Directions to Raci Travel (Geneve) with public transportation
The following transit lines have routes that pass near Raci Travel
Bus: 10, 12, 2, 1, EV1.
Train: IC21, IR15, IR75, EC, EXT.
Funicular:Â 2510.
Ferry: 3600, 3601, 3602, 3603, 3604.
How to get to Raci Travel by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
Train station near Raci Travel in Geneve
- Luzern, 1 min walk,
Bus stop near Raci Travel in Geneve
- Luzern, Bahnhof, 1 min walk,
Ferry station near Raci Travel in Geneve
- Luzern Bahnhofquai, 2 min walk,
Funicular station near Raci Travel in Geneve
- Luzern GĂ¼tsch (Talstation), 16 min walk,
Bus lines to Raci Travel in Geneve
- 1, Luzern, Maihof,
- EV1, Luzern, Bahnhof,
- N1, Ebikon, Bahnhof,
- 2, Luzern, Bahnhof,
- EV2, EmmenbrĂ¼cke, Bahnhof,
- N2, Emmen, Kasernenstrasse,
- EV3, Luzern, Bahnhof,
- N3, Luzern, Bahnhof,
- 4, Luzern, Bahnhof,
- N4, Luzern, Bahnhof,
- 5, Luzern, Pilatusplatz,
- N5, Luzern, Bahnhof,
- 6, Luzern, Bahnhof,
- N6, Luzern, Bahnhof,
- 7, Luzern, Unterlöchli,
- 8, Luzern, Hirtenhof,
- N9, Luzern, Bahnhof,
- 10, Kriens, Dattenberg,
- 11, Kriens, Dattenberg,
- 12, Luzern, Bahnhof,
What are the closest stations to Raci Travel?
The closest stations to Raci Travel are:
- Luzern is 28 meters away, 1 min walk.
- Luzern, Bahnhof is 67 meters away, 1 min walk.
- Luzern Bahnhofquai is 95 meters away, 2 min walk.
- Luzern GĂ¼tsch (Talstation) is 1164 meters away, 16 min walk.
Which bus lines stop near Raci Travel?
These bus lines stop near Raci Travel: 10, 12, 2.
Which train lines stop near Raci Travel?
These train lines stop near Raci Travel: IC21, IR15, IR75.
What’s the nearest train station to Raci Travel in Geneve?
The nearest train station to Raci Travel in Geneve is Luzern. It’s a 1 min walk away.
What’s the nearest bus station to Raci Travel in Geneve?
The nearest bus station to Raci Travel in Geneve is Luzern, Bahnhof. It’s a 1 min walk away.
What’s the nearest ferry station to Raci Travel in Geneve?
The nearest ferry station to Raci Travel in Geneve is Luzern Bahnhofquai. It’s a 2 min walk away.
What’s the nearest funicular station to Raci Travel in Geneve?
The nearest funicular station to Raci Travel in Geneve is Luzern GĂ¼tsch (Talstation). It’s a 16 min walk away.
What time is the first metro to Raci Travel in Geneve?
The LIX is the first metro that goes to Raci Travel in Geneve. It stops nearby at 6:06 AM.
What time is the last metro to Raci Travel in Geneve?
The LIX is the last metro that goes to Raci Travel in Geneve. It stops nearby at 10:55 PM.
What time is the first train to Raci Travel in Geneve?
The S1 is the first train that goes to Raci Travel in Geneve. It stops nearby at 4:21 AM.
What time is the last train to Raci Travel in Geneve?
The S1 is the last train that goes to Raci Travel in Geneve. It stops nearby at 1:37 AM.
What time is the first bus to Raci Travel in Geneve?
The 2 is the first bus that goes to Raci Travel in Geneve. It stops nearby at 4:36 AM.
What time is the last bus to Raci Travel in Geneve?
The EV1 is the last bus that goes to Raci Travel in Geneve. It stops nearby at 2:36 AM.
What time is the first ferry to Raci Travel in Geneve?
The 3600 is the first ferry that goes to Raci Travel in Geneve. It stops nearby at 6:20 AM.
What time is the last ferry to Raci Travel in Geneve?
The 3602 is the last ferry that goes to Raci Travel in Geneve. It stops nearby at 8:02 PM.
What time is the first funicular to Raci Travel in Geneve?
The 2510 is the first funicular that goes to Raci Travel in Geneve. It stops nearby at 4:30 AM.
What time is the last funicular to Raci Travel in Geneve?
The 2510 is the last funicular that goes to Raci Travel in Geneve. It stops nearby at 1:20 AM.
See Raci Travel, Geneve, on the map
Public Transit to Raci Travel in Geneve
Wondering how to get to Raci Travel in Geneve? Moovit helps you find the best way to get to Raci Travel with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Raci Travel in real time.
Looking for the nearest stop or station to Raci Travel? Check out this list of stops closest to your destination: Luzern; Luzern; Luzern Bahnhofquai; Luzern GĂ¼tsch (Talstation).
Bus: 10, 12, 2, 1, EV1, N1, EV2.Train: IC21, IR15, IR75, EC, EXT, EXT, EXT, IC.Funicular: 2510.Ferry: 3600, 3601, 3602, 3603, 3604.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Raci Travel easily from the Moovit App or Website.
We make riding to Raci Travel easy, which is why over 1.5 million users, including users in Geneve, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of train, bus and metro, costs and ride fares to Raci Travel, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Raci Travel Address: Hallwilerweg street in Geneve
- Princess,
- Sf Bau Furlenmeier,
- Agentur Fettes Haus Martin Koch,
- Trend Business,
- Casa Pilatus,
- Amo,
- Geir Tero Cafe,
- Dancework,
- Loringett Assists-Assist Services Special Individual Selection To Success,
- Raci Finanzen,
- Princesse Club,
- Megashop Luzern,
- Western Union,
- Teuscher Textilpflege,
- Tandoori Indian Take-Away Hallwilerweg,
- Patapata,
- Coiffeure Lounge,
- Kebabhouse,
- Avocado360,
- Schluckspecht
Places Near Raci Travel (Geneve)
- Balexert, Vernier,
- La Praille, Carouge (Ge),
- Centre de Loisir Vitam'parc,
- Rue de Lyon, Genève,
- Place Dorcière, Genève,
- IKEA, Vernier,
- Conforama, Meyrin,
- HUG - Hôpitaux Universitaires de Genève, Genève,
- Clinique Générale Beaulieu, Genève,
- Manor, Genève,
- Clinique La Lignière, Gland,
- HĂ´pital des Trois-ChĂªne, ThĂ´nex,
- Otto's,
- Stade de Genève, Carouge (