Directions to Römischer Meilenstein (Ladenburg) with public transportation
The following transit lines have routes that pass near Römischer Meilenstein
Train: RB68, RE60, S6, RB67, RB69.
Bus: 42, 46, 46E, 627, 628.
How to get to Römischer Meilenstein by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Römischer Meilenstein by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
Bus stops near Römischer Meilenstein in Ladenburg
- Ladenburg, Ruckelshausen, 1 min walk,
- Ladenburg, Ankerplatz, 6 min walk,
Train stations near Römischer Meilenstein in Ladenburg
- Ladenburg, Bahnhof, 12 min walk,
Light Rail stations near Römischer Meilenstein in Ladenburg
- Edingen West, 56 min walk,
- Edingen, West Bstg G2, 57 min walk,
Bus lines to Römischer Meilenstein in Ladenburg
- 627, Ladenburg, Carl-Benz-Platz,
- 628, Seckenheim, Rathaus,
- 626, Ilvesheim, Uferstraße,
What are the closest stations to Römischer Meilenstein?
The closest stations to Römischer Meilenstein are:
- Ladenburg, Ruckelshausen stop is 11 meters away, 1 min walk.
- Ladenburg, Ankerplatz stop is 451 meters away, 6 min walk.
- Ladenburg, Bahnhof station is 947 meters away, 12 min walk.
- Edingen West station is 4444 meters away, 56 min walk.
- Edingen, West Bstg G2 station is 4504 meters away, 57 min walk.
Which train lines stop near Römischer Meilenstein?
These train lines stop near Römischer Meilenstein: RB68, RE60.
Which bus lines stop near Römischer Meilenstein?
These bus lines stop near Römischer Meilenstein: 42, 46, 46E.
What’s the nearest train station to Römischer Meilenstein in Ladenburg?
The nearest train station to Römischer Meilenstein in Ladenburg is Ladenburg, Bahnhof. It’s a 12 min walk away.
What’s the nearest bus station to Römischer Meilenstein in Ladenburg?
The nearest bus station to Römischer Meilenstein in Ladenburg is Ladenburg, Ruckelshausen. It’s a 1 min walk away.
What time is the first light rail to Römischer Meilenstein in Ladenburg?
The 5 is the first light rail that goes to Römischer Meilenstein in Ladenburg. It stops nearby at 4:23 AM.
What time is the last light rail to Römischer Meilenstein in Ladenburg?
The E is the last light rail that goes to Römischer Meilenstein in Ladenburg. It stops nearby at 1:35 AM.
What time is the first train to Römischer Meilenstein in Ladenburg?
The RB68 is the first train that goes to Römischer Meilenstein in Ladenburg. It stops nearby at 4:36 AM.
What time is the last train to Römischer Meilenstein in Ladenburg?
The RB68 is the last train that goes to Römischer Meilenstein in Ladenburg. It stops nearby at 1:21 AM.
See Römischer Meilenstein, Ladenburg, on the map
Public Transit to Römischer Meilenstein in Ladenburg
Wondering how to get to Römischer Meilenstein in Ladenburg? Moovit helps you find the best way to get to Römischer Meilenstein with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Römischer Meilenstein in real time.
Looking for the nearest stop or station to Römischer Meilenstein? Check out this list of stops closest to your destination: Ladenburg, Ruckelshausen; Ladenburg, Ankerplatz; Ladenburg, Bahnhof; Edingen West; Edingen.
Train: RB68, RE60, S6, RB67, RB69, S6, RB67, RB69.Bus: 42, 46, 46E, 627, 628, 626.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Römischer Meilenstein easily from the Moovit App or Website.
We make riding to Römischer Meilenstein easy, which is why over 1.7 billion users, including users in Ladenburg, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, train and light rail, costs and ride fares to Römischer Meilenstein, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Römischer Meilenstein Address: Vespasianstraße in Ladenburg
- Eiscafe & Pizzeria Mondello,
- Dr. Brüssau / Dr. Steinacker,
- Merkurplatz,
- Dr. Med. Boris Steinacker & Jürgen Brüssau,
- Bäckerei Grimminger,
- Allerheiligenhäus'L,
- Entdolung Kanzelbach,
- Michael M. Röhr,
- Tennis,
- Guenther'Scher Kindergarten,
- Anbau Gymnasium,
- Tc-Ladenburg E.V.,
- Unterrichtskreis Ladenburg,
- Tennisclub Grün-Weiß Ladenburg E.V.,
- Sühnekreuz,
- Frank Baust Steuerberater,
- Kinderarzt Dr. Med. Christiane Witz,
- Ewto-Wingtsun Schule Ladenburg & Edingen-Neckarhausen,
- Städtische Turnhalle,
- Txp Computer
Places Near Römischer Meilenstein (Ladenburg)
- Hofmeister, Vereinbarte Verwaltungsgemeinschaft Der Stadt Bietigheim-Bissingen,
- Hanns-Martin-Schleyer-Halle (Stuttgart Hans-Martin-Schleyerhalle), Bad Cannstatt,
- Römerkastell, Bad Cannstatt,
- Gasometer Pforzheim, Pforzheim,
- Geilhaus Haus 33a, Reutlingen-Betzingen,
- Epplesee, Rheinstetten,
- Pariser Platz Stuttgart, Stuttgart-Mitte,
- Porsche Museum, Zuffenhausen,
- BG-Unfallklinik, Ludwigshafen-Nördliche Innenstadt,
- Im Wizemann (Halle), Bad Cannstatt,
- Klinikum am Gesundbrunnen, Heilbronn,
- Hauptbahnhof / Arnulf-Klett-Platz, Stuttgart-Mitte,
- FlixBus Haltestelle, Stuttgart,
- Karlshöhe, Stuttgart-Süd,
- Teehaus, Stuttgart-Süd,
- Mercedes-Benz Museum, Bad Cannstatt,
- Marmorsaal Im Weissenburgpark, Stuttgart-Süd,
- Wilhelma (U-Bahn Wilhelma), Bad Cannstatt,
- Bärensee Stuttgart, Stuttgart-West,
- Mercedes-Benz Werk Sindelfingen, Sindelfingen (Stadt)