Skip to main content

How to get from Bahia Vista St @ Gantt Ave to Nokomis, FL by bus?

Bahia Vista St @ Gantt Ave to Nokomis, FL - Bus Schedule

The 03 bus from Bahia Vista St @ Gantt Ave to Nokomis, FL runs from 7:13 AM to 6:13 PM, with departures every 1 hr. The trip takes about 1 hr 18 min, with regular service throughout the operating hours.

From Bahia Vista St @ Gantt Ave to Nokomis, FL by bus

To get from Bahia Vista St @ Gantt Ave to Nokomis, FL, you’ll need to take 3 bus lines: take the 03 bus from Bahia Vista St @ Gantt Ave station to Bahia Vista St @ Beneva Rd station. Next, you’ll have to switch to the 06 bus and finally take the 17 bus from Sarasota Square Blvd @ Sarasota Square Blvd station to S Tamiami Trl @ Pocono Trl W station. The total trip duration for this route is approximately 1 hr 18 min. The bus schedule from Bahia Vista St @ Gantt Ave may change. We recommend you check the updated bus schedule to Nokomis, FL on the Moovit app.

78min
Bus - 0303
Bus - 0606
Bus - 1717
Walk to Nokomis, FL
Leaves from Bahia Vista St @ Gantt Ave

Step by Step

  • 1
    Start from bus station
    Start from bus station
    Bahia Vista St @ Gantt Ave
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Bahia Vista St @ Beneva Rd
    ID BAHBENW1
    7 min
  • 4
    Walk to bus station
    Walk to bus station
    Beneva Rd @ Birky St
    ID BENBIRSB
    150 yd • 2 min
  • 5
    Bus - 0606
    Wait for bus
    06
    Sarasota Square Blvd @ Sarasota Square Blvd
  • 6
    Ride to bus station
    Ride to bus station
    Sarasota Square Blvd @ Sarasota Square Blvd
    ID SSMSEARS
    17 min
  • 7
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 8
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ Pocono Trl W
    ID S41POCSB
    21 min
  • 9
    Walk to Nokomis, FL
    Walk to
    Nokomis, FL
    440 yd • 6 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Sarasota.
All local mobility options in one app

Public transit directions from Bahia Vista St @ Gantt Ave to Nokomis, FL

The distance between Bahia Vista St @ Gantt Ave and Nokomis, FL is approximately 19.26 mi, which can typically be traveled in 78 min. Moovit will show you the directions from Bahia Vista St @ Gantt Ave to Nokomis, FL by bus, so no matter how you choose to travel in Nokomis – you will always have plenty of easy options.

Bus schedule from Bahia Vista St @ Gantt Ave to Nokomis, FL

To check the bus schedule from Bahia Vista St @ Gantt Ave to Nokomis, FL using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Bahia Vista St @ Gantt Ave) and destination (Nokomis, FL), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Bahia Vista St @ Gantt Ave to Nokomis, FL?

    The fastest way takes 78 minutes, using bus line 03, bus line 06, bus line 17.

  • Is there a direct bus between Bahia Vista St @ Gantt Ave and Nokomis, FL?

    No, you’ll have to take 3 bus lines in total. The total traveling time is 1 hr 18 min.

  • Which bus line goes from Bahia Vista St @ Gantt Ave to Nokomis, FL?

    The 03 bus line goes from Bahia Vista St @ Beneva Rd station near Bahia Vista St @ Gantt Ave in Fruitville to Beneva Rd @ Birky St station. From there you’ll have to take one bus line till Beneva Rd @ Birky St station near Nokomis, FL.

  • How long does it take to travel from Bahia Vista St @ Gantt Ave to Nokomis, FL by bus?

    The total travel time between Bahia Vista St @ Gantt Ave and Nokomis, FL by bus is about 1 hr 18 min.

  • Where do I get on the bus near Bahia Vista St @ Gantt Ave to get to Nokomis, FL?

    Get on the 03 bus from the Bahia Vista St @ Beneva Rd stop near Bahia Vista St @ Gantt Ave in Fruitville.

  • Where do I get off the bus when traveling between Bahia Vista St @ Gantt Ave and Nokomis, FL?

    Get off the bus at the Beneva Rd @ Birky St stop, which is closest to Nokomis, FL.