How to Get to FlowLine in São Martinho by Bus?

Directions to FlowLine (São Martinho) with public transportation

The following transit lines have routes that pass near FlowLine

  • BusBus: 001002004AEROBUS048.

How to get to FlowLine by bus?

Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stops near FlowLine in São Martinho

  • Forum Madeira S (53), 1 min walk,
  • Duas Torres, 2 min walk,
  • Antes Forum Madeira (51A), 2 min walk,
  • Duas Torres (26), 2 min walk,
  • Rua Vale Ajuda S1A (805C), 4 min walk,

Bus lines to FlowLine in São Martinho

  • 001, Ponta Laranjeira Via Alto Lido,
  • 001, Centro EEM,
  • 048, Nazaré Via Penteada,
  • 083, São Martinho,
  • AEROBUS, Aeroporto,
  • 002, Centro,
  • 001, Ponta Laranjeira - Centro (Ligação Monte C 21),
  • 001, Ponta Laranjeira - Centro (Ligação Monte C 20),
  • 002, AV M Soares - Centro(Direto E Monumental),
  • 002, AV M Soares - Centro (Ligação Monte C 20),
  • 048, Nazaré - Monte (via Corujeira Dentro até Tanque),
  • 061, Socorridos - Centro,
  • 004, Centro EEM,
Questions & Answers
  • What are the closest stations to FlowLine?

    The closest stations to FlowLine are:

    • Forum Madeira S (53) stop is 70 meters away, 1 min walk.
    • Duas Torres stop is 113 meters away, 2 min walk.
    • Antes Forum Madeira (51A) stop is 123 meters away, 2 min walk.
    • Duas Torres (26) stop is 126 meters away, 2 min walk.
    • Rua Vale Ajuda S1A (805C) stop is 255 meters away, 4 min walk.
  • Which bus lines stop near FlowLine?

    These bus lines stop near FlowLine: 001, 002, 004, AEROBUS.

  • What’s the nearest bus station to FlowLine in São Martinho?

    The nearest bus station to FlowLine in São Martinho is Forum Madeira S (53). It’s a 1 min walk away.

  • What time is the first bus to FlowLine in São Martinho?

    The AEROBUS is the first bus that goes to FlowLine in São Martinho. It stops nearby at 3:12 AM.

  • What time is the last bus to FlowLine in São Martinho?

    The AEROBUS is the last bus that goes to FlowLine in São Martinho. It stops nearby at 3:13 AM.

See FlowLine, São Martinho, on the map

Public Transit to FlowLine in São Martinho

Wondering how to get to FlowLine in São Martinho? Moovit helps you find the best way to get to FlowLine with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to FlowLine in real time.

Looking for the nearest stop or station to FlowLine? Check out this list of stops closest to your destination: Forum Madeira S (53); Duas Torres; Antes Forum Madeira (51A); Duas Torres (26); Rua Vale Ajuda S1A (805C).

Bus: 001002004AEROBUS048083048.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to FlowLine easily from the Moovit App or Website.

We make riding to FlowLine easy, which is why over 1.7 billion users, including users in São Martinho, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of bus, costs and ride fares to FlowLine, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

FlowLine Address: Estrada Monumental 438 street in São Martinho

FlowLine, São Martinho

Get around São Martinho by public transit!

Traveling around São Martinho has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in São Martinho.

When traveling to any destination around São Martinho use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

Wondering how to use public transit in São Martinho or how to pay for public transit in São Martinho? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of São Martinho public transit lines? Moovit public transit app shows all public transit maps in São Martinho with all bus routes and stops on an interactive map.

Funchal has 1 transit type(s), including: bus, operated by several transit agencies, including HF, EACL, SIGA - Transportes Públicos da RAM and HF_PA

Public transit lines with stations closest to FlowLine in São Martinho

Bus lines with stations closest to FlowLine in São Martinho