How to get from Toronto Eaton Centre to Niagara Falls by subway and train?
From Toronto Eaton Centre to Niagara Falls by subway and train
To get from Toronto Eaton Centre to Niagara Falls in Toronto, take the 1 subway from Queen station to Union station. Next, take the VIA RAIL train from Union Station station to Niagara Falls Go station. The total trip duration for this route is approximately 2 hr 10 min.
Step by Step
- 1Walk to subway stationQueen130 m • 2 min
- 2Wait for subway1Vaughan Metropolitan Centre Station - Subway Platform
- 3Ride to subway stationUnion3 min
- 4Walk to train stationUnion Station20 m • 1 min
- 5Wait for trainVIA RAILNiagara Falls
- 6Ride to train stationNiagara Falls Go114 min
- 7Walk toNiagara Falls80 m • 2 min
From Toronto Eaton Centre to Niagara Falls by train
Take one direct train from Toronto Eaton Centre to Niagara Falls in Toronto: take the VIA RAIL train from Union Station station to Niagara Falls Go station. The total trip duration for this route is approximately 2 hr 16 min.
Step by Step
- 1Walk to train stationUnion Station1.28 km • 17 min
- 2Wait for trainVIA RAILNiagara Falls
- 3Ride to train stationNiagara Falls Go114 min
- 4Walk toNiagara Falls80 m • 2 min
Public transit directions from Toronto Eaton Centre to Niagara Falls
Related Routes
- Guelph/Eramosa to Niagara Falls
- Brampton to Niagara Falls
- Markham to Niagara Falls
- Mississauga to Niagara Falls
- Richmond Hill to Niagara Falls
- Toronto to Niagara Falls
- Oakville to Niagara Falls
- Burlington to Niagara Falls
- Milton to Niagara Falls
- Newmarket to Niagara Falls
- Barrie to Niagara Falls
- Whitchurch-Stouffville to Niagara Falls
- Ajax to Niagara Falls
- Whitby to Niagara Falls
- Oshawa to Niagara Falls
- Guelph to Niagara Falls
- Orangeville to Niagara Falls
- Waterloo to Niagara Falls
- Kitchener to Niagara Falls
- Peterborough to Niagara Falls
From Toronto Eaton Centre to Niagara Falls by train
Take one direct train from Toronto Eaton Centre to Niagara Falls in Toronto: take the VIA RAIL train from Union Station station to Niagara Falls Go station. The total trip duration for this route is approximately 2 hr 16 min.
Step by Step
- 1Walk to train stationUnion Station1.28 km • 17 min
- 2Wait for trainVIA RAILNiagara Falls
- 3Ride to train stationNiagara Falls Go114 min
- 4Walk toNiagara Falls80 m • 2 min
Questions & Answers
What is the fastest way to get from Toronto Eaton Centre to Niagara Falls?
The fastest way takes 130 minutes, using Subway line 1, Train line VIA RAIL.
What is the alternative route to get from Toronto Eaton Centre to Niagara Falls?
The alternative route takes 136 minutes, using Train line VIA RAIL.
Is there a direct subway between Toronto Eaton Centre and Niagara Falls in Toronto?
No, you’ll have to take one subway line and one train line in total. The total travelling time is 2 hr 10 min.
Which subway line goes from Toronto Eaton Centre to Niagara Falls in Toronto?
The 1 subway line goes from Queen station near Toronto Eaton Centre to Vaughan Metropolitan Centre Station - Subway Platform station. From there you’ll have to take one train line till Vaughan Metropolitan Centre Station - Subway Platform station near Niagara Falls in Toronto.
How long does it take to travel from Toronto Eaton Centre to Niagara Falls in Toronto by subway and train?
The total travel time between Toronto Eaton Centre and Niagara Falls in Toronto by subway and train is about 2 hr 10 min.
Where do I get on the subway near Toronto Eaton Centre to get to Niagara Falls in Toronto?
Get on the 1 subway from the Queen station near Toronto Eaton Centre in Toronto.
Where do I get off the subway when travelling between Toronto Eaton Centre and Niagara Falls in Toronto?
Get off the subway at the Vaughan Metropolitan Centre Station - Subway Platform station, which is closest to Niagara Falls in Toronto.
When is the first train from Toronto Eaton Centre to Niagara Falls in Toronto?
The first train from Toronto Eaton Centre to Niagara Falls in Toronto is Toronto - New York. It leaves the Union Station station at 4:20 AM.
Popular Routes
- Sheppard West Subway Station to Yorkdale Shopping Centre
- Ajax to Whitby
- Mississauga to Woodbine Racetrack
- Terminal 1 - Toronto Pearson Int'L Airport to Oakville
- Oakville to Burlington
- Toronto to Square One Shopping Centre
- Peterborough to Toronto
- Kitchener to Conestoga College Doon Campus
- Whitby to Niagara Falls
- Whitby to Durham College (Oshawa Campus)
- Dundas Street West to Barrie
- Durham College (Oshawa Campus) to Vaughan Mills
- Kitchener to Yorkdale Shopping Centre
- Oshawa GO Station to Richmond Hill
- Hamilton to Burlington
- Oshawa to Toronto
- Toronto to Humber College
- Waterloo to Oakville
- Yyz - Toronto International Airport to Georgetown Go Station
- Niagara Falls to Milton