

To get from Neilsoft Company Infosys Phase 3 to Malavli in Wadgaon, you’ll need to take 2 bus lines and one train line: take the 373 bus from Neilsoft Company Infosys Phase 3 station to Gangaramwadi Circle station. Next, you’ll have to switch to the 327 bus and finally take the EMU train from Chinchwad station to Malavali station. The total trip duration for this route is approximately 2 hr 23 min. The ride fare is ₹60.00. The bus and train schedule from Neilsoft Company Infosys Phase 3 may change. We recommend you check the updated bus and train schedule to Malavli on the Moovit app.

143min₹60.00
Bus - 373373
Bus - 327327
Train - EMUEMU
Leaves from Neilsoft Company Infosys Phase 3

Step by Step

  • 1
    Start from bus station
    Start from bus station
    Neilsoft Company Infosys Phase 3
  • 2
    Bus - 373373
    Wait for bus
    373
    Sangvi Vasantdada Putala
  • 3
    Ride to bus station
    Ride to bus station
    Gangaramwadi Circle
    12 min
  • 4
    Bus - 327327
    Wait for bus
    327
    Alandi Darshan
  • 5
    Ride to bus station
    Ride to bus station
    Chinchwad Station
    46 min
  • 6
    Walk to train station
    Walk to train station
    Chinchwad
    ID CCH
    300 m • 4 min
  • 7
    Train - EMUEMU
    Wait for train
    EMU
    Lonavala
  • 8
    Ride to train station Malavali
    Ride to train station
    Malavali
    ID MVL
    42 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Pune.
All local mobility options in one app

Public transit directions from Neilsoft Company Infosys Phase 3 to Malavli

The distance between Neilsoft Company Infosys Phase 3, Wadgaon and Malavli, Wadgaon is approximately 59.79 km, which can typically be travelled in 143 min. Moovit will show you the directions from Neilsoft Company Infosys Phase 3 to Malavli by bus and train, so no matter how you choose to travel in Wadgaon – you will always have plenty of easy options.

Bus And Train schedule from Neilsoft Company Infosys Phase 3 to Malavli

To check the bus and train schedule from Neilsoft Company Infosys Phase 3 to Malavli using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Neilsoft Company Infosys Phase 3) and destination (Malavli), then select the desired date and time of travel. Moovit will show all available bus and train routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus and train, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus and train schedules.

Questions & Answers

  • What is the fastest way to get from Neilsoft Company Infosys Phase 3 to Malavli?

    The fastest way takes 143 minutes, using Bus line 373, Bus line 327, Train line EMU.

  • Is there a direct bus between Neilsoft Company Infosys Phase 3 and Malavli?

    No, you’ll have to take 2 bus lines and one train line in total. The total travelling time is 2 hr 23 min.

  • Which bus line goes from Neilsoft Company Infosys Phase 3 to Malavli?

    The 373 bus line goes from Gangaramwadi Circle station near Neilsoft Company Infosys Phase 3 in Paud to Chinchwad Station. From there you’ll have to take one bus line and one train line till Chinchwad Station near Malavli in Wadgaon.

  • How long does it take to travel from Neilsoft Company Infosys Phase 3 to Malavli by bus and train?

    The total travel time between Neilsoft Company Infosys Phase 3 in Paud and Malavli in Wadgaon by bus and train is about 2 hr 23 min.

  • Where do I get on the bus near Neilsoft Company Infosys Phase 3 to get to Malavli?

    Get on the 373 bus from the Gangaramwadi Circle stop near Neilsoft Company Infosys Phase 3 in Paud.

  • Where do I get off the bus when travelling between Neilsoft Company Infosys Phase 3 and Malavli?

    Get off the bus at the Chinchwad Station, which is closest to Malavli in Wadgaon.

  • How much is the total bus and train fare from Neilsoft Company Infosys Phase 3 to Malavli?

    The ride from Neilsoft Company Infosys Phase 3 to Malavli costs ₹60.00.