Skip to main content

How to get from Hinjawadi Phase 3 Corner to Paud by bus?

From Hinjawadi Phase 3 Corner to Paud by bus

To get from Hinjawadi Phase 3 Corner to Paud you’ll need to take 3 bus lines: take the 43A bus from Hinjawadi Maan Phase 3 station to Rosary School Warje station. Next, you’ll have to switch to the 43 bus and finally take the 233 bus from Chandani Chowk station to Chinmay Hotel Paud station. The total trip duration for this route is approximately 2 hr 15 min. The ride fare is ₹120.00. The bus schedule from Hinjawadi Phase 3 Corner may change. We recommend you check the updated bus schedule to Paud on the Moovit app.

135min₹120.00
Walk to bus station
Bus - 43A43A
Bus - 4343
Bus - 233233
Walk to Paud
Leaves from Hinjawadi Maan Phase 3

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Hinjawadi Maan Phase 3
    440 m • 6 min
  • 2
    Bus - 43A43A
    Wait for bus
    43A
    Katraj
  • 3
    Ride to bus station
    Ride to bus station
    Rosary School Warje
    66 min
  • 4
    Walk to bus station
    Walk to bus station
    Rosary School Warje
    70 m • 1 min
  • 5
    Bus - 4343
    Wait for bus
    43
    Nigdi Bhakti Shakti Terminal
  • 6
    Ride to bus station
    Ride to bus station
    Chandani Chowk
    8 min
  • 7
    Bus - 233233
    Wait for bus
    233
    Paud Shashkiya Vishramgruha
  • 8
    Ride to bus station
    Ride to bus station
    Chinmay Hotel Paud
    46 min
  • 9
    Walk to Paud
    Walk to
    Paud
    Pirangut Paud Road
    90 m • 2 min
*Duration based on 8am traffic

Alternative route from Hinjawadi Phase 3 Corner to Paud by bus via 43A, K-21 and 233

To get from Hinjawadi Phase 3 Corner to Paud you’ll need to take 3 bus lines: take the 43A bus from Hinjawadi Maan Phase 3 station to Nisarg Society / Baltuka Corner Bavdhan station. Next, you’ll have to switch to the K-21 bus and finally take the 233 bus from Shinde Farm station to Chinmay Hotel Paud station. The total trip duration for this route is approximately 2 hr 15 min. The ride fare is ₹110.00. The bus schedule from Hinjawadi Phase 3 Corner may change. We recommend you check the updated bus schedule to Paud on the Moovit app.

135min₹110.00
Walk to bus station
Bus - 43A43A
Bus - K-21K-21
Bus - 233233
Walk to Paud
Leaves from Hinjawadi Maan Phase 3

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Hinjawadi Maan Phase 3
    440 m • 6 min
  • 2
    Bus - 43A43A
    Wait for bus
    43A
    Katraj
  • 3
    Ride to bus station
    Ride to bus station
    Nisarg Society / Baltuka Corner Bavdhan
    55 min
  • 4
    Bus - K-21K-21
    Wait for bus
    K-21
    Vanaz Metro Station ⟲ Vanaz Metro Station Via Bavdhan (Circular)
  • 5
    Ride to bus station
    Ride to bus station
    Shinde Farm
    11 min
  • 6
    Walk to bus station
    Walk to bus station
    Shinde Farm
    150 m • 2 min
  • 7
    Bus - 233233
    Wait for bus
    233
    Paud Shashkiya Vishramgruha
  • 8
    Ride to bus station
    Ride to bus station
    Chinmay Hotel Paud
    47 min
  • 9
    Walk to Paud
    Walk to
    Paud
    Pirangut Paud Road
    90 m • 2 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Pune.
All local mobility options in one app

Public transit directions from Hinjawadi Phase 3 Corner to Paud

The distance between Hinjawadi Phase 3 Corner and Paud is approximately 48.85 km, which can typically be travelled in 135 min. Moovit will show you the directions from Hinjawadi Phase 3 Corner to Paud by bus, so no matter how you choose to travel in Paud – you will always have plenty of easy options.

