Directions to Meilenstein Finanz & Beratungs AG (Geneve) with public transportation
The following transit lines have routes that pass near Meilenstein Finanz & Beratungs AG
Bus: N92, 921, 922, 923, 925.
Train: S6, S7, EXT, S16, S20.
Ferry: 3730, 3735.
How to get to Meilenstein Finanz & Beratungs AG by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
Train station near Meilenstein Finanz & Beratungs AG in Geneve
- Meilen, 1 min walk,
Bus stop near Meilenstein Finanz & Beratungs AG in Geneve
- Meilen, Bahnhof, 2 min walk,
Ferry stations near Meilenstein Finanz & Beratungs AG in Geneve
- Meilen (See), 6 min walk,
- Meilen Autoquai, 8 min walk,
Bus lines to Meilenstein Finanz & Beratungs AG in Geneve
- N92, Stäfa, Binz,
- 921, Meilen, Bahnhof,
- 922, Meilen, Bahnhof,
- 923, Meilen, Bahnhof,
- 925, Meilen, Bahnhof,
What are the closest stations to Meilenstein Finanz & Beratungs AG?
The closest stations to Meilenstein Finanz & Beratungs AG are:
- Meilen is 69 meters away, 1 min walk.
- Meilen, Bahnhof is 88 meters away, 2 min walk.
- Meilen (See) is 422 meters away, 6 min walk.
- Meilen Autoquai is 586 meters away, 8 min walk.
Which train lines stop near Meilenstein Finanz & Beratungs AG?
These train lines stop near Meilenstein Finanz & Beratungs AG: S6, S7.
What’s the nearest train station to Meilenstein Finanz & Beratungs AG in Geneve?
The nearest train station to Meilenstein Finanz & Beratungs AG in Geneve is Meilen. It’s a 1 min walk away.
What’s the nearest bus station to Meilenstein Finanz & Beratungs AG in Geneve?
The nearest bus station to Meilenstein Finanz & Beratungs AG in Geneve is Meilen, Bahnhof. It’s a 2 min walk away.
What’s the nearest ferry station to Meilenstein Finanz & Beratungs AG in Geneve?
The nearest ferry station to Meilenstein Finanz & Beratungs AG in Geneve is Meilen (See). It’s a 6 min walk away.
What time is the first train to Meilenstein Finanz & Beratungs AG in Geneve?
The S16 is the first train that goes to Meilenstein Finanz & Beratungs AG in Geneve. It stops nearby at 4:47 AM.
What time is the last train to Meilenstein Finanz & Beratungs AG in Geneve?
The S16 is the last train that goes to Meilenstein Finanz & Beratungs AG in Geneve. It stops nearby at 12:43 AM.
What time is the first bus to Meilenstein Finanz & Beratungs AG in Geneve?
The 925 is the first bus that goes to Meilenstein Finanz & Beratungs AG in Geneve. It stops nearby at 5:12 AM.
What time is the last bus to Meilenstein Finanz & Beratungs AG in Geneve?
The 923 is the last bus that goes to Meilenstein Finanz & Beratungs AG in Geneve. It stops nearby at 1:07 AM.
What time is the first ferry to Meilenstein Finanz & Beratungs AG in Geneve?
The 3735 is the first ferry that goes to Meilenstein Finanz & Beratungs AG in Geneve. It stops nearby at 6:10 AM.
What time is the last ferry to Meilenstein Finanz & Beratungs AG in Geneve?
The 3735 is the last ferry that goes to Meilenstein Finanz & Beratungs AG in Geneve. It stops nearby at 10:00 PM.
See Meilenstein Finanz & Beratungs AG, Geneve, on the map
Public Transit to Meilenstein Finanz & Beratungs AG in Geneve
Wondering how to get to Meilenstein Finanz & Beratungs AG in Geneve? Moovit helps you find the best way to get to Meilenstein Finanz & Beratungs AG with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Meilenstein Finanz & Beratungs AG in real time.
Looking for the nearest stop or station to Meilenstein Finanz & Beratungs AG? Check out this list of stops closest to your destination: Meilen; Meilen; Meilen (See); Meilen Autoquai.
Bus: N92, 921, 922, 923, 925.Train: S6, S7, EXT, S16, S20.Ferry: 3730, 3735.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Meilenstein Finanz & Beratungs AG easily from the Moovit App or Website.
We make riding to Meilenstein Finanz & Beratungs AG easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of train and light rail, costs and ride fares to Meilenstein Finanz & Beratungs AG, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Meilenstein Finanz & Beratungs AG Address: Meilenstein Finanz & Beratungs AG, Kirchgasse 28, 8706 Meilen ZĂ¼rich street in Geneve
- Raiffeisen Bank,
- Schöllkopf & Partner,
- Restaurant 27 by Livin,
- Cinelution,
- Audio-Video-Technik Benz,
- Chiropraktik Meilen,
- Lb Concept,
- Von Arx Media,
- Viscardi Software Development,
- Gabriela Kangus,
- Gr Transfert,
- Blumental,
- Frieden,
- Restaurant Frieden,
- Newbury Media & Communications GmbH,
- Zum Lämmli,
- Anjaly,
- Zahnarzt,
- Flowerbar Meilen,
- Infotech Consulting Martin Kopp
Places Near Meilenstein Finanz & Beratungs AG (Geneve)
- Gare de Genève Cornavin, Genève,
- Clinique La Lignière, Gland,
- Clinique Générale Beaulieu, Genève,
- Hôpital, Genève,
- Palexpo, Le Grand-Saconnex,
- Balexert, Vernier,
- Otto's,
- HĂ´pital des Trois-ChĂªne, ThĂ´nex,
- Office Cantonal Des Véhicules, Carouge (Ge),
- La Praille, Carouge (Ge),
- HUG - Hôpitaux Universitaires de Genève, Genève,
- Conforama, Meyrin,
- Place Dorcière, Genève,
- Cimetière De St.-Georges, Genève,
- Stade de Genève, Carouge (Ge),
- Ferney-Voltaire,
- IKEA Vernier, Vernier,
- Centre de Loisir Vitam'parc,
- Route de Peney, Vernier,
- IKEA, Vernier
How to get to popular places in Geneve with public transit
Get around Geneve by public transit!
Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.
When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.
Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, SociĂ©tĂ© Nationale des Chemins de fer Français, TPG, Interimsfahrplan / Horaire interimaire / Orario ad interim, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomĂ©ration d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics NeuchĂ¢telois SA (tc), But, PostAuto AG, Transports Publics de la RĂ©gion Nyonnaise and SMGN