Directions to Hotel Meilenstein (Geneve) with public transportation
The following transit lines have routes that pass near Hotel Meilenstein
Bus: 64, 52, EV1, 51.
Train: IR35, S7, S, S6, EXT.
How to get to Hotel Meilenstein by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Hotel Meilenstein in Geneve
- Langenthal, Schwimmbad, 1 min walk,
- Langenthal, Dennli, 6 min walk,
- Langenthal, Ringstrasse, 7 min walk,
- Langenthal, Neuhof, 21 min walk,
Train stations near Hotel Meilenstein in Geneve
- Langenthal Süd, 10 min walk,
- Langenthal, 23 min walk,
Bus lines to Hotel Meilenstein in Geneve
- 64, Langenthal, Schoren-Ochsen,
- 52, Herzogenbuchsee, Bahnhof,
- EV1, Langenthal, Bahnhof,
- 51, Wangen An Der Aare, Bahnhof,
What are the closest stations to Hotel Meilenstein?
The closest stations to Hotel Meilenstein are:
- Langenthal, Schwimmbad is 34 meters away, 1 min walk.
- Langenthal, Dennli is 368 meters away, 6 min walk.
- Langenthal, Ringstrasse is 454 meters away, 7 min walk.
- Langenthal Süd is 696 meters away, 10 min walk.
- Langenthal, Neuhof is 1583 meters away, 21 min walk.
- Langenthal is 1722 meters away, 23 min walk.
Which train lines stop near Hotel Meilenstein?
These train lines stop near Hotel Meilenstein: IR35, S7.
What’s the nearest train station to Hotel Meilenstein in Geneve?
The nearest train station to Hotel Meilenstein in Geneve is Langenthal Süd. It’s a 10 min walk away.
What’s the nearest bus station to Hotel Meilenstein in Geneve?
The nearest bus station to Hotel Meilenstein in Geneve is Langenthal, Schwimmbad. It’s a 1 min walk away.
What time is the first train to Hotel Meilenstein in Geneve?
The S11 is the first train that goes to Hotel Meilenstein in Geneve. It stops nearby at 4:42 AM.
What time is the last train to Hotel Meilenstein in Geneve?
The S23 is the last train that goes to Hotel Meilenstein in Geneve. It stops nearby at 12:45 AM.
What time is the first bus to Hotel Meilenstein in Geneve?
The 52 is the first bus that goes to Hotel Meilenstein in Geneve. It stops nearby at 5:26 AM.
What time is the last bus to Hotel Meilenstein in Geneve?
The 51 is the last bus that goes to Hotel Meilenstein in Geneve. It stops nearby at 10:52 PM.
See Hotel Meilenstein, Geneve, on the map
Public Transit to Hotel Meilenstein in Geneve
Wondering how to get to Hotel Meilenstein in Geneve? Moovit helps you find the best way to get to Hotel Meilenstein with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Hotel Meilenstein in real time.
Looking for the nearest stop or station to Hotel Meilenstein? Check out this list of stops closest to your destination: Langenthal; Langenthal; Langenthal; Langenthal Süd; Langenthal; Langenthal.
Bus: 64, 52, EV1, 51.Train: IR35, S7, S, S6, EXT, IR, IR, IR17, IR17.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Hotel Meilenstein easily from the Moovit App or Website.
We make riding to Hotel Meilenstein easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of train, light rail and bus, costs and ride fares to Hotel Meilenstein, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Hotel Meilenstein Address: Hotel Meilenstein, Lotzwilstrasse 66, 4900 Langenthal Bern street in Geneve
- Bowlingcenter AG Langenthal,
- Restaurant Delikat,
- Sky Bar,
- Gastro Elemänt,
- Businesspark Langenthal AG,
- Parmat,
- Chalet à Fondue Par Milestone,
- Tourismus Langetental,
- The Meat,
- Pizzeria La Gioia,
- Bösiger Motorsport,
- Bowlingcenter Ag,
- Velo-Galerie,
- Pneu Bösiger Ag,
- Velo-Galerie Lüthi,
- Studio Uf Partner,
- MB Immobilien AG,
- Mpv Management,
- Elektro W. Siegrist AG,
- Tqv Audit
Places Near Hotel Meilenstein (Geneve)
- Office Cantonal Des Véhicules, Carouge (Ge),
- Hôpital, Genève,
- Stade de Genève, Carouge (Ge),
- Cimetière De St.-Georges, Genève,
- HUG - Hôpitaux Universitaires de Genève, Genève,
- IKEA, Vernier,
- Clinique La Lignière, Gland,
- Route de Peney, Vernier,
- Balexert, Vernier,
- Place Dorcière, Genève,
- Palexpo, Le Grand-Saconnex,
- Gare de Genève Cornavin, Genève,
- IKEA Vernier, Vernier,
- Ferney-Voltaire,
- Clinique Générale Beaulieu, Genève,
- Conforama, Meyrin,
- Otto's,
- Hôpital des Trois-Chêne, Thônex,
- La Praille, Carouge (Ge),
- Centre de Loisir Vitam'parc
How to get to popular places in Geneve with public transit
Get around Geneve by public transit!
Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.
When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.
Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, Société Nationale des Chemins de fer Français, TPG, Interimsfahrplan / Horaire interimaire / Orario ad interim, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomération d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics Neuchâtelois SA (tc), But, PostAuto AG, Transports Publics de la Région Nyonnaise and SMGN