Directions to EVM TRANSPORTE (São Pedro Da Aldeia) with public transportation
The following transit lines have routes that pass near EVM TRANSPORTE
Bus: B101 CABO FRIO / SÃO PEDRO, B147 ARARUAMA / CABO FRIO, B460 BACAXÁ / CABO FRIO, EXECUTIVO, RIO DE JANEIRO - ARRAIAL DO CABO.
How to get to EVM TRANSPORTE by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near EVM TRANSPORTE in São Pedro Da Aldeia
- Praça De Campo Redondo, 3 min walk,
- Rj 140 Próx A Madeira E Cia, 5 min walk,
- Antiga Estrada São Pedro Da Aldeia - Cabo Frio, 67, 6 min walk,
Bus lines to EVM TRANSPORTE in São Pedro Da Aldeia
- 504, São Pedro - Alecrim,
- 508, São Pedro - Bairro São João,
- 520, São Pedro - Jardim Primavera (Via Campo Redondo),
- B205 CABO FRIO / SÃO PEDRO (VIA JARDIM PRIMAVERA), B205 Cabo Frio / São Pedro (via Jardim Primavera),
- B420 CABO FRIO / PRAIA DO SUDOESTE, B420 Cabo Frio / Praia do Sudoeste,
- B450 CAMPO REDONDO / BÚZIOS, B450 Campo Redondo / Búzios,
- B101 CABO FRIO / SÃO PEDRO, B101 Cabo Frio / São Pedro,
- B145 CABO FRIO / SAQUAREMA, B145 Cabo Frio / Saquarema,
- B147 ARARUAMA / CABO FRIO, B147 Araruama / Cabo Frio,
- B151 SÃO PEDRO / ARRAIAL DO CABO, B151 São Pedro / Arraial do Cabo,
- B215 CABO FRIO / IGUABA (VIA CRUZ / NOVA IGUABA), B215 Cabo Frio / Iguaba (via Cruz / Nova Iguaba),
- B400 SÃO VICENTE / CABO FRIO (VIA FLEXEIRA), B400 São Vicente / Cabo Frio (via Flexeira),
- B405 CABO FRIO / IGUABA (VIA FLEXEIRA), B405 Cabo Frio / Iguaba (via Flexeira),
- B410 CABO FRIO / ARAÇÁ, B410 Cabo Frio / Araçá,
- B436 CABO FRIO / SÃO VICENTE (VIA CRUZ), B436 Cabo Frio / São Vicente (via Cruz),
- B440 SAMPAIO CORRÊA / CABO FRIO, B440 Sampaio Corrêa / Cabo Frio,
- B460 BACAXÁ / CABO FRIO, B460 Bacaxá / Cabo Frio,
- EXECUTIVO, Cabo Frio,
- B130, Cabo Frio,
What are the closest stations to EVM TRANSPORTE?
The closest stations to EVM TRANSPORTE are:
- Praça De Campo Redondo stop is 187 meters away, 3 min walk.
- Rj 140 Próx A Madeira E Cia stop is 318 meters away, 5 min walk.
- Antiga Estrada São Pedro Da Aldeia - Cabo Frio, 67 stop is 375 meters away, 6 min walk.
Which bus lines stop near EVM TRANSPORTE?
These bus lines stop near EVM TRANSPORTE: B101 CABO FRIO / SÃO PEDRO, B147 ARARUAMA / CABO FRIO, B460 BACAXÁ / CABO FRIO, EXECUTIVO, RIO DE JANEIRO - ARRAIAL DO CABO.
What’s the nearest bus station to EVM TRANSPORTE in São Pedro Da Aldeia?
The nearest bus station to EVM TRANSPORTE in São Pedro Da Aldeia is Praça De Campo Redondo. It’s a 3 min walk away.
What time is the first bus to EVM TRANSPORTE in São Pedro Da Aldeia?
The B410 CABO FRIO / ARAÇÁ is the first bus that goes to EVM TRANSPORTE in São Pedro Da Aldeia. It stops nearby at 4:16 AM.
What time is the last bus to EVM TRANSPORTE in São Pedro Da Aldeia?
The EXECUTIVO is the last bus that goes to EVM TRANSPORTE in São Pedro Da Aldeia. It stops nearby at 2:46 AM.
See EVM TRANSPORTE, São Pedro Da Aldeia, on the map
Public Transit to EVM TRANSPORTE in São Pedro Da Aldeia
Wondering how to get to EVM TRANSPORTE in São Pedro Da Aldeia? Moovit helps you find the best way to get to EVM TRANSPORTE with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to EVM TRANSPORTE in real time.
