Skip to main content

How to get from Bahia Vista St @ Gantt Ave to Scf Venice by bus?

Bahia Vista St @ Gantt Ave to Scf Venice - Public Transportation Schedule

The 03 bus runs from 7:13 AM to 6:13 PM, with departures every 1 hr.

The 17 bus runs from 5:46 AM to 9:16 PM, with departures every 30-39 min.

The 09 bus runs from 6:40 AM to 7:40 PM, with departures every 1 hr.

The trip takes about 2 hr 54 min.

From Bahia Vista St @ Gantt Ave to Scf Venice by bus

To get from Bahia Vista St @ Gantt Ave to Scf Venice in Sarasota, you’ll need to take 3 bus lines: take the 03 bus from Bahia Vista St @ Gantt Ave station to Orange Ave @ State St station. Next, you’ll have to switch to the 17 bus and finally take the 09 bus from N Seaboard Ave @ E Venice Ave station to S Tamiami Trl @ S West Villages Pkwy station. The total trip duration for this route is approximately 2 hr 54 min. The bus schedule from Bahia Vista St @ Gantt Ave may change. We recommend you check the updated bus schedule to Scf Venice on the Moovit app.

2 hr 54 min
Bus - 0303
Bus - 1717
Bus - 0909
Walk to Scf Venice
Leaves from Bahia Vista St @ Gantt Ave

Step by Step

  • 1
    Start from bus station
    Start from bus station
    Bahia Vista St @ Gantt Ave
  • 2
    Bus - 0303
    Wait for bus
    03
    N Lemon Ave @ 2nd St
  • 3
    Ride to bus station
    Ride to bus station
    Orange Ave @ State St
    ID ORASTANB
    21 min
  • 4
    Walk to bus station
    Walk to bus station
    Orange Ave @ State St
    ID ORASTASB
    30 yd • 1 min
  • 5
    Bus - 1717
    Wait for bus
    17
    N Seaboard Ave @ E Venice Ave
  • 6
    Ride to bus station
    Ride to bus station
    N Seaboard Ave @ E Venice Ave
    ID VENTRDPT
    1 hr 14 min
  • 7
    Bus - 0909
    Wait for bus
    09
    City Hall Blvd @ Kramer Way
  • 8
    Ride to bus station
    Ride to bus station
    S Tamiami Trl @ S West Villages Pkwy
    ID SCFVEN
    23 min
  • 9
    Walk to Scf Venice
    Walk to
    Scf Venice
    310 yd • 4 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Sarasota.
All local mobility options in one app

Public transit directions from Bahia Vista St @ Gantt Ave to Scf Venice

The distance between Bahia Vista St @ Gantt Ave and Scf Venice is approximately 39.26 mi, which can typically be traveled in 2 hr 54 min. Moovit will show you the directions from Bahia Vista St @ Gantt Ave to Scf Venice by bus, so no matter how you choose to travel in Sarasota – you will always have plenty of easy options.

Bus schedule from Bahia Vista St @ Gantt Ave to Scf Venice

To check the bus schedule from Bahia Vista St @ Gantt Ave to Scf Venice using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Bahia Vista St @ Gantt Ave) and destination (Scf Venice), then select the desired date and time of travel. Moovit will show all available bus routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each bus, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest bus schedules.

Questions & Answers

  • What is the fastest way to get from Bahia Vista St @ Gantt Ave to Scf Venice?

    The fastest way takes 2 hr 54 min, using bus line 03, bus line 17, bus line 09.

  • Is there a direct bus between Bahia Vista St @ Gantt Ave and Scf Venice?

    No, you’ll have to take 3 bus lines in total. The total traveling time is 2 hr 54 min.

  • Which bus line goes from Bahia Vista St @ Gantt Ave to Scf Venice?

    The 03 bus line goes from Orange Ave @ State St station near Bahia Vista St @ Gantt Ave in Fruitville to Orange Ave @ State St station. From there you’ll have to take one bus line till Orange Ave @ State St station near Scf Venice in Sarasota.

  • How long does it take to travel from Bahia Vista St @ Gantt Ave to Scf Venice by bus?

    The total travel time between Bahia Vista St @ Gantt Ave in Fruitville and Scf Venice in Sarasota by bus is about 2 hr 54 min.

  • Where do I get on the bus near Bahia Vista St @ Gantt Ave to get to Scf Venice?

    Get on the 03 bus from the Orange Ave @ State St stop near Bahia Vista St @ Gantt Ave in Fruitville.