Find the best routes to Am Meilenstein, Reichshof

Directions to Am Meilenstein (Reichshof) with public transportation

The following transit lines have routes that pass near Am Meilenstein

  • BusBus: 303, E303, 321, 345.

How to get to Am Meilenstein by bus?

Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.

Bus stops near Am Meilenstein in Reichshof

  • Reichshof Müllerheide, 7 min walk,
  • Reichshof In Der Alten Wiese, 11 min walk,
  • Reichshof Rodener Platz, 17 min walk,

Bus lines to Am Meilenstein in Reichshof

  • 303, Gummersbach Bf,
  • E303, Gummersbach Fcgb-Schule,
  • 321, Wiehl Busbf,
  • 345, Waldbröl Busbf,
Questions & Answers
  • What are the closest stations to Am Meilenstein?

    The closest stations to Am Meilenstein are:

    • Reichshof Müllerheide stop is 508 meters away, 7 min walk.
    • Reichshof In Der Alten Wiese stop is 841 meters away, 11 min walk.
    • Reichshof Rodener Platz stop is 1305 meters away, 17 min walk.
  • Which bus line stops near Am Meilenstein?

    303 (Gummersbach Bf‎→Waldbröl Busbf)

  • What’s the nearest bus station to Am Meilenstein in Reichshof?

    The nearest bus station to Am Meilenstein in Reichshof is Reichshof Müllerheide. It’s a 7 min walk away.

  • What time is the first bus to Am Meilenstein in Reichshof?

    The 303 is the first bus that goes to Am Meilenstein in Reichshof. It stops nearby at 8:13 AM.

  • What time is the last bus to Am Meilenstein in Reichshof?

    The 303 is the last bus that goes to Am Meilenstein in Reichshof. It stops nearby at 10:20 PM.

See Am Meilenstein, Reichshof, on the map

Public Transit to Am Meilenstein in Reichshof

How to get to Am Meilenstein in Reichshof, Germany?

It’s easy with Moovit. Type in your street address and Moovit’s route finder will locate the fastest way to get you there! Not sure where to get off on the street? Download the Moovit App to find live directions (including where to get off on Am Meilenstein), see timetables and get the estimated arrival times for your favorite bus or train lines.

Looking for the nearest stop or station to Am Meilenstein? Check out this list of closest stops available to your destination: Reichshof Müllerheide; Reichshof In Der Alten Wiese; Reichshof Rodener Platz.

Bus: 303, E303, 321, 345.

Download the Moovit App to see the current schedule and routes available for Reichshof. No need to install a special bus app to check the bus time or a train app to get train time. Moovit is the only all-in-one transit app that helps you get where you need to go.

We make riding on public transit to Am Meilenstein easy, which is why over 1.7 billion users, including users in Reichshof, trust Moovit as the best app for public transit.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Location: Reichshof, NRW (North Rhine-Westphalia)

Am Meilenstein, Reichshof

Public transit lines with stations closest to Am Meilenstein in Reichshof

Bus lines with stations closest to Am Meilenstein in Reichshof