Directions to Römischer Meilenstein (Niederstotzingen) with public transportation
The following transit lines have routes that pass near Römischer Meilenstein
Train: RS 5, RS5, RS51, RE 50, RS 51.
Bus: 593, 855.
How to get to Römischer Meilenstein by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Römischer Meilenstein by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
Bus stop near Römischer Meilenstein in Niederstotzingen
- Niederstotzingen Pl. De Bages Bstg 1, 1 min walk,
Train stations near Römischer Meilenstein in Niederstotzingen
- Niederstotzingen, 18 min walk,
- Niederstotzingen Bahnhof, 18 min walk,
Bus lines to Römischer Meilenstein in Niederstotzingen
- 593, Langenau Bahnhof,
What are the closest stations to Römischer Meilenstein?
The closest stations to Römischer Meilenstein are:
- Niederstotzingen Pl. De Bages Bstg 1 stop is 43 meters away, 1 min walk.
- Niederstotzingen station is 1394 meters away, 18 min walk.
- Niederstotzingen Bahnhof station is 1397 meters away, 18 min walk.
Which train lines stop near Römischer Meilenstein?
These train lines stop near Römischer Meilenstein: RS 5, RS5, RS51.
Which bus lines stop near Römischer Meilenstein?
These bus lines stop near Römischer Meilenstein: 593, 855.
What’s the nearest train station to Römischer Meilenstein in Niederstotzingen?
The nearest train stations to Römischer Meilenstein in Niederstotzingen are Niederstotzingen and Niederstotzingen Bahnhof. The closest one is a 18 min walk away.
What’s the nearest bus station to Römischer Meilenstein in Niederstotzingen?
The nearest bus station to Römischer Meilenstein in Niederstotzingen is Niederstotzingen Pl. De Bages Bstg 1. It’s a 1 min walk away.
What time is the first train to Römischer Meilenstein in Niederstotzingen?
The RS 51 is the first train that goes to Römischer Meilenstein in Niederstotzingen. It stops nearby at 6:11 AM.
What time is the last train to Römischer Meilenstein in Niederstotzingen?
The RS 51 is the last train that goes to Römischer Meilenstein in Niederstotzingen. It stops nearby at 11:41 PM.
What time is the first bus to Römischer Meilenstein in Niederstotzingen?
The 593 is the first bus that goes to Römischer Meilenstein in Niederstotzingen. It stops nearby at 9:00 AM.
What time is the last bus to Römischer Meilenstein in Niederstotzingen?
The 593 is the last bus that goes to Römischer Meilenstein in Niederstotzingen. It stops nearby at 9:11 PM.
See Römischer Meilenstein, Niederstotzingen, on the map
- Freiwillige Feuerwehr,
- Netto Marken-Discount,
- Pan,
- Krechlack & Träger,
- Eckert Augenzentrum,
- Weeber,
- Metzgerei Schleicher,
- St. Petrus Und Paulus,
- Bocciaplatz,
- Bikercoaching,
- Rinneck,
- Stadtmauer,
- Schloss Niederstotzingen,
- Ernst Haumann Fahrschule,
- Tennis Club,
- Praxis My Way,
- Brunnen Aus Der Römerzeit,
- Schloßpassage,
- Kleintierpraxis am Schloss,
- Näh- Und Änderungservice Haller
Places Near Römischer Meilenstein (Niederstotzingen)
- Mercedes-Benz Werk Tor 3, Untertürkheim,
- BG-Unfallklinik, Ludwigshafen-Nördliche Innenstadt,
- Hofmeister, Vereinbarte Verwaltungsgemeinschaft Der Stadt Bietigheim-Bissingen,
- Hanns-Martin-Schleyer-Halle, Bad Cannstatt,
- Schleyerhalle, Bad Cannstatt,
- Marmorsaal Im Weissenburgpark, Stuttgart-Süd,
- Mercedes-Benz Werk Sindelfingen, Sindelfingen (Stadt),
- Traumpalast Leonberg, Leonberg,
- Epplesee, Rheinstetten,
- Wilhelma (U-Bahn Wilhelma), Bad Cannstatt,
- Milaneo, Stuttgart-Mitte,
- Stadtbibliothek Stuttgart, Stuttgart-Mitte,
- Teehaus, Stuttgart-Süd,
- FlixBus Haltestelle, Stuttgart,
- Hauptbahnhof Stuttgart (Stuttgart Hbf), Stuttgart-Mitte,
- Mercedes-Benz Museum, Bad Cannstatt,
- Gasometer Pforzheim, Pforzheim,
- Gleis 101/102 (tief), Stuttgart-Mitte,
- Klinikum Ludwigsburg, Ludwigsburg,
- Klinikum am Gesundbrunnen, Heilbronn