Directions to Raciò (San Benedetto Del Tronto) with public transportation
The following transit lines have routes that pass near Raciò
Bus:Ā 01EXTR,Ā 1+6,Ā 11,Ā 4,Ā 5.
Train:Ā R.
How to get to Raciò by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Raciò by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
Bus stops near Raciò in San Benedetto Del Tronto
- Via Pizzi No.50, 3 min walk,
- Via Curzi intersection Via Moretti, 4 min walk,
- San Benedetto Tronto - Station, 5 min walk,
- San Benedetto Del Tronto Train Station, 5 min walk,
Bus lines to Raciò in San Benedetto Del Tronto
- 4, Railway Station - Town Hall - Viale dello Sport - Porto d'Ascoli - Val Tiberina - Portogrande,
- 5, Porto d'Ascoli Railway Station - Viale dello Sport - Viale De Gasperi - Railway Station - Via Marsala - Via Tommaseo - Via D'Azeglio - Piazza San Filippo,
- 8, Martinsicuro - Porto d'Ascoli - Train Station - SS16 - Grottammare Station - Upper Town - Cemetery - Swimming Pool - Grottammare Center - Train Station - Porto d'Ascoli - Martinsicuro,
- 1+6, Martinsicuro - Grottammare - Cupra Marittima,
- 3A, Train Station - Cemetery - Acquaviva Industrial Zone - Via Sisto V - Hospital - Train Station,
- 3B, Train Station - Cemetery - Hospital - Train Station,
- 09EXTR, San Benedetto del Tronto - Acquaviva Picena - Offida,
- 10EXTR, Carassai - Montefiore - Massignano - San Benedetto del Tronto,
- 11EXTR, Montedinove - Cossignano - Ripatransone - Cuprense - Grottammare - San Benedetto del Tronto,
- 12EXTR, Montedinove - Cossignano - Ripatransone - Grottammare - Valtesino - San Benedetto del Tronto,
- 23EXTR, Rotella - Montedinove - Montalto Marche - Patrignone - Valtesino - San Benedetto del Tronto - Porto D'Ascoli,
- 24EXTR, Monsampolo del Tronto - Monteprandone-San Benedetto del Tronto,
- 36EXTR, Castignano - Grottammare - San Benedetto del Tronto,
- 01EXTR, Piazza Sciocchetti,
- TRANSFER, Central Maxi Parking,
- A, Via Turati Conad,
- 2F, Porto D'Ascoli Railway Station,
- B, Porto D'Ascoli Railway Station,
- 13EXTR, High School Square,
- 14EXTR, Fermo - San Francesco,
What are the closest stations to Raciò?
The closest stations to Raciò are:
- Via Pizzi No.50 stop is 171 meters away, 3 min walk.
- Via Curzi intersection Via Moretti stop is 287 meters away, 4 min walk.
- San Benedetto Tronto - Station is 387 meters away, a 5 min walk.
- San Benedetto Del Tronto Train Station is 396 meters away, a 5 min walk.
Which bus lines stop near Raciò?
These bus lines stop near Raciò: 01EXTR, 1+6, 11.
Which train line stops near Raciò?
R (Civitanova Marche)
Whatās the nearest bus station to Raciò in San Benedetto Del Tronto?
The nearest bus station to Raciò in San Benedetto Del Tronto is Via Pizzi No.50. Itās a 3 min walk away.
What time is the first train to Raciò in San Benedetto Del Tronto?
The R is the first train that goes to Raciò in San Benedetto Del Tronto. It stops nearby at 6:44 AM.
What time is the last train to Raciò in San Benedetto Del Tronto?
The R is the last train that goes to Raciò in San Benedetto Del Tronto. It stops nearby at 9:53 PM.
What time is the first bus to Raciò in San Benedetto Del Tronto?
The MARTINSICURO - PORTO D'ASCOLI ROUNDABOUT - SAN BENEDETTO DEL TRONTO SEAFRONT - RAILWAY STATION - GROTTAMMARE SEAFRONT is the first bus that goes to Raciò in San Benedetto Del Tronto. It stops nearby at 3:04 AM.
What time is the last bus to Raciò in San Benedetto Del Tronto?
The MARTINSICURO - PORTO D'ASCOLI ROUNDABOUT - SAN BENEDETTO DEL TRONTO SEAFRONT - RAILWAY STATION - GROTTAMMARE SEAFRONT is the last bus that goes to Raciò in San Benedetto Del Tronto. It stops nearby at 3:15 AM.
See Raciò, San Benedetto Del Tronto, on the map
Public Transit to Raciò in San Benedetto Del Tronto
Wondering how to get to Raciò in San Benedetto Del Tronto? Moovit helps you find the best way to get to Raciò with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Raciò in real time.
Looking for the nearest stop or station to Raciò? Check out this list of stops closest to your destination: Via Pizzi No.50; Via Curzi intersection Via Moretti; San Benedetto Tronto - Station; San Benedetto Del Tronto Train Station.
Bus:Ā 01EXTR,Ā 1+6,Ā 11,Ā 4,Ā 5,Ā 8,Ā 3A,Ā TRANSFER,Ā A,Ā 2F,Ā B,Ā 13EXTR,Ā 14EXTR.Train:Ā R.
Want to see if thereās another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Raciò easily from the Moovit App or Website.
We make riding to Raciò easy, which is why over 1.7 billion users, including users in San Benedetto Del Tronto, trust Moovit as the best app for public transit. You donāt need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and train, costs and ride fares to Raciò, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Raciò Address: Montebello Street 68 in San Benedetto Del Tronto
- Windtre,
- AgorĆ 24 | Snack&Beverage Open 24h,
- Siciliano Jeans and Jackets,
- Loggi Shop,
- Primadonna Collection,
- Mini Elle,
- Antica Macelleria Felicioni,
- Totalerg,
- VR Cryo Criosauna, Physiotherapy and Sports Medicine Center,
- Flow Room&Breakfast,
- Gioielleria Malavolta,
- Dr. Maria Lucia Gaetani,
- Ripani Store,
- Leopardo Tailoring,
- Central Perk by Vittorio Poloni,
- Affittacamere Giglio Di Mare,
- Sartoria Bonjour Madame,
- Zappasodi Footwear,
- Hexafish - Urban Sea Trattoria,
- Mami Abbigliamento
Places Near Raciò (San Benedetto Del Tronto)
- I.N.R.C.A. Geriatric Hospital, Ancona,
- Ancona Hfb Eco, Osimo,
- Rossini Center (Iper Pesaro), Pesaro,
- Palazzo Di Vetro Polyclinic, Fano,
- Amazon Counter, Jesi,
- San Salvatore Hospital (Muraglia), Pesaro,
- Baraccola, Ancona,
- Oasi, Ascoli Piceno,
- Adriatic Heart, Civitanova Marche,
- Mazzoni Civil Hospital, Ascoli Piceno,
- Giometti Multiplex Ancona, Ancona,
- Vitrifrigo Arena, Pesaro,
- Podiatrist Fulgenzi Dr. Iacopo, Sassocorvaro,
- Senigallia Hospital, Senigallia,
- G. Salesi Hospital, Ancona,
- Villa Pini Care Home, Civitanova Marche,
- Conero Shopping Center, Ancona,
- Civitanova Marche Hospital, Civitanova Marche,
- Conero Stadium, Ancona,
- PalaPrometeo Estra Liano Rossini, Ancona