Directions to Project Control Expert Kft. (Budapest) with public transportation
The following transit lines have routes that pass near Project Control Expert Kft.
Bus: 105, 120, 15, 20E, 34.
Metro: M3.
How to get to Project Control Expert Kft. by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Project Control Expert Kft. by metro?
Click on the metro route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Project Control Expert Kft. in Budapest
- Újpest-Városkapu M (Váci Út), 7 min walk,
- Szekszárdi Utca, 7 min walk,
- Újpest-Városkapu M, 10 min walk,
- Cziffra György Park, 10 min walk,
- Gyöngyösi Utca M, 12 min walk,
- Aradi Utca, 14 min walk,
- Újpest-Városkapu M (Temesvári Utca), 14 min walk,
Metro station near Project Control Expert Kft. in Budapest
- Gyöngyösi Utca, 13 min walk,
Light Rail stations near Project Control Expert Kft. in Budapest
- Tél Utca / Pozsonyi Utca, 14 min walk,
Bus lines to Project Control Expert Kft. in Budapest
- 950, Pestszentimre Vá.,
- 985, Kőbánya Alsó Vasútáll.,
- 120, Újpest-Központ M,
- 950A, Pestszentlőrinc,
- 122E, Káp.Megyer, Mogyoródi-P.,
- 105, Apor Vilmos Tér,
- 210, Gyöngyösi Utca M,
- 210B, Normafa,
- 15, Gyöngyösi Utca M,
- 121, Újpest-Városkapu M,
- 196A, Újpalota, Szentmihályi Út,
What are the closest stations to Project Control Expert Kft.?
The closest stations to Project Control Expert Kft. are:
- Újpest-Városkapu M (Váci Út) stop is 490 meters away, 7 min walk.
- Szekszárdi Utca stop is 522 meters away, 7 min walk.
- Újpest-Városkapu M stop is 735 meters away, 10 min walk.
- Cziffra György Park stop is 759 meters away, 10 min walk.
- Gyöngyösi Utca M stop is 932 meters away, 12 min walk.
- Gyöngyösi Utca station is 997 meters away, 13 min walk.
- Aradi Utca stop is 1050 meters away, 14 min walk.
- Tél Utca / Pozsonyi Utca station is 1113 meters away, 14 min walk.
- Újpest-Városkapu M (Temesvári Utca) stop is 1115 meters away, 14 min walk.
Which bus lines stop near Project Control Expert Kft.?
These bus lines stop near Project Control Expert Kft.: 105, 120, 15, 20E, 34.
Which metro line stops near Project Control Expert Kft.?
M3 (Újpest-Központ)
What’s the nearest light rail station to Project Control Expert Kft. in Budapest?
The nearest light rail station to Project Control Expert Kft. in Budapest is Tél Utca / Pozsonyi Utca. It’s a 14 min walk away.
What’s the nearest metro station to Project Control Expert Kft. in Budapest?
The nearest metro station to Project Control Expert Kft. in Budapest is Gyöngyösi Utca. It’s a 13 min walk away.
What’s the nearest bus station to Project Control Expert Kft. in Budapest?
The nearest bus stations to Project Control Expert Kft. in Budapest are Újpest-Városkapu M (Váci Út) and Szekszárdi Utca. The closest one is a 7 min walk away.
What time is the first light rail to Project Control Expert Kft. in Budapest?
The 14 is the first light rail that goes to Project Control Expert Kft. in Budapest. It stops nearby at 3:42 AM.
What time is the last light rail to Project Control Expert Kft. in Budapest?
The 14 is the last light rail that goes to Project Control Expert Kft. in Budapest. It stops nearby at 12:53 AM.
What time is the first metro to Project Control Expert Kft. in Budapest?
The M3 is the first metro that goes to Project Control Expert Kft. in Budapest. It stops nearby at 4:23 AM.
What time is the last metro to Project Control Expert Kft. in Budapest?
