Directions to Project Networks Gmbh (Lichtenberg) with public transportation
The following transit lines have routes that pass near Project Networks Gmbh
Train: S41, S42, S8, S85.
Subway:Â U5.
Light Rail:Â M13.
Bus: 108, 240, M43, N5, N50.
How to get to Project Networks Gmbh by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Project Networks Gmbh by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Project Networks Gmbh by subway?
Click on the subway route to see step by step directions with maps, line arrival times and updated time schedules.
Subway station near Project Networks Gmbh in Lichtenberg
- S+U Frankfurter Allee, 2 min walk,
Light Rail stations near Project Networks Gmbh in Lichtenberg
- S+U Frankfurter Allee, 2 min walk,
Bus stops near Project Networks Gmbh in Lichtenberg
- U Magdalenenstr./Buchberger Str., 3 min walk,
- Atzpodienstr., 4 min walk,
- Holteistr., 11 min walk,
Train stations near Project Networks Gmbh in Lichtenberg
- S+U Frankfurter Allee, 3 min walk,
Bus lines to Project Networks Gmbh in Lichtenberg
- N5, Riesaer Str.,
- N50, U Tierpark,
- N94, U Magdalenenstr./Buchberger Str.,
- N56, U Magdalenenstr./Buchberger Str.,
- 240, S Storkower Str.,
- 21, Wismarplatz,
- N40, S+U Berlin Hauptbahnhof,
What are the closest stations to Project Networks Gmbh?
The closest stations to Project Networks Gmbh are:
- S+U Frankfurter Allee station is 116 meters away, 2 min walk.
- U Magdalenenstr./Buchberger Str. stop is 182 meters away, 3 min walk.
- Atzpodienstr. stop is 292 meters away, 4 min walk.
- Holteistr. stop is 858 meters away, 11 min walk.
Which train lines stop near Project Networks Gmbh?
These train lines stop near Project Networks Gmbh: S41, S42, S8, S85.
Which subway line stops near Project Networks Gmbh?
U5 (U Hönow)
Which light rail line stops near Project Networks Gmbh?
M13 (Wedding, Virchow-Klinikum)
Which bus lines stop near Project Networks Gmbh?
These bus lines stop near Project Networks Gmbh: 108, 240, M43.
What’s the nearest light rail station to Project Networks Gmbh in Lichtenberg?
The nearest light rail station to Project Networks Gmbh in Lichtenberg is S+U Frankfurter Allee. It’s a 2 min walk away.
What’s the nearest subway station to Project Networks Gmbh in Lichtenberg?
The nearest subway station to Project Networks Gmbh in Lichtenberg is S+U Frankfurter Allee. It’s a 2 min walk away.
What’s the nearest train station to Project Networks Gmbh in Lichtenberg?
The nearest train station to Project Networks Gmbh in Lichtenberg is S+U Frankfurter Allee. It’s a 3 min walk away.
What’s the nearest bus station to Project Networks Gmbh in Lichtenberg?
The nearest bus station to Project Networks Gmbh in Lichtenberg is U Magdalenenstr./Buchberger Str.. It’s a 3 min walk away.
What time is the first light rail to Project Networks Gmbh in Lichtenberg?
The M13 is the first light rail that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 3:05 AM.
What time is the last light rail to Project Networks Gmbh in Lichtenberg?
The M13 is the last light rail that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 3:11 AM.
What time is the first subway to Project Networks Gmbh in Lichtenberg?
The U5 is the first subway that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 3:55 AM.
What time is the last subway to Project Networks Gmbh in Lichtenberg?
The U5 is the last subway that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 1:09 AM.
What time is the first train to Project Networks Gmbh in Lichtenberg?
The S42 is the first train that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 3:48 AM.
What time is the last train to Project Networks Gmbh in Lichtenberg?
The S41 is the last train that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 1:30 AM.
What time is the first bus to Project Networks Gmbh in Lichtenberg?
The N5 is the first bus that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 3:01 AM.
What time is the last bus to Project Networks Gmbh in Lichtenberg?
The N50 is the last bus that goes to Project Networks Gmbh in Lichtenberg. It stops nearby at 3:48 AM.
