How to Get to Meilenstein in Wiesloch by Bus, Train or Light Rail?

Directions to Meilenstein (Wiesloch) with public transportation

The following transit lines have routes that pass near Meilenstein

  • TrainTrain: RE 73, RE71, S3, RE40, RB68.
  • BusBus: 703, 706, 708, 723, 799.

How to get to Meilenstein by bus?

Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.

How to get to Meilenstein by train?

Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.

Bus stops near Meilenstein in Wiesloch

  • Wiesloch, Festplatz, 2 min walk,
  • Wiesloch, Gerbersruhschule, 7 min walk,
  • Wiesloch, Ringstraße, 8 min walk,

Train station near Meilenstein in Wiesloch

  • Wiesloch-Walldorf, Bf, 29 min walk,

Bus lines to Meilenstein in Wiesloch

  • 705, St. Leon, Reilingerstraße,
  • 793, Wiesloch, Schillerstraße,
  • 709, Wiesloch-Walldorf, Bf,
  • 702, Rot-Malsch, Bahnhof - Wiesloch-Walldorf, Bf Bstg A,
  • 703, Waldangelloch, Rathaus - Wiesloch-Walldorf, Bf Bstg D,
  • 706, Wiesloch, Ringstraße Bstg C - Walldorf, IKEA,
  • 707, Wiesloch-Walldorf, Bf Bstg West2 - Walldorf, SAP Campus,
  • 708, Walldorf, Schulzentrum - Wiesloch, Ringstraße Bstg C,
  • 723, Wiesloch, Güterstraße Bstg A - Leimen, Kurpfalz-Centrum Bstg B,
  • 724, Nußloch, Lindenplatz - Heidelberg, Bismarckplatz Bstg F,
  • 7910, Wiesloch-Walldorf, Bf Bstg West1 - Balzfeld, Ort,
  • 7932, Wiesloch, Ringstraße Bstg B - Schatthausen, Kirche,
  • 7933, Wiesloch, Eichendorffstraße - Wiesloch, Eichendorffstraße,
  • 7934, Wiesloch-Walldorf, Bf Bstg West1 - Wiesloch, PZN,
Questions & Answers
  • What are the closest stations to Meilenstein?

    The closest stations to Meilenstein are:

    • Wiesloch, Festplatz stop is 116 meters away, 2 min walk.
    • Wiesloch, Gerbersruhschule stop is 526 meters away, 7 min walk.
    • Wiesloch, Ringstraße stop is 580 meters away, 8 min walk.
    • Wiesloch-Walldorf, Bf station is 2232 meters away, 29 min walk.
  • Which train lines stop near Meilenstein?

    These train lines stop near Meilenstein: RE 73, RE71, S3.

  • Which bus lines stop near Meilenstein?

    These bus lines stop near Meilenstein: 703, 706, 708, 723, 799.

  • What’s the nearest train station to Meilenstein in Wiesloch?

    The nearest train station to Meilenstein in Wiesloch is Wiesloch-Walldorf, Bf. It’s a 29 min walk away.

  • What’s the nearest bus station to Meilenstein in Wiesloch?

    The nearest bus station to Meilenstein in Wiesloch is Wiesloch, Festplatz. It’s a 2 min walk away.

  • What time is the first train to Meilenstein in Wiesloch?

    The S3 is the first train that goes to Meilenstein in Wiesloch. It stops nearby at 4:13 AM.

  • What time is the last train to Meilenstein in Wiesloch?

    The S3 is the last train that goes to Meilenstein in Wiesloch. It stops nearby at 1:52 AM.

See Meilenstein, Wiesloch, on the map

Public Transit to Meilenstein in Wiesloch

Wondering how to get to Meilenstein in Wiesloch? Moovit helps you find the best way to get to Meilenstein with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Meilenstein in real time.

Looking for the nearest stop or station to Meilenstein? Check out this list of stops closest to your destination: Wiesloch, Festplatz; Wiesloch, Gerbersruhschule; Wiesloch, Ringstraße; Wiesloch-Walldorf.

Train: RE 73, RE71, S3, RE40, RB68, RE73.Bus: 703, 706, 708, 723, 799, 705, 793, 709, 702, 707.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Meilenstein easily from the Moovit App or Website.

We make riding to Meilenstein easy, which is why over 1.7 billion users, including users in Wiesloch, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of bus, train and light rail, costs and ride fares to Meilenstein, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Meilenstein Address: Gerbersruhstraße in Wiesloch

Meilenstein, Wiesloch

Public transit lines with stations closest to Meilenstein in Wiesloch

Train lines with stations closest to Meilenstein in Wiesloch

Bus lines with stations closest to Meilenstein in Wiesloch