The M3 is the last metro that goes to Project Control Expert Kft. in Budapest. It stops nearby at 12:17 AM.
What time is the first bus to Project Control Expert Kft. in Budapest?
The 950A is the first bus that goes to Project Control Expert Kft. in Budapest. It stops nearby at 3:02 AM.
What time is the last bus to Project Control Expert Kft. in Budapest?
The 950 is the last bus that goes to Project Control Expert Kft. in Budapest. It stops nearby at 4:05 AM.
See Project Control Expert Kft., Budapest, on the map
Public Transit to Project Control Expert Kft. in Budapest
Wondering how to get to Project Control Expert Kft. in Budapest? Moovit helps you find the best way to get to Project Control Expert Kft. with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Project Control Expert Kft. in real time.
Looking for the nearest stop or station to Project Control Expert Kft.? Check out this list of stops closest to your destination: Újpest-Városkapu M (Váci Út); Szekszárdi Utca; Újpest-Városkapu M; Cziffra György Park; Gyöngyösi Utca M; Gyöngyösi Utca; Aradi Utca; Tél Utca / Pozsonyi Utca; Újpest-Városkapu M (Temesvári Utca).
Bus: 105, 120, 15, 20E, 34, 950, 985, 950A, 122E, 210, 210B.Metro: M3.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Project Control Expert Kft. easily from the Moovit App or Website.
We make riding to Project Control Expert Kft. easy, which is why over 1.7 billion users, including users in Budapest, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, metro and light rail, costs and ride fares to Project Control Expert Kft., please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Project Control Expert Kft. Address: Madarász Viktor utca 47 street in Budapest
- Stylers Academy,
- Cvonline.Hu Állások,
- Ceratizit Magyarország Kft.,
- Madarász Ultrahang,
- Innovus International Kft,
- Mikrum,
- Sportkardiológia,
- Esense Human Resources Services,
- Medical Point Egészségközpont,
- Varga Sándor Masszázsterapeuta,
- Afgm Europe,
- Nofilter Beauty Center Kozmetika Szépségszalon,
- Stylers Group,
- Credit Control Ltd.,
- Dr. Pál Mónika,
- Madarász Irodapark,
- Osram Automotive,
- Eurogate Rail Hungary Zrt.,
- Exsun Solar Construction,
- Appsint Ltd.
Places Near Project Control Expert Kft. (Budapest)
- Népliget autóbusz-pályaudvar, Budapest,
- Honvéd Kórház, Budapest,
- Duna Plaza Bevásárlóközpont, Budapest,
- Szent István kórház R épület MR, Budapest,
- Métro Nyugati pályaudvar (M3) (Nyugati pályaudvar (M3)), Budapest,
- Péterfy Sándor Utcai Kórház, Budapest,
- Ózd-Nagybátony-Budapest buszjárat, Budapest,
- Karmelita Kolostor, Budapest,
- Erkel Színház, Budapest,
- Budapest Park, Budapest,
- Városliget, Budapest,
- Fővárosi Nagycirkusz, Budapest,
- türelmi zóna, Budapest,
- Mária utca 39, Budapest,
- Stadion autóbusz-pályaudvar, Budapest,
- Bakancsos Utcai Piac, Budapest,
- Budai Várnegyed, Budapest,
- Etele Plaza, Budapest,
- Üllői út 78, Budapest,
- Halászbástya, Budapest
How to get to popular places in Budapest with public transit
Get around Budapest by public transit!
Traveling around Budapest has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Budapest.
When traveling to any destination around Budapest use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Budapest or how to pay for public transit in Budapest? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Budapest public transit lines? Moovit public transit app shows all public transit maps in Budapest with all Bus, Train, Metro, Light Rail and Ferry routes and stops on an interactive map.
Budapest has 5 transit type(s), including: Bus, Train, Metro, Light Rail and Ferry, operated by several transit agencies, including BKK, MÁV Személyszállítási Zrt. - HÉV and miniBUD