How to Get to Meilenstein in Geneve by Train or Bus?

Directions to Meilenstein (Geneve) with public transportation

The following transit lines have routes that pass near Meilenstein

  • BusBus: 572571.
  • TrainTrain: 48R40RE41RE42.
  • Cable CarCable Car: 2280.
  • FunicularFunicular: 2290.

How to get to Meilenstein by train?

Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.

    Bus stops near Meilenstein in Geneve

    • Zermatt, Wiestiboden, 2 min walk,
    • Zermatt, Kirchbrücke, 7 min walk,

    Train station near Meilenstein in Geneve

    • Zermatt Ferienhaus Legendär, 8 min walk,

    Cable Car station near Meilenstein in Geneve

    • Zermatt (Matterhorn Talstat.), 10 min walk,

    Funicular station near Meilenstein in Geneve

    • Zermatt (Talstation Sunnegga), 14 min walk,

    Bus lines to Meilenstein in Geneve

    • 572, Zermatt, Bahnhof,
    • 571, Zermatt, Spiss,
    Questions & Answers
    • What are the closest stations to Meilenstein?

      The closest stations to Meilenstein are:

      • Zermatt, Wiestiboden is 71 meters away, 2 min walk.
      • Zermatt, Kirchbrücke is 535 meters away, 7 min walk.
      • Zermatt Ferienhaus Legendär is 540 meters away, 8 min walk.
      • Zermatt (Matterhorn Talstat.) is 717 meters away, 10 min walk.
      • Zermatt (Talstation Sunnegga) is 1077 meters away, 14 min walk.
    • Which bus line stops near Meilenstein?

      572 (Zermatt, Vispa‎→Zermatt, Kapelle Winkelmatten)

    • Which train lines stop near Meilenstein?

      These train lines stop near Meilenstein: 48, R40, RE41, RE42.

    • What’s the nearest train station to Meilenstein in Geneve?

      The nearest train station to Meilenstein in Geneve is Zermatt Ferienhaus Legendär. It’s a 8 min walk away.

    • What’s the nearest bus station to Meilenstein in Geneve?

      The nearest bus station to Meilenstein in Geneve is Zermatt, Wiestiboden. It’s a 2 min walk away.

    • What’s the nearest cable car station to Meilenstein in Geneve?

      The nearest cable car station to Meilenstein in Geneve is Zermatt (Matterhorn Talstat.). It’s a 10 min walk away.

    • What’s the nearest funicular station to Meilenstein in Geneve?

      The nearest funicular station to Meilenstein in Geneve is Zermatt (Talstation Sunnegga). It’s a 14 min walk away.

    • What time is the first train to Meilenstein in Geneve?

      The 48 is the first train that goes to Meilenstein in Geneve. It stops nearby at 8:06 AM.

    • What time is the last train to Meilenstein in Geneve?

      The 48 is the last train that goes to Meilenstein in Geneve. It stops nearby at 11:15 PM.

    • What time is the first bus to Meilenstein in Geneve?

      The 571 is the first bus that goes to Meilenstein in Geneve. It stops nearby at 7:06 AM.

    • What time is the last bus to Meilenstein in Geneve?

      The 572 is the last bus that goes to Meilenstein in Geneve. It stops nearby at 7:52 PM.

    • What time is the first cable car to Meilenstein in Geneve?

      The 2280 is the first cable car that goes to Meilenstein in Geneve. It stops nearby at 8:30 AM.

    • What time is the last cable car to Meilenstein in Geneve?

      The 2280 is the last cable car that goes to Meilenstein in Geneve. It stops nearby at 5:07 PM.

    • What time is the first funicular to Meilenstein in Geneve?

      The 2290 is the first funicular that goes to Meilenstein in Geneve. It stops nearby at 8:30 AM.

    • What time is the last funicular to Meilenstein in Geneve?

      The 2290 is the last funicular that goes to Meilenstein in Geneve. It stops nearby at 5:35 PM.

    See Meilenstein, Geneve, on the map

    Public Transit to Meilenstein in Geneve

    Wondering how to get to Meilenstein in Geneve? Moovit helps you find the best way to get to Meilenstein with step-by-step directions from the nearest public transit station.

    Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Meilenstein in real time.

    Looking for the nearest stop or station to Meilenstein? Check out this list of stops closest to your destination: Zermatt; Zermatt; Zermatt Ferienhaus Legendär; Zermatt (Matterhorn Talstat.); Zermatt (Talstation Sunnegga).

    Bus: 572571.Train: 48R40RE41RE42.Cable Car: 2280.Funicular: 2290.

    Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Meilenstein easily from the Moovit App or Website.

    We make riding to Meilenstein easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

    For information on prices of train and bus, costs and ride fares to Meilenstein, please check the Moovit app.

    Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

    Location: Geneve

    Meilenstein

    Get around Geneve by public transit!

    Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.

    When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

    Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.

    Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, Société Nationale des Chemins de fer Français, TPG, Interimsfahrplan / Horaire interimaire / Orario ad interim, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomération d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics Neuchâtelois SA (tc), But, PostAuto AG, Transports Publics de la Région Nyonnaise and SMGN

    Public transit lines with stations closest to Meilenstein in Geneve

    Train lines with stations closest to Meilenstein in Geneve

    Bus lines with stations closest to Meilenstein in Geneve

    Cable Car lines with stations closest to Meilenstein in Geneve

    Funicular lines with stations closest to Meilenstein in Geneve