How to get from Bahia Vista St @ Gantt Ave to North Port, FL by bus?
Bahia Vista St @ Gantt Ave to North Port, FL - Public Transportation Schedule
The 03 bus runs from 7:13 AM to 6:13 PM, with departures every 1 hr.
The 17 bus runs from 5:46 AM to 9:16 PM, with departures every 30-39 min.
The 09 bus runs from 6:40 AM to 7:40 PM, with departures every 1 hr.
The trip takes about 3 hr 16 min.
From Bahia Vista St @ Gantt Ave to North Port, FL by bus
To get from Bahia Vista St @ Gantt Ave to North Port, FL, you’ll need to take 3 bus lines: take the 03 bus from Bahia Vista St @ Gantt Ave station to Orange Ave @ State St station. Next, you’ll have to switch to the 17 bus and finally take the 09 bus from N Seaboard Ave @ E Venice Ave station to S Sumter Blvd @ Cazes Ave station. The total trip duration for this route is approximately 3 hr 16 min. The bus schedule from Bahia Vista St @ Gantt Ave may change. We recommend you check the updated bus schedule to North Port, FL on the Moovit app.
Step by Step
- 1Start from bus stationBahia Vista St @ Gantt Ave
- 2Wait for bus03N Lemon Ave @ 2nd St
- 3Ride to bus stationOrange Ave @ State StID ORASTANB21 min
- 4Walk to bus stationOrange Ave @ State StID ORASTASB30 yd • 1 min
- 5Wait for bus17N Seaboard Ave @ E Venice Ave
- 6Ride to bus stationN Seaboard Ave @ E Venice AveID VENTRDPT1 hr 14 min
- 7Wait for bus09City Hall Blvd @ Kramer Way
- 8Ride to bus stationS Sumter Blvd @ Cazes AveID SUMCAZNB43 min
- 9Walk toNorth Port, FL500 yd • 6 min
Public transit directions from Bahia Vista St @ Gantt Ave to North Port, FL
Bus schedule from Bahia Vista St @ Gantt Ave to North Port, FL
Related Routes
- Sarasota Cattlemen Transfer Center to North Port, FL
- Ringling Blvd @ S Tuttle Ave to North Port, FL
- Ringling Blvd @ Pine Pl to North Port, FL
- Ringling Blvd @ S Osprey Ave to North Port, FL
- Cattlemen Rd @ Sawgrass Rd to North Port, FL
- Ringling Blvd @ East Ave to North Port, FL
- Bahia Vista St @ Coleman Ave to North Port, FL
- Bahia Vista St @ Albritton Ave to North Port, FL
- Bahia Vista St @ Cornish Ct to North Port, FL
- Bahia Vista St @ Honore Ave to North Port, FL
- Bahia Vista St @ Witmarsum Blvd to North Port, FL
- Bahia Vista St @ Keely Ln to North Port, FL
- Bahia Vista St @ Stone Ridge Trl to North Port, FL
- Bahia Vista St @ Sherwood Forest Dr to North Port, FL
- Fruitville Rd @ Whispering Oaks Ct to North Port, FL
- Fruitville Rd @ Bobby Jones Rd to North Port, FL
- Fruitville Rd @ Amherst Ave to North Port, FL
- Fruitville Rd @ Beneva Rd to North Port, FL
- Fruitville Rd @ Bailey Rd to North Port, FL
- Fruitville Rd @ N Lockwood Ridge Rd to North Port, FL
Questions & Answers
What is the fastest way to get from Bahia Vista St @ Gantt Ave to North Port, FL?
The fastest way takes 3 hr 16 min, using bus line 03, bus line 17, bus line 09.
Is there a direct bus between Bahia Vista St @ Gantt Ave and North Port, FL?
No, you’ll have to take 3 bus lines in total. The total traveling time is 3 hr 16 min.
Which bus line goes from Bahia Vista St @ Gantt Ave to North Port, FL?
The 03 bus line goes from Orange Ave @ State St station near Bahia Vista St @ Gantt Ave in Fruitville to Orange Ave @ State St station. From there you’ll have to take one bus line till Orange Ave @ State St station near North Port, FL.
How long does it take to travel from Bahia Vista St @ Gantt Ave to North Port, FL by bus?
The total travel time between Bahia Vista St @ Gantt Ave and North Port, FL by bus is about 3 hr 16 min.
Where do I get on the bus near Bahia Vista St @ Gantt Ave to get to North Port, FL?
Get on the 03 bus from the Orange Ave @ State St stop near Bahia Vista St @ Gantt Ave in Fruitville.
Popular Routes
- Gulf Dr N/6th St N to Bradenton, FL
- Sr 64 E/Cypress Creek Blvd to Bradenton, FL
- Manatee Ave W/Martinique Dr to Bradenton, FL
- Sarasota to Venice
- 5th St W/48th Ave Dr W to North Port, FL
- 30th Ave W @ 11th St W to Nokomis, FL
- Us 301/Ridgewood Blvd to Bradenton, FL
- Desoto Rd @ Desoto Pkwy to Nokomis, FL
- 9th Ave W/Ballard Park Dr to North Port, FL
- Desoto Station to Bradenton, FL
- 3rd St E/13th Ave E to North Port, FL
- 29th St E/60th Ave E to Nokomis, FL
- Us 41/40th St to Bradenton, FL
- Beneva Rd @ Webber St to Nokomis, FL
- South Gate Ridge to Siesta Key
- 30th Ave W/3rd St W to Bradenton, FL
- 15th St E/33rd Ave Dr E to Bradenton, FL
- Fruitville to The Meadows
- 26th St W/45th Ave W to Nokomis, FL
- 53rd Ave E/15th St E to Nokomis, FL