Skip to main content

How to get from Northgate Station - Bay 1 to T-Mobile Park by light rail?

From Northgate Station - Bay 1 to T-Mobile Park by light rail

Take one direct light rail from Northgate Station - Bay 1 to T-Mobile Park in Seattle: take the 1 LINE light rail from Northgate Station station to Stadium Station station. The total trip duration for this route is approximately 32 min. The ride fare is $3.00. The light rail schedule from Northgate Station - Bay 1 may change. We recommend you check the updated light rail schedule to T-Mobile Park on the Moovit app.

32min$3.00
Light Rail - 1 LINE
1 LINE
Walk to T-Mobile Park
Leaves from Northgate Station

Step by Step

  • 1
    Start from light rail station
    Start from light rail station
    Northgate Station - Bay 1
  • 2
    Light Rail - 1 LINE1 LINE
    Wait for light rail
    1 LINE
    Federal Way Downtown
  • 3
    Ride to light rail station
    Ride to light rail station
    Stadium Station
    24 min
  • 4
    Walk to T-Mobile Park
    Walk to
    T-Mobile Park
    South Royal Brougham Way
    580 yd • 7 min
*Duration based on 8am traffic

Alternative route from Northgate Station - Bay 1 to T-Mobile Park by light rail via 2 LINE

Take one direct light rail from Northgate Station - Bay 1 to T-Mobile Park in Seattle: take the 2 LINE light rail from Northgate Station station to Int'L Dist/Chinatown Station station. The total trip duration for this route is approximately 37 min. The ride fare is $3.00. The light rail schedule from Northgate Station - Bay 1 may change. We recommend you check the updated light rail schedule to T-Mobile Park on the Moovit app.

37min$3.00
Light Rail - 2 LINE
2 LINE
Walk to T-Mobile Park
Leaves from Northgate Station

Step by Step

  • 1
    Start from light rail station
    Start from light rail station
    Northgate Station - Bay 1
  • 2
    Light Rail - 2 LINE2 LINE
    Wait for light rail
    2 LINE
    Downtown Redmond
  • 3
    Ride to light rail station
    Ride to light rail station
    Int'L Dist/Chinatown Station
    21 min
  • 4
    Walk to T-Mobile Park
    Walk to
    T-Mobile Park
    South Royal Brougham Way
    0.71 mi • 15 min
*Duration based on 8am traffic
The Most Popular Urban Mobility App in Seattle - Tacoma, WA.
All local mobility options in one app

Public transit directions from Northgate Station - Bay 1 to T-Mobile Park

The distance between Northgate Station - Bay 1, Seattle and T-Mobile Park, Seattle is approximately 9.38 mi, which can typically be travelled in 32 min. Moovit will show you the directions from Northgate Station - Bay 1 to T-Mobile Park by light rail, so no matter how you choose to travel in Seattle – you will always have plenty of easy options.

Light Rail schedule from Northgate Station - Bay 1 to T-Mobile Park

To check the light rail schedule from Northgate Station - Bay 1 to T-Mobile Park using the Moovit app, first download and open the app on your smartphone. Enter your starting point (Northgate Station - Bay 1) and destination (T-Mobile Park), then select the desired date and time of travel. Moovit will show all available light rail routes, estimated travel times, and any required transfers. You can view detailed departure and arrival times for each light rail, as well as real-time updates for delays or changes. Use this information to plan your trip and stay up to date with the latest light rail schedules.

Alternative route from Northgate Station - Bay 1 to T-Mobile Park by light rail via 2 LINE

Take one direct light rail from Northgate Station - Bay 1 to T-Mobile Park in Seattle: take the 2 LINE light rail from Northgate Station station to Int'L Dist/Chinatown Station station. The total trip duration for this route is approximately 37 min. The ride fare is $3.00. The light rail schedule from Northgate Station - Bay 1 may change. We recommend you check the updated light rail schedule to T-Mobile Park on the Moovit app.

37min$3.00
Light Rail - 2 LINE
2 LINE
Walk to T-Mobile Park
Leaves from Northgate Station

Step by Step

  • 1
    Start from light rail station
    Start from light rail station
    Northgate Station - Bay 1
  • 2
    Light Rail - 2 LINE2 LINE
    Wait for light rail
    2 LINE
    Downtown Redmond
  • 3
    Ride to light rail station
    Ride to light rail station
    Int'L Dist/Chinatown Station
    21 min
  • 4
    Walk to T-Mobile Park
    Walk to
    T-Mobile Park
    South Royal Brougham Way
    0.71 mi • 15 min
*Duration based on 8am traffic

Questions & Answers

  • What is the fastest way to get from Northgate Station - Bay 1 to T-Mobile Park?

    The fastest way takes 32 minutes, using Light Rail line 1 LINE.

  • What is the alternative route to get from Northgate Station - Bay 1 to T-Mobile Park?

    The alternative route takes 37 minutes, using Light Rail line 2 LINE.

  • Is there a direct light rail between Northgate Station - Bay 1 and T-Mobile Park in Seattle?

    Yes, there is a direct light rail going from Northgate Station - Bay 1 to T-Mobile Park in Seattle in 32 min.

  • Which light rail line goes from Northgate Station - Bay 1 to T-Mobile Park in Seattle?

    The 1 LINE light rail line goes from Federal Way Downtown station near Northgate Station - Bay 1 to Stadium Station station near T-Mobile Park in Seattle.

  • How long does it take to travel from Northgate Station - Bay 1 to T-Mobile Park in Seattle by light rail?

    The total travel time between Northgate Station - Bay 1 and T-Mobile Park in Seattle by light rail is about 32 min.

  • Where do I get on the light rail near Northgate Station - Bay 1 to get to T-Mobile Park in Seattle?

    Get on the 1 LINE light rail from the Federal Way Downtown station near Northgate Station - Bay 1 in Seattle.

  • Where do I get off the light rail when travelling between Northgate Station - Bay 1 and T-Mobile Park in Seattle?

    Get off the light rail at the Stadium Station station, which is closest to T-Mobile Park in Seattle.

  • How much is the light rail fare from Northgate Station - Bay 1 to T-Mobile Park?

    The ride from Northgate Station - Bay 1 to T-Mobile Park costs $3.00.