How to Get to Meilenstein Berlin/Zürich in Geneve by Train or Bus?

Directions to Meilenstein Berlin/Zürich (Geneve) with public transportation

The following transit lines have routes that pass near Meilenstein Berlin/Zürich

  • BusBus: 31N1EV2N3N4.
  • TrainTrain: IC1IC5S111524.
  • FunicularFunicular: 24.

How to get to Meilenstein Berlin/Zürich by bus?

Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.

    How to get to Meilenstein Berlin/Zürich by train?

    Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.

    Train station near Meilenstein Berlin/Zürich in Geneve

    • Zürich Hb, 2 min walk,

    Light Rail stations near Meilenstein Berlin/Zürich in Geneve

    • Zürich, Bahnhofquai/Hb, 2 min walk,
    • Zürich, Central, 8 min walk,

    Funicular station near Meilenstein Berlin/Zürich in Geneve

    • Zürich Polyterrasse, 2 min walk,

    Bus stop near Meilenstein Berlin/Zürich in Geneve

    • Zürich, Bahnhofplatz/Hb, 4 min walk,

    Bus lines to Meilenstein Berlin/Zürich in Geneve

    • N1, Zürich, Hermetschloo,
    • EV2, Zürich, Bahnhofplatz/Hb,
    • N3, Zürich, Bahnhofplatz/Hb,
    • N4, Zürich, Bahnhofplatz/Hb,
    • N6, Stettbach, Bahnhof,
    • N7, Zürich, Bahnhofplatz/Hb,
    • 9, Zürich Wiedikon, Bahnhof,
    • 10, Zürich, Bahnhofplatz/Hb,
    • N10, Zürich Flughafen, Bahnhof,
    • N13, Zürich, Bahnhofplatz/Hb,
    • N14, Zürich, Bahnhofplatz/Hb,
    • 15, Zürich, Klusplatz,
    • 33, Zürich, Triemli,
    • N71, Zürich, Bahnhofplatz/Hb,
    • N74, Zürich, Bahnhofplatz/Hb,
    • N91, Itschnach, Fallacher,
    Questions & Answers
    • What are the closest stations to Meilenstein Berlin/Zürich?

      The closest stations to Meilenstein Berlin/Zürich are:

      • Zürich Hb is 79 meters away, 2 min walk.
      • Zürich, Bahnhofquai/Hb is 92 meters away, 2 min walk.
      • Zürich Polyterrasse is 99 meters away, 2 min walk.
      • Zürich, Bahnhofplatz/Hb is 260 meters away, 4 min walk.
      • Zürich, Central is 539 meters away, 8 min walk.
    • Which bus line stops near Meilenstein Berlin/Zürich?

      31 (Zürich, Hermetschloo‎→Zürich, Kienastenwies)

    • Which train lines stop near Meilenstein Berlin/Zürich?

      These train lines stop near Meilenstein Berlin/Zürich: IC1, IC5, S11.

    • What’s the nearest light rail station to Meilenstein Berlin/Zürich in Geneve?

      The nearest light rail station to Meilenstein Berlin/Zürich in Geneve is Zürich, Bahnhofquai/Hb. It’s a 2 min walk away.

    • What’s the nearest train station to Meilenstein Berlin/Zürich in Geneve?

      The nearest train station to Meilenstein Berlin/Zürich in Geneve is Zürich Hb. It’s a 2 min walk away.

    • What’s the nearest bus station to Meilenstein Berlin/Zürich in Geneve?

      The nearest bus station to Meilenstein Berlin/Zürich in Geneve is Zürich, Bahnhofplatz/Hb. It’s a 4 min walk away.

    • What’s the nearest funicular station to Meilenstein Berlin/Zürich in Geneve?

      The nearest funicular station to Meilenstein Berlin/Zürich in Geneve is Zürich Polyterrasse. It’s a 2 min walk away.

    • What time is the first light rail to Meilenstein Berlin/Zürich in Geneve?

      The 10 is the first light rail that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 4:52 AM.

    • What time is the last light rail to Meilenstein Berlin/Zürich in Geneve?

      The 11 is the last light rail that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 1:13 AM.

    • What time is the first train to Meilenstein Berlin/Zürich in Geneve?

      The S is the first train that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 4:33 AM.

    • What time is the last train to Meilenstein Berlin/Zürich in Geneve?

      The IR36 is the last train that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 1:24 AM.

    • What time is the first bus to Meilenstein Berlin/Zürich in Geneve?

      The 31 is the first bus that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 4:38 AM.

    • What time is the last bus to Meilenstein Berlin/Zürich in Geneve?

      The 31 is the last bus that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 1:12 AM.

    • What time is the first funicular to Meilenstein Berlin/Zürich in Geneve?

      The 24 is the first funicular that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 6:30 AM.

    • What time is the last funicular to Meilenstein Berlin/Zürich in Geneve?

      The 24 is the last funicular that goes to Meilenstein Berlin/Zürich in Geneve. It stops nearby at 9:03 PM.

    See Meilenstein Berlin/Zürich, Geneve, on the map

    Public Transit to Meilenstein Berlin/Zürich in Geneve

    Wondering how to get to Meilenstein Berlin/Zürich in Geneve? Moovit helps you find the best way to get to Meilenstein Berlin/Zürich with step-by-step directions from the nearest public transit station.

    Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Meilenstein Berlin/Zürich in real time.

    Looking for the nearest stop or station to Meilenstein Berlin/Zürich? Check out this list of stops closest to your destination: Zürich Hb; Zürich; Zürich Polyterrasse; Zürich; Zürich.

    Bus: 31N1EV2N3N4N6.Train: IC1IC5S111524612BECEXT.Funicular: 24.

    Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Meilenstein Berlin/Zürich easily from the Moovit App or Website.

    We make riding to Meilenstein Berlin/Zürich easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

    For information on prices of train and bus, costs and ride fares to Meilenstein Berlin/Zürich, please check the Moovit app.

    Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

    Meilenstein Berlin/Zürich Address: Bahnhofbrücke street in Geneve

    Meilenstein Berlin/Zürich

    Get around Geneve by public transit!

    Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.

    When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

    Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.

    Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, Société Nationale des Chemins de fer Français, TPG, Interimsfahrplan / Horaire interimaire / Orario ad interim, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomération d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics Neuchâtelois SA (tc), But, PostAuto AG, Transports Publics de la Région Nyonnaise and SMGN

    Public transit lines with stations closest to Meilenstein Berlin/Zürich in Geneve

    Train lines with stations closest to Meilenstein Berlin/Zürich in Geneve

    Bus lines with stations closest to Meilenstein Berlin/Zürich in Geneve

    Funicular lines with stations closest to Meilenstein Berlin/Zürich in Geneve