Skip to main content

How to get from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology by MRT & LRT and train?

From Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology by MRT & LRT and train

To get from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology in Sepang, you’ll need to take 2 train lines and one MRT & LRT line: take the 1 train from Mid Valley station to KL Sentral station. Next, you’ll have to switch to the 7 train and finally take the 12 MRT & LRT from Putrajaya Sentral station to Cyberjaya City Centre station. The total trip duration for this route is approximately 1 hr 13 min. The ride fare is MYR16.60. The MRT & LRT and train schedule from Midvalley North Court may change. We recommend you check the updated MRT & LRT and train schedule to Student Services Department @ Limkokwing University of Creative Technology on the Moovit app.

73minMYR16.60
Walk to train station
Train - 1
Train - 7
MRT & LRT - 12
Walk to Student Services Department @ Limkokwing University of Creative Technology
Leaves from Mid Valley

Step by Step

  • 1
    Walk to train station
    Walk to train station
    Mid Valley
    150 m • 2 min
  • 2
    Train - 1
    Wait for train
    1
    2206 - Batu Caves
  • 3
    Ride to train station
    Ride to train station
    KL Sentral
    6 min
  • 4
    Train - 7
    Wait for train
    7
    KLIA T1 and T2
  • 5
    Ride to train station
    Ride to train station
    Putrajaya Sentral
    19 min
  • 6
    MRT & LRT - 12
    Wait for MRT & LRT
    12
    Kwasa Damansara
  • 7
    Ride to MRT & LRT station
    Ride to MRT & LRT station
    Cyberjaya City Centre
    2 min
  • 8
    Walk to Student Services Department @ Limkokwing University of Creative Technology
    Walk to
    Student Services Department @ Limkokwing University of Creative Technology
    Limkokwing University of Creative Technology
    1.13 km • 15 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Kuala Lumpur.
All local mobility options in one app

Public transit directions from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology

The distance between Midvalley North Court, Sepang and Student Services Department @ Limkokwing University of Creative Technology, Sepang is approximately 36.12 km, which can typically be travelled in 73 min. Moovit will show you the directions from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology by MRT & LRT and train, so no matter how you choose to travel in Sepang – you will always have plenty of easy options.

MRT & LRT And Train schedule from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology

To check the MRT & LRT and train schedule from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Midvalley North Court) and destination (Student Services Department @ Limkokwing University of Creative Technology), then select the desired date and time of travel. Moovit will show all available MRT & LRT and train routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each MRT & LRT and train, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest MRT & LRT and train schedules.

Related Routes

Questions & Answers

  • What is the fastest way to get from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology?

    The fastest way takes 73 minutes, using Train line 1, Train line 7, MRT & LRT line 12.

  • Is there a direct train between Midvalley North Court and Student Services Department @ Limkokwing University of Creative Technology?

    No, you’ll have to take 2 train lines and one MRT & LRT line in total. The total travelling time is 1 hr 13 min.

  • Which train line goes from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology?

    The 1 train line goes from Mid Valley station near Midvalley North Court in Kuala Lumpur to KL Sentral station. From there you’ll have to take one train line and one MRT & LRT line till KL Sentral station near Student Services Department @ Limkokwing University of Creative Technology in Sepang.

  • How long does it take to travel from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology by train and MRT & LRT?

    The total travel time between Midvalley North Court in Kuala Lumpur and Student Services Department @ Limkokwing University of Creative Technology in Sepang by train and MRT & LRT is about 1 hr 13 min.

  • Where do I get on the train near Midvalley North Court to get to Student Services Department @ Limkokwing University of Creative Technology?

    Get on the 1 train from the Mid Valley station near Midvalley North Court in Kuala Lumpur.

  • Where do I get off the train when travelling between Midvalley North Court and Student Services Department @ Limkokwing University of Creative Technology?

    Get off the train at the KL Sentral station, which is closest to Student Services Department @ Limkokwing University of Creative Technology in Sepang.

  • How much is the total train and MRT & LRT fare from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology?

    The ride from Midvalley North Court to Student Services Department @ Limkokwing University of Creative Technology costs MYR16.60.