Looking for the nearest stop or station to EVM TRANSPORTE? Check out this list of stops closest to your destination: Praça De Campo Redondo; Rj 140 Próx A Madeira E Cia; Antiga Estrada São Pedro Da Aldeia - Cabo Frio.
Bus: B101 CABO FRIO / SÃO PEDRO, B147 ARARUAMA / CABO FRIO, B460 BACAXÁ / CABO FRIO, EXECUTIVO, RIO DE JANEIRO - ARRAIAL DO CABO, 504, 508, 520, B205 CABO FRIO / SÃO PEDRO (VIA JARDIM PRIMAVERA), B420 CABO FRIO / PRAIA DO SUDOESTE, B145 CABO FRIO / SAQUAREMA, B151 SÃO PEDRO / ARRAIAL DO CABO, B215 CABO FRIO / IGUABA (VIA CRUZ / NOVA IGUABA), B130.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to EVM TRANSPORTE easily from the Moovit App or Website.
We make riding to EVM TRANSPORTE easy, which is why over 1.7 billion users, including users in São Pedro Da Aldeia, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, costs and ride fares to EVM TRANSPORTE, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
EVM TRANSPORTE Address: Rua Juscelino Freire, 167 Campo Redondo São Pedro da Aldeia-RJ 28942-236 street in São Pedro Da Aldeia
- Sandrinha Crochê,
- Lagos Inspeções Veiculares,
- Farmácias Predileta,
- REI do Bolinho de Bacalhau da Aldeia,
- Shopping Campo Redondo,
- Motel Taiti,
- Praça De Campo Redondo,
- Rsstore,
- Gr Ss - Pastelaria Gourmet,
- Decor Festas,
- Natalia Oliveira,
- Clínica de Saúde e Beleza Wanessa Pessanha Accf,
- Acai da Lili,
- Raridade Burguer,
- Rua Silva Jardim,
- Mercado Amarelinho,
- Help Car,
- Stilus Confeccoes,
- Igreja Evangélica Congregacional Em Campo Redondo,
- Escola Municipal Luiza Terra De Andrade
Places Near EVM TRANSPORTE (São Pedro Da Aldeia)
- Linha 391 - Padre Miguel / Praça da República, Engenho De Dentro,
- BRT - Estação Barra Shopping, Barra Da Tijuca,
- Hospital Municipal Ronaldo Gazolla, Acari,
- Feira De São Cristóvão, Imperial De São Cristóvão,
- Avenida Presidente Vargas 435, Centro,
- Policlínica Piquet Carneiro (Uerj), São Francisco Xavier,
- Feira Livre da Gloria, Glória,
- Rua Buenos Aires, Centro,
- Hospital Pedro Ernesto, Vila Isabel,
- Botafogo Praia Shopping, Botafogo,
- Shopping Nova América, Del Castilho,
- rua senador alencar, Imperial De São Cristóvão,
- Shopping Downtown, Barra Da Tijuca,
- Cadeg, Benfica,
- BRT - Fundão (Terminal Aroldo Melodia), Cidade Universitária (Fundão),
- Campo Grande -RJ, Campo Grande,
- Avenida Treze de Maio, Centro,
- Ponto final das vans Maricá / Central, Centro,
- Hospital da Lagoa, Lagoa,
- Feirão De Malhas, Duque De Caxias
How to get to popular places in Rio de Janeiro Region with public transit
Get around São Pedro Da Aldeia by public transit!
Traveling around São Pedro Da Aldeia has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in São Pedro Da Aldeia.
When traveling to any destination around São Pedro Da Aldeia use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in São Pedro Da Aldeia or how to pay for public transit in São Pedro Da Aldeia? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of São Pedro Da Aldeia public transit lines? Moovit public transit app shows all public transit maps in São Pedro Da Aldeia with all Bus, Train, Metro, Light Rail, Ferry, Cable Car, Gondola and Funicular routes and stops on an interactive map.
Rio de Janeiro Region has 8 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car, Gondola and Funicular, operated by several transit agencies, including TrensRJ, Metrô Rio, VLT Carioca, Barcas Rio, BRT MOBI-Rio, Consórcio INTERNORTE, Consórcio INTERSUL, Viação Redentor, Auto Viação Jabour, SOU Rio de Janeiro, Viação Pavunense, Caprichosa Auto Ônibus, Viação Vila Real, Transportes Campo Grande and Transportes Flores