Directions to Meilenstein (Malta) with public transportation
The following transit lines have routes that pass near Meilenstein
Bus: 140 (EHEM. 5130), 141, 140.
Bus stops near Meilenstein in Malta
- Malta Hochalmstraße Hotel Pirker, 11 min walk,
Bus lines to Meilenstein in Malta
- 141, Gmünd In Ktn Busterminal,
- 140, Malta Hochalmstraße Hotel Pirker,
- Wiesenblock,
- Alligator,
- Schleierfall,
- Klettergebiet,
- Pirkers Natur & Bio Familienhotel,
- Kinderhotel Benjamin,
- Tesla,
- Kerschhacklhütte Maltatal,
- Zundel'sche Forstverwaltung Malta,
- Mautstelle Hochalm Straße,
- Malta-Hochalm-Straße,
- Malta Gasthaus Falleralm Mautstelle,
- Mautstation,
- Falleralm,
- Alpenrestaurant Fallerhütte,
- Andrea Feistritzer - Feistritzer Andrea,
- Fallerhütte,
- Gmünder Hutte,
- Bienenlehrpfad,
- 1. Fallertumpf
Places Near Meilenstein (Malta)
- Narrenturm, Alsergrund,
- Meidlinger Tor, Hietzing,
- Altes Akh, Alsergrund,
- Kabarett Simpl, 1., Innere Stadt,
- Shopping City Süd, Gemeinde Vösendorf,
- Mooserwirt, Gemeinde Sankt Anton am Arlberg,
- Strandbad Gänsehäufel, Donaustadt,
- Lugner City, Rudolfsheim-Fünfhaus,
- Auhof-Center, Penzing,
- Karmelitermarkt, Leopoldstadt,
- Feuerhalle Simmering, Simmering,
- Ronacher, 1., Innere Stadt,
- Skidanje Crne Magije Hodja U Becu, 1., Innere Stadt,
- Setagayapark, Döbling,
- Lkh Salzburg,
- Klinik Floridsdorf (Krankenhaus Nord), Floridsdorf,
- Friedhof Ottakring, Ottakring,
- Wildpark Feldkirch, Stadt Feldkirch,
- Böhmischer Prater, Favoriten,
- Ernst-Happel-Stadion (Wiener Praterstadion), Leopoldstadt
How to get to popular places in Austria with public transit
What are the closest stations to Meilenstein?
The closest stations to Meilenstein are:
- Malta Hochalmstraße Hotel Pirker stop is 835 meters away, 11 min walk.
Which bus lines stop near Meilenstein?
These bus lines stop near Meilenstein: 140 (EHEM. 5130), 141.
What’s the nearest bus station to Meilenstein in Malta?
The nearest bus station to Meilenstein in Malta is Malta Hochalmstraße Hotel Pirker. It’s a 11 min walk away.
What time is the first bus to Meilenstein in Malta?
The 141 is the first bus that goes to Meilenstein in Malta. It stops nearby at 6:21 AM.
What time is the last bus to Meilenstein in Malta?
The 141 is the last bus that goes to Meilenstein in Malta. It stops nearby at 5:36 PM.
See Meilenstein, Malta, on the map
Public Transit to Meilenstein in Malta
Wondering how to get to Meilenstein in Malta? Moovit helps you find the best way to get to Meilenstein with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Meilenstein in real time.
Looking for the nearest stop or station to Meilenstein? Check out this list of stops closest to your destination: Malta Hochalmstraße Hotel Pirker.
Bus: 140 (EHEM. 5130), 141, 140.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Meilenstein easily from the Moovit App or Website.
We make riding to Meilenstein easy, which is why over 1.7 billion users, including users in Malta, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and train, costs and ride fares to Meilenstein, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Location: Malta, Austria