How to Get to Evm G. Bruinenberg in Westerveld by Bus or Train?

Directions to Evm G. Bruinenberg (Westerveld) with public transportation

The following transit lines have routes that pass near Evm G. Bruinenberg

  • BusBus: 28, 428.

How to get to Evm G. Bruinenberg by bus?

Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stop near Evm G. Bruinenberg in Westerveld

  • Uffelte, Dorpsstraat, 6 min walk,

Bus lines to Evm G. Bruinenberg in Westerveld

  • 28, Dwingeloo,
  • 428, Dieverbrug,
Questions & Answers
  • What are the closest stations to Evm G. Bruinenberg?

    The closest stations to Evm G. Bruinenberg are:

    • Uffelte, Dorpsstraat stop is 409 meters away, 6 min walk.
  • Which bus line stops near Evm G. Bruinenberg?

    28 (Dwingeloo)

  • What’s the nearest bus station to Evm G. Bruinenberg in Westerveld?

    The nearest bus station to Evm G. Bruinenberg in Westerveld is Uffelte, Dorpsstraat. It’s a 6 min walk away.

  • What time is the first bus to Evm G. Bruinenberg in Westerveld?

    The 428 is the first bus that goes to Evm G. Bruinenberg in Westerveld. It stops nearby at 3:12 AM.

  • What time is the last bus to Evm G. Bruinenberg in Westerveld?

    The 28 is the last bus that goes to Evm G. Bruinenberg in Westerveld. It stops nearby at 11:59 PM.

See Evm G. Bruinenberg, Westerveld, on the map

Public Transit to Evm G. Bruinenberg in Westerveld

Wondering how to get to Evm G. Bruinenberg in Westerveld? Moovit helps you find the best way to get to Evm G. Bruinenberg with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Evm G. Bruinenberg in real time.

Looking for the nearest stop or station to Evm G. Bruinenberg? Check out this list of stops closest to your destination: Uffelte.

Bus: 28, 428.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Evm G. Bruinenberg easily from the Moovit App or Website.

We make riding to Evm G. Bruinenberg easy, which is why over 1.7 billion users, including users in Westerveld, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of bus and train, costs and ride fares to Evm G. Bruinenberg, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Evm G. Bruinenberg Address: Lindenlaan 93 street in Westerveld

Evm G. Bruinenberg, Westerveld

Get around Westerveld by public transit!

Traveling around Westerveld has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Westerveld.

When traveling to any destination around Westerveld use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

Wondering how to use public transit in Westerveld or how to pay for public transit in Westerveld? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Westerveld public transit lines? Moovit public transit app shows all public transit maps in Westerveld with all Bus, Train, Metro, Light Rail and Ferry routes and stops on an interactive map.

Netherlands has 5 transit type(s), including: Bus, Train, Metro, Light Rail and Ferry, operated by several transit agencies, including NS, GVB, U-OV, HTM, RET, De Lijn, Connexxion, Arriva, Breng, EBS, Bravo (Hermes), Hermes, Qbuzz, Bravo (Arriva) and allGo

Public transit lines with stations closest to Evm G. Bruinenberg in Westerveld

Bus lines with stations closest to Evm G. Bruinenberg in Westerveld