See Project Networks Gmbh, Lichtenberg, on the map
Public Transit to Project Networks Gmbh in Lichtenberg
Wondering how to get to Project Networks Gmbh in Lichtenberg? Moovit helps you find the best way to get to Project Networks Gmbh with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Project Networks Gmbh in real time.
Looking for the nearest stop or station to Project Networks Gmbh? Check out this list of stops closest to your destination: S+U Frankfurter Allee; U Magdalenenstr./Buchberger Str.; Atzpodienstr.; Holteistr..
Train: S41, S42, S8, S85.Subway: U5.Light Rail: M13.Bus: 108, 240, M43, N5, N50, N56, N94.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Project Networks Gmbh easily from the Moovit App or Website.
We make riding to Project Networks Gmbh easy, which is why over 1.7 billion users, including users in Lichtenberg, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of train, bus, subway and light rail, costs and ride fares to Project Networks Gmbh, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Project Networks Gmbh Address: Stefan-Heym-Platz 1 street in Lichtenberg
- H S+U-Bahnhof Frankfurter Allee,
- Berlin Frankfurter Allee,
- U-Bahn Gleichrichterwerk Lichtenberg,
- Möllendorffstraße Am Containerbahnhof,
- Ring-Center II,
- Dipl.-Psych. Katia Reinhardt,
- Galeria Kaufhof (GALERIA Karstadt Kaufhof),
- Frankfurter Allee (S+U),
- Niu Hide,
- NH Berlin City Ost,
- U-Bahn-Frankfurter Allee,
- AOK Nordost Servicecenter Lichtenberg,
- Schulze-Boysen-Straße,
- M13 Wedding, Virchow-Klinikum - S Warschauer Straße,
- Bezirksamt Lichtenberg - Bürgeramt 2,
- Augenklinik im Ring-Center,
- Superfit Friedrichshain / Ringcenter,
- FC Union Berlin,
- Ring-Center,
- Normannenstraße 1 - 2
Places Near Project Networks Gmbh (Lichtenberg)
- Checkpoint Charlie, Kreuzberg,
- Arena Berlin, Alt-Treptow,
- Grüne Trift 102, Köpenick,
- Markthalle Neun, Kreuzberg,
- Flixbus Alexanderplatz, Berlin Mitte,
- IKEA Berlin-Tempelhof, Schöneberg,
- IKEA Berlin-Spandau, Spandau,
- St. Gertrauden Krankenhaus, Wilmersdorf,
- Luisenstraße, Berlin Mitte,
- CityCube Berlin, Westend,
- Kadewe, Schöneberg,
- Tierpark Berlin, Friedrichsfelde,
- Humboldtforum, Berlin Mitte,
- Café am Neuen See, Tiergarten,
- Die Wühlmäuse, Westend,
- Messe Berlin, Westend,
- Designer Outlet Berlin, Elstal,
- Columbiahalle, Tempelhof,
- Friedrichstadt-Palast, Berlin Mitte,
- Sven Blümel Zimmerei, Köpenick
How to get to popular places in Berlin - Brandenburg with public transit
Get around Lichtenberg by public transit!
Traveling around Lichtenberg has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Lichtenberg.
When traveling to any destination around Lichtenberg use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Lichtenberg or how to pay for public transit in Lichtenberg? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Lichtenberg public transit lines? Moovit public transit app shows all public transit maps in Lichtenberg with all Bus, Train, Subway, Light Rail and Ferry routes and stops on an interactive map.
Berlin - Brandenburg has 5 transit type(s), including: Bus, Train, Subway, Light Rail and Ferry, operated by several transit agencies, including BVG, VBB, S-Bahn, Cottbusverkehr, Schöneicher Rüdersdorfer Straßenbahn, Strausberger Eisenbahn GmbH, Stadtverkehrsgesellschaft Tram, Verkehrsbetriebe Brandenburg, Verkehrsverbund Potsdam, DB Regio Bus, Barnimer Busgesellschaft, Busverkehr Oder-Spree GmbH, ANG, Busverkehr Gerd Schmidt and Heidenheimer Verkehrsgesellschaft