How to Get to The Tobacco Shop Curve in Frosinone by Bus or Train?

Directions to The Tobacco Shop Curve (Frosinone) with public transportation

The following transit lines have routes that pass near The Tobacco Shop Curve

  • BusBus: 13, COTRAL, D, EN, TAV 1.
  • TrainTrain: FL6.

How to get to The Tobacco Shop Curve by bus?

Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.

How to get to The Tobacco Shop Curve by train?

Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.

Bus stops near The Tobacco Shop Curve in Frosinone

  • Frosinone | America Latina Avenue Vignali Road, 2 min walk,
  • Frosinone | Latin America Avenue Verdi Avenue, 9 min walk,
  • Frosinone - Via Gaeta Via Verdi, 9 min walk,
  • Frosinone | Jacobucci Street Verdi Avenue, 10 min walk,
  • Frosinone | Puccini Street, 19 min walk,

Bus lines to The Tobacco Shop Curve in Frosinone

  • D, Circular (Madonna della Neve to Center),
  • TAV 1, High Speed Shuttle Frosinone 1 (Forcella),
  • COTRAL, Arce - Frosinone,
  • COTRAL, Madonna Del Piano - Frosinone,
  • COTRAL, Pontecorvo - Frosinone,
  • COTRAL, Amaseno - Frosinone,
  • COTRAL, Strangolagalli - Frosinone,
  • COTRAL, Cassino - Frosinone,
  • COTRAL, Castro Dei Volsci - Frosinone,
  • COTRAL, Castrocielo - Frosinone,
  • COTRAL, Boville Ernica - Industrial Zone,
  • COTRAL, Industrial Zone - Ferentino,
  • COTRAL, Veroli - Frosinone,
  • COTRAL, Cassino - Ferentino,
  • COTRAL, Ceprano - Frosinone,
  • COTRAL, Vallecorsa - Frosinone,
  • E, Circular (Center > Madonna della Neve),
  • 13, Center - Selva Piana,
  • COTRAL, Frosinone - Cassino,
  • COTRAL, Frosinone - Pontecorvo,
Questions & Answers
  • What are the closest stations to The Tobacco Shop Curve?

    The closest stations to The Tobacco Shop Curve are:

    • Frosinone | America Latina Avenue Vignali Road stop is 121 meters away, 2 min walk.
    • Frosinone | Latin America Avenue Verdi Avenue stop is 652 meters away, 9 min walk.
    • Frosinone - Via Gaeta Via Verdi stop is 682 meters away, 9 min walk.
    • Frosinone | Jacobucci Street Verdi Avenue stop is 700 meters away, 10 min walk.
    • Frosinone | Puccini Street stop is 1435 meters away, 19 min walk.
  • Which bus lines stop near The Tobacco Shop Curve?

    These bus lines stop near The Tobacco Shop Curve: 13, COTRAL, D, EN.

  • Which train line stops near The Tobacco Shop Curve?

    FL6 (Cassino)

  • What’s the nearest bus station to The Tobacco Shop Curve in Frosinone?

    The nearest bus station to The Tobacco Shop Curve in Frosinone is Frosinone | America Latina Avenue Vignali Road. It’s a 2 min walk away.

  • What time is the first train to The Tobacco Shop Curve in Frosinone?

    The FL6 is the first train that goes to The Tobacco Shop Curve in Frosinone. It stops nearby at 5:00 AM.

  • What time is the last train to The Tobacco Shop Curve in Frosinone?

    The FL6 is the last train that goes to The Tobacco Shop Curve in Frosinone. It stops nearby at 11:40 PM.

  • What time is the first bus to The Tobacco Shop Curve in Frosinone?

    The COTRAL is the first bus that goes to The Tobacco Shop Curve in Frosinone. It stops nearby at 3:59 AM.

  • What time is the last bus to The Tobacco Shop Curve in Frosinone?

    The COTRAL is the last bus that goes to The Tobacco Shop Curve in Frosinone. It stops nearby at 11:15 PM.

See The Tobacco Shop Curve, Frosinone, on the map

The Tobacco Shop Curve, Frosinone

Public transit lines with stations closest to The Tobacco Shop Curve in Frosinone

Bus lines with stations closest to The Tobacco Shop Curve in Frosinone