How to Get to Raciò Wine Bar in San Benedetto Del Tronto by Bus or Train?

Directions to Raciò Wine Bar (San Benedetto Del Tronto) with public transportation

The following transit lines have routes that pass near Raciò Wine Bar

  • BusBus:Ā 01EXTR,Ā 1+6,Ā 11EXTR,Ā 4,Ā 5.
  • TrainTrain:Ā R.

How to get to Raciò Wine Bar by bus?

Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.

How to get to Raciò Wine Bar by train?

Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.

Bus stops near Raciò Wine Bar in San Benedetto Del Tronto

  • U.Bassi Street - Gabrielli Warehouse, 1 min walk,
  • San Martino Street, 4 min walk,
  • San Benedetto Tronto - Nardone Square, 4 min walk,
  • Piazza Nardone, 4 min walk,
  • San Benedetto Del Tronto Train Station, 4 min walk,

Bus lines to Raciò Wine Bar in San Benedetto Del Tronto

  • 4, Railway Station - Town Hall - Viale dello Sport - Porto d'Ascoli - Val Tiberina - Portogrande,
  • 5, Porto d'Ascoli Railway Station - Viale dello Sport - Viale De Gasperi - Railway Station - Via Marsala - Via Tommaseo - Via D'Azeglio - Piazza San Filippo,
  • 1+6, Martinsicuro - Grottammare - Cupra Marittima,
  • 09EXTR, San Benedetto del Tronto - Acquaviva Picena - Offida,
  • 10EXTR, Carassai - Montefiore - Massignano - San Benedetto del Tronto,
  • 11EXTR, Montedinove - Cossignano - Ripatransone - Cuprense - Grottammare - San Benedetto del Tronto,
  • 12EXTR, Montedinove - Cossignano - Ripatransone - Grottammare - Valtesino - San Benedetto del Tronto,
  • 24EXTR, Monsampolo del Tronto - Monteprandone-San Benedetto del Tronto,
  • 36EXTR, Castignano - Grottammare - San Benedetto del Tronto,
  • A, Via Turati Conad,
  • 2F, Porto D'Ascoli Railway Station,
  • TRANSFER, Central Maxi Parking,
  • 8, Martinsicuro - Porto d'Ascoli - Train Station - SS16 - Grottammare Station - Upper Town - Cemetery - Swimming Pool - Grottammare Center - Train Station - Porto d'Ascoli - Martinsicuro,
  • 3A, Train Station - Cemetery - Acquaviva Industrial Zone - Via Sisto V - Hospital - Train Station,
  • 3B, Train Station - Cemetery - Hospital - Train Station,
  • 01EXTR, Ascoli Piceno - San Benedetto del Tronto - Civitanova Marche,
  • 14EXTR, Fermo - Ascoli Piceno,
  • B, Porto D'Ascoli Railway Station,
  • 13EXTR, High School Square,
  • 23EXTR, Rotella Centro,
Questions & Answers
  • What are the closest stations to Raciò Wine Bar?

    The closest stations to Raciò Wine Bar are:

    • U.Bassi Street - Gabrielli Warehouse stop is 36 meters away, 1 min walk.
    • San Martino Street stop is 264 meters away, 4 min walk.
    • San Benedetto Tronto - Nardone Square stop is 272 meters away, 4 min walk.
    • Piazza Nardone stop is 279 meters away, 4 min walk.
    • San Benedetto Del Tronto Train Station is 297 meters away, a 4 min walk.
  • Which bus lines stop near Raciò Wine Bar?

    These bus lines stop near Raciò Wine Bar: 01EXTR, 1+6, 11EXTR.

  • Which train line stops near Raciò Wine Bar?

    R (Pescara)

  • What’s the nearest bus station to Raciò Wine Bar in San Benedetto Del Tronto?

    The nearest bus station to Raciò Wine Bar in San Benedetto Del Tronto is U.Bassi Street - Gabrielli Warehouse. It’s a 1 min walk away.

  • What time is the first train to Raciò Wine Bar in San Benedetto Del Tronto?

    The R is the first train that goes to Raciò Wine Bar in San Benedetto Del Tronto. It stops nearby at 4:35 AM.

  • What time is the last train to Raciò Wine Bar in San Benedetto Del Tronto?

    The R is the last train that goes to Raciò Wine Bar in San Benedetto Del Tronto. It stops nearby at 11:00 PM.

  • What time is the first bus to Raciò Wine Bar in San Benedetto Del Tronto?

    The 1+6 is the first bus that goes to Raciò Wine Bar in San Benedetto Del Tronto. It stops nearby at 5:38 AM.

  • What time is the last bus to Raciò Wine Bar in San Benedetto Del Tronto?

    The 01EXTR is the last bus that goes to Raciò Wine Bar in San Benedetto Del Tronto. It stops nearby at 12:05 AM.

See Raciò Wine Bar, San Benedetto Del Tronto, on the map

Public Transit to Raciò Wine Bar in San Benedetto Del Tronto

Wondering how to get to Raciò Wine Bar in San Benedetto Del Tronto? Moovit helps you find the best way to get to Raciò Wine Bar with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Raciò Wine Bar in real time.

Looking for the nearest stop or station to Raciò Wine Bar? Check out this list of stops closest to your destination: U.Bassi Street - Gabrielli Warehouse; San Martino Street; San Benedetto Tronto - Nardone Square; Piazza Nardone; San Benedetto Del Tronto Train Station.

Bus:Ā 01EXTR,Ā 1+6,Ā 11EXTR,Ā 4,Ā 5,Ā 09EXTR,Ā 10EXTR,Ā A,Ā 2F,Ā TRANSFER,Ā 8,Ā 3A,Ā 3B,Ā 14EXTR,Ā B,Ā 13EXTR,Ā 23EXTR.Train:Ā R.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Raciò Wine Bar easily from the Moovit App or Website.

We make riding to Raciò Wine Bar easy, which is why over 1.7 billion users, including users in San Benedetto Del Tronto, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of bus and train, costs and ride fares to Raciò Wine Bar, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Raciò Wine Bar Address: Via Montebello, 68 63074 San Benedetto del Tronto in San Benedetto Del Tronto

Raciò Wine Bar, San Benedetto Del Tronto

Public transit lines with stations closest to Raciò Wine Bar in San Benedetto Del Tronto

Bus lines with stations closest to Raciò Wine Bar in San Benedetto Del Tronto