Directions to Evm (Geneve) with public transportation
The following transit lines have routes that pass near Evm
Bus: N1, 22, 23.
Train: S1, EXT, RE, IR, IR70.
How to get to Evm by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Evm in Geneve
- Buchrain, Eichmatt, 6 min walk,
- Dierikon, Migros, 23 min walk,
Train stations near Evm in Geneve
- Buchrain, 20 min walk,
- Root D4, 25 min walk,
- Ebikon, 31 min walk,
- Waldibrücke, 51 min walk,
Bus lines to Evm in Geneve
- N1, Luzern, Bahnhof,
- 22, Gisikon, Weitblick,
- 23, Hünenberg, Rothus,
What are the closest stations to Evm?
The closest stations to Evm are:
- Buchrain, Eichmatt is 450 meters away, 6 min walk.
- Buchrain is 1473 meters away, 20 min walk.
- Dierikon, Migros is 1738 meters away, 23 min walk.
- Root D4 is 1913 meters away, 25 min walk.
- Ebikon is 2354 meters away, 31 min walk.
- Waldibrücke is 3981 meters away, 51 min walk.
Which train line stops near Evm?
S1 (Sursee→Baar)
What’s the nearest train station to Evm in Geneve?
The nearest train station to Evm in Geneve is Buchrain. It’s a 20 min walk away.
What’s the nearest bus station to Evm in Geneve?
The nearest bus station to Evm in Geneve is Buchrain, Eichmatt. It’s a 6 min walk away.
What time is the first train to Evm in Geneve?
The IR is the first train that goes to Evm in Geneve. It stops nearby at 5:02 AM.
What time is the last train to Evm in Geneve?
The S1 is the last train that goes to Evm in Geneve. It stops nearby at 1:11 AM.
What time is the first bus to Evm in Geneve?
The 23 is the first bus that goes to Evm in Geneve. It stops nearby at 4:41 AM.
What time is the last bus to Evm in Geneve?
The 22 is the last bus that goes to Evm in Geneve. It stops nearby at 1:12 AM.
See Evm, Geneve, on the map
Public Transit to Evm in Geneve
Wondering how to get to Evm in Geneve? Moovit helps you find the best way to get to Evm with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Evm in real time.
Looking for the nearest stop or station to Evm? Check out this list of stops closest to your destination: Buchrain; Buchrain; Dierikon; Root D4; Ebikon; Waldibrücke.
Bus: N1, 22, 23.Train: S1, EXT, RE, IR, IR70, IR75, N7, S9, S99.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Evm easily from the Moovit App or Website.
We make riding to Evm easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of train, bus and ferry, costs and ride fares to Evm, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Evm Address: Evm, Feldheimweg 3, 6033 Buchrain Luzern street in Geneve
- Movimento, Regula von Moos,
- Acenturia,
- Feldheim Cave,
- Hmc Partners,
- Kosmetiksalon Iris Sibirica,
- Huwyler-Haas Lucia,
- It - Christ,
- Permanent Line GmbH,
- Tara Yoga,
- Lucia Huwyler,
- Architekturgemeinschaft Büchler + Scheidegger,
- Hibiscus Nails by Sonja,
- Müller Mtech,
- Wohnbaugenossenschaft Perlen,
- Thomas Scheidegger Schreinerei,
- Fussball Spielkultur,
- Rnd Russisch Nail Design Petrillo,
- Artemanuum.Ch,
- Beat Mundhaas,
- Fahrni Partner Architekten
Places Near Evm (Geneve)
- Hôpital des Trois-Chêne, Thônex,
- Balexert, Vernier,
- Centre de Loisir Vitam'parc,
- Hôpital, Genève,
- Stade de Genève, Carouge (Ge),
- Place Dorcière, Genève,
- La Praille, Carouge (Ge),
- Ferney-Voltaire,
- IKEA Vernier, Vernier,
- IKEA, Vernier,
- HUG - Hôpitaux Universitaires de Genève, Genève,
- Clinique Générale Beaulieu, Genève,
- Cimetière De St.-Georges, Genève,
- Route de Peney, Vernier,
- Otto's,
- Office Cantonal Des Véhicules, Carouge (Ge),
- Conforama, Meyrin,
- Clinique La Lignière, Gland,
- Palexpo, Le Grand-Saconnex,
- Gare de Genève Cornavin, Genève
How to get to popular places in Geneve with public transit
Get around Geneve by public transit!
Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.
When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.
Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, Société Nationale des Chemins de fer Français, TPG, Interimsfahrplan / Horaire interimaire / Orario ad interim, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomération d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics Neuchâtelois SA (tc), But, PostAuto AG, Transports Publics de la Région Nyonnaise and SMGN