Bus schedule from Hinjawadi Phase 3 Corner to Paud

To check the bus schedule from Hinjawadi Phase 3 Corner to Paud using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Hinjawadi Phase 3 Corner) and destination (Paud), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Alternative route from Hinjawadi Phase 3 Corner to Paud by bus via 43A, K-21 and 233

To get from Hinjawadi Phase 3 Corner to Paud you’ll need to take 3 bus lines: take the 43A bus from Hinjawadi Maan Phase 3 station to Nisarg Society / Baltuka Corner Bavdhan station. Next, you’ll have to switch to the K-21 bus and finally take the 233 bus from Shinde Farm station to Chinmay Hotel Paud station. The total trip duration for this route is approximately 2 hr 15 min. The ride fare is ₹110.00. The bus schedule from Hinjawadi Phase 3 Corner may change. We recommend you check the updated bus schedule to Paud on the Moovit app.

135min₹110.00
Walk to bus station
Bus - 43A43A
Bus - K-21K-21
Bus - 233233
Walk to Paud
Leaves from Hinjawadi Maan Phase 3

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Hinjawadi Maan Phase 3
    440 m • 6 min
  • 2
    Bus - 43A43A
    Wait for bus
    43A
    Katraj
  • 3
    Ride to bus station
    Ride to bus station
    Nisarg Society / Baltuka Corner Bavdhan
    55 min
  • 4
    Bus - K-21K-21
    Wait for bus
    K-21
    Vanaz Metro Station ⟲ Vanaz Metro Station Via Bavdhan (Circular)
  • 5
    Ride to bus station
    Ride to bus station
    Shinde Farm
    11 min
  • 6
    Walk to bus station
    Walk to bus station
    Shinde Farm
    150 m • 2 min
  • 7
    Bus - 233233
    Wait for bus
    233
    Paud Shashkiya Vishramgruha
  • 8
    Ride to bus station
    Ride to bus station
    Chinmay Hotel Paud
    47 min
  • 9
    Walk to Paud
    Walk to
    Paud
    Pirangut Paud Road
    90 m • 2 min
*Duration based on 8am traffic

Questions & Answers

  • What is the fastest way to get from Hinjawadi Phase 3 Corner to Paud?

    The fastest way takes 135 minutes, using Bus line 43A, Bus line 43, Bus line 233.

  • What is the alternative route to get from Hinjawadi Phase 3 Corner to Paud?

    The alternative route takes 135 minutes, using Bus line 43A, Bus line K-21, Bus line 233.

  • Is there a direct bus between Hinjawadi Phase 3 Corner and Paud in Paud?

    No, you’ll have to take 3 bus lines in total. The total travelling time is 2 hr 15 min.

  • Which bus line goes from Hinjawadi Phase 3 Corner to Paud in Paud?

    The 43A bus line goes from Hinjawadi Maan Phase 3 station near Hinjawadi Phase 3 Corner in Paud to Katraj station. From there you’ll have to take one bus line till Katraj station near Paud.

  • How long does it take to travel from Hinjawadi Phase 3 Corner to Paud in Paud by bus?

    The total travel time between Hinjawadi Phase 3 Corner and Paud by bus is about 2 hr 15 min.

  • Where do I get on the bus near Hinjawadi Phase 3 Corner to get to Paud in Paud?

    Get on the 43A bus from the Hinjawadi Maan Phase 3 stop near Hinjawadi Phase 3 Corner in Paud.

  • Where do I get off the bus when travelling between Hinjawadi Phase 3 Corner and Paud in Paud?

    Get off the bus at the Katraj stop, which is closest to Paud.

  • When is the last bus from Hinjawadi Phase 3 Corner to Paud in Paud?

    The last bus from Hinjawadi Phase 3 Corner to Paud in Paud is the Chinchwadgaon - Paud Shashkiya Vishramgruha line. It leaves the Gawarwadi stop at 12:43 PM.

  • How much is the bus fare from Hinjawadi Phase 3 Corner to Paud?

    The ride from Hinjawadi Phase 3 Corner to Paud costs ₹120.00.