Directions to Raci Seeds (Parma) with public transportation
The following transit lines have routes that pass near Raci Seeds
Bus: 12, 21, 7, 2083, 2670.
How to get to Raci Seeds by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Raci Seeds in Parma
- Usberti Street Conad, 1 min walk,
- Martinella Industrial District, 3 min walk,
- Bandini Quarter Via Langhirano, 13 min walk,
- Mariano Str Argini, 39 min walk,
Bus lines to Raci Seeds in Parma
- 7, Railway Station,
- 21, Sorbolo Via Gruppini,
- 12, Eia,
- 2083, Panocchia Torrione Mill,
- 2670, Bus Station 1,
- 2700, Langhirano - Lesignano Bagni - Basilicanova - Parma,
- 2706, Traversetolo - Mamiano - Basilicanova - Parma,
What are the closest stations to Raci Seeds?
The closest stations to Raci Seeds are:
- Usberti Street Conad stop is 47 meters away, 1 min walk.
- Martinella Industrial District stop is 160 meters away, 3 min walk.
- Bandini Quarter Via Langhirano stop is 987 meters away, 13 min walk.
- Mariano Str Argini stop is 3015 meters away, 39 min walk.
Which bus lines stop near Raci Seeds?
These bus lines stop near Raci Seeds: 12, 21, 7.
What’s the nearest bus station to Raci Seeds in Parma?
The nearest bus station to Raci Seeds in Parma is Usberti Street Conad. It’s a 1 min walk away.
What time is the first bus to Raci Seeds in Parma?
The 7 is the first bus that goes to Raci Seeds in Parma. It stops nearby at 6:03 AM.
What time is the last bus to Raci Seeds in Parma?
The 7 is the last bus that goes to Raci Seeds in Parma. It stops nearby at 12:20 AM.
See Raci Seeds, Parma, on the map
Public Transit to Raci Seeds in Parma
Wondering how to get to Raci Seeds in Parma? Moovit helps you find the best way to get to Raci Seeds with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Raci Seeds in real time.
Looking for the nearest stop or station to Raci Seeds? Check out this list of stops closest to your destination: Usberti Street Conad; Martinella Industrial District; Bandini Quarter Via Langhirano; Mariano Str Argini.
Bus: 12, 21, 7, 2083, 2670, 2700, 2706.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Raci Seeds easily from the Moovit App or Website.
We make riding to Raci Seeds easy, which is why over 1.7 billion users, including users in Parma, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and train, costs and ride fares to Raci Seeds, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Raci Seeds Address: Strada Martinella, 21 43124 Parma street in Parma
- Etigraf,
- Bertacchini,
- Bertacchini Auto Repair,
- Bertacchini Multiband Auto Center,
- Vittorio Bertacchini,
- MENNEKES Digital Services GmbH,
- Abiesse,
- Marè,
- Sama Living,
- Errepi Constructions,
- Admiral Games,
- Giime,
- MG Gaming,
- The Box,
- Double Kick,
- AS Automations,
- Prometeo Engineering,
- Thermal Hydraulic Prevoli Andrea,
- Noise,
- Kla.Mar Speed by Greca Klodian
Places Near Raci Seeds (Parma)
- Bologna Hfb Eco, Unione Dei Comuni Valli Del Reno, Lavino E Samoggia,
- Indie Club, Cervia,
- Infermi Hospital, Rimini,
- Bologna Central Station, Bologna,
- Le Befane Shopping Center, Rimini,
- Meraville Shopping Center, Bologna,
- Le Befane Shopping Centre, Rimini,
- Shopville Gran Reno Shopping Center, Unione Dei Comuni Valli Del Reno, Lavino E Samoggia,
- Sant'Orsola Hospital, Bologna,
- Villa Laura Nursing Home, Bologna,
- Fidenza Village Outlet, Fidenza,
- Romeo Neri Stadium, Rimini,
- Sequoie Music Park, Bologna,
- Dall'Ara Stadium, Bologna,
- IKEA Shuttle, Bologna,
- Building L - New Outpatient Clinic Building - Lum, Bologna,
- Cocoricò, Riccione,
- Rimini Hfb Eco, Rimini,
- I Petali Shopping Center, Reggio Emilia,
- Building H - Ambulatory Pavilion, Bologna
How to get to popular places in Bologne with public transit
Get around Parma by public transit!
Traveling around Parma has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Parma.
When traveling to any destination around Parma use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Parma or how to pay for public transit in Parma? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Parma public transit lines? Moovit public transit app shows all public transit maps in Parma with all Bus, Train, Ferry, Cable Car and Funicular routes and stops on an interactive map.
Bologne has 5 transit type(s), including: Bus, Train, Ferry, Cable Car and Funicular, operated by several transit agencies, including Marconi Express, TPER Bologna, Autoguidovie, TPER Ferrara, Metropolitan Railway Service, SETA Modena, SETA Piacenza, SETA Reggio Emilia, TEP, Start Rimini, Start Ravenna, Start Forlì-Cesena, Trenitalia-TPER, Trenord and SACA Cooperative Society