Directions to Flowline B.V. (Rucphen) with public transportation
The following transit lines have routes that pass near Flowline B.V.
Bus: 162, 163, 380, 211.
Train: SPR, IC, IC.
How to get to Flowline B.V. by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Flowline B.V. by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stop near Flowline B.V. in Rucphen
- Zegge, Bosschenhoofdseweg, 1 min walk,
Train station near Flowline B.V. in Rucphen
- Oudenbosch, 17 min walk,
Bus lines to Flowline B.V. in Rucphen
- 211, Oudenbosch,
What are the closest stations to Flowline B.V.?
The closest stations to Flowline B.V. are:
- Zegge, Bosschenhoofdseweg stop is 29 meters away, 1 min walk.
- Oudenbosch station is 1292 meters away, 17 min walk.
Which bus lines stop near Flowline B.V.?
These bus lines stop near Flowline B.V.: 162, 163, 380.
Which train line stops near Flowline B.V.?
SPR (Dordrecht)
What’s the nearest train station to Flowline B.V. in Rucphen?
The nearest train station to Flowline B.V. in Rucphen is Oudenbosch. It’s a 17 min walk away.
What’s the nearest bus station to Flowline B.V. in Rucphen?
The nearest bus station to Flowline B.V. in Rucphen is Zegge, Bosschenhoofdseweg. It’s a 1 min walk away.
What time is the first train to Flowline B.V. in Rucphen?
The SPR is the first train that goes to Flowline B.V. in Rucphen. It stops nearby at 7:14 AM.
What time is the last train to Flowline B.V. in Rucphen?
The SPR is the last train that goes to Flowline B.V. in Rucphen. It stops nearby at 1:13 AM.
See Flowline B.V., Rucphen, on the map
Public Transit to Flowline B.V. in Rucphen
Wondering how to get to Flowline B.V. in Rucphen? Moovit helps you find the best way to get to Flowline B.V. with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Flowline B.V. in real time.
Looking for the nearest stop or station to Flowline B.V.? Check out this list of stops closest to your destination: Zegge; Oudenbosch.
Bus: 162, 163, 380, 211.Train: SPR, IC, IC.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Flowline B.V. easily from the Moovit App or Website.
We make riding to Flowline B.V. easy, which is why over 1.7 billion users, including users in Rucphen, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and train, costs and ride fares to Flowline B.V., please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Flowline B.V. Address: Onze Lieve Vrouwestraat 171 street in Rucphen
- Zegge,
- C G van Zundert,
- Bosschenhoofd,
- Fletcher Hotel-Restaurant de Reiskoffer,
- Mkd De Stegel,
- Leemstraat 14,
- Rodermarkt,
- Vliegveld Seppe,
- Distributiecentrum Primark Roosendaal,
- Crematorium Zegestede,
- Zegge,
- Ettenseweg,
- Gonzagaplein,
- Moskee Oudenbosch,
- ElectraClear,
- Carnaval Bazaar Ple4,
- B.V. Borstelfabriek Vero,
- Tesla,
- MC Donald's Oud-Gastel,
- Oudenbosch
Places Near Flowline B.V. (Rucphen)
- Euromast, Rotterdam,
- GelreDome, Arnhem,
- Brabanthallen, 'S-Hertogenbosch,
- Fenixloodsen, Rotterdam,
- Het Concertgebouw, Amsterdam,
- OLVG Oost, Amsterdam,
- Ziggo Dome, Amsterdam,
- Erasmus MC, Rotterdam,
- Rcn De Schotsman, Noord-Beveland,
- Franciscus Gasthuis, Rotterdam,
- Johan Cruijff Arena, Amsterdam,
- Busstation Jaarbeurszijde (C), Utrecht,
- Feyenoord Stadion (De Kuip), Rotterdam,
- Intratuin, Duiven,
- Maasstad Ziekenhuis, Rotterdam,
- IKEA, Amsterdam,
- Dappermarkt, Amsterdam,
- OLVG West, Amsterdam,
- Laan 20 Bevolkingsonderzoek Zuid-West, 'S-Gravenhage,
- Mall of the Netherlands, Leidschendam-Voorburg
How to get to popular places in Netherlands with public transit
Get around Rucphen by public transit!
Traveling around Rucphen has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Rucphen.
When traveling to any destination around Rucphen use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Rucphen or how to pay for public transit in Rucphen? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Rucphen public transit lines? Moovit public transit app shows all public transit maps in Rucphen with all Bus, Train, Metro, Light Rail and Ferry routes and stops on an interactive map.
Netherlands has 5 transit type(s), including: Bus, Train, Metro, Light Rail and Ferry, operated by several transit agencies, including NS, GVB, U-OV, HTM, RET, De Lijn, Connexxion, Arriva, Breng, EBS, Bravo (Hermes), Hermes, Qbuzz, Bravo (Arriva) and allGo