Skip to main content

How to get from Nelamangala Cement Factory to Reva Institute by bus?

Nelamangala Cement Factory to Reva Institute - Public Transportation Schedule

The 401-AM bus runs from 05:11 to 18:46, with departures every 26 min-1 hr 54 min.

The trip takes about 2 hr 7 min.

From Nelamangala Cement Factory to Reva Institute by bus

To get from Nelamangala Cement Factory to Reva Institute in Bengaluru, you’ll need to take 3 bus lines: take the 258-VA bus from Kempalinganahalli Cross station to Jalahalli Cross (Jalahalli Metro Station) station. Next, you’ll have to switch to the 401-AM bus and finally take the 289-F bus from Venkatala station to Kattigenahalli Cross station. The total trip duration for this route is approximately 2 hr 7 min. The ride fare is ₹70.00. The bus schedule from Nelamangala Cement Factory may change. We recommend you check the updated bus schedule to Reva Institute on the Moovit app.

2 hr 7 min₹70.00
Walk to bus station
Bus - 258-VA258-VA
Bus - 401-AM401-AM
Bus - 289-F289-F
Walk to Reva Institute
Leaves from Kempalinganahalli Cross

Step by Step

  • 1
    Walk to bus station
    Walk to bus station
    Kempalinganahalli Cross
    ID 27208
    560 m • 7 min
  • 2
    Bus - 258-VA258-VA
    Wait for bus
    258-VA
    Kempegowda Bus Station(Majestic/Kbs)
  • 3
    Ride to bus station
    Ride to bus station
    Jalahalli Cross (Jalahalli Metro Station)
    ID 34532
    48 min
  • 4
    Walk to bus station
    Walk to bus station
    Jalahalli Cross (Jalahalli Metro Station)
    ID 38602
    110 m • 2 min
  • 5
    Bus - 401-AM401-AM
    Wait for bus
    401-AM
    Devanahalli Bus Stand
  • 6
    Ride to bus station
    Ride to bus station
    Venkatala
    ID 36560
    42 min
  • 7
    Bus - 289-F289-F
    Wait for bus
    289-F
    Hosakote Old Bus Stand
  • 8
    Ride to bus station
    Ride to bus station
    Kattigenahalli Cross
    ID 29621
    9 min
  • 9
    Walk to Reva Institute
    Walk to
    Reva Institute
    Baglur Main Rd
    840 m • 11 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Bengaluru.
All local mobility options in one app

Public transit directions from Nelamangala Cement Factory to Reva Institute

The distance between Nelamangala Cement Factory, Bengaluru and Reva Institute, Bengaluru is approximately 41.82 km, which can typically be traveled in 2 hr 7 min. Moovit will show you the directions from Nelamangala Cement Factory to Reva Institute by bus, so no matter how you choose to travel in Bengaluru – you will always have plenty of easy options.

Bus schedule from Nelamangala Cement Factory to Reva Institute

To check the bus schedule from Nelamangala Cement Factory to Reva Institute using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Nelamangala Cement Factory) and destination (Reva Institute), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Nelamangala Cement Factory to Reva Institute?

    The fastest way takes 2 hr 7 min, using bus line 258-VA, bus line 401-AM, bus line 289-F.

  • Is there a direct bus between Nelamangala Cement Factory and Reva Institute in Bengaluru?

    No, you’ll have to take 3 bus lines in total. The total traveling time is 2 hr 7 min.

  • Which bus line goes from Nelamangala Cement Factory to Reva Institute in Bengaluru?

    The 258-VA bus line goes from Kempalinganahalli Cross station near Nelamangala Cement Factory to Jalahalli Cross (Jalahalli Metro Station) station. From there you’ll have to take one bus line till Jalahalli Cross (Jalahalli Metro Station) station near Reva Institute in Bengaluru.

  • How long does it take to travel from Nelamangala Cement Factory to Reva Institute in Bengaluru by bus?

    The total travel time between Nelamangala Cement Factory and Reva Institute in Bengaluru by bus is about 2 hr 7 min.

  • Where do I get on the bus near Nelamangala Cement Factory to get to Reva Institute in Bengaluru?

    Get on the 258-VA bus from the Kempalinganahalli Cross stop near Nelamangala Cement Factory in Bengaluru.

  • How much is the bus fare from Nelamangala Cement Factory to Reva Institute?

    The ride from Nelamangala Cement Factory to Reva Institute costs ₹70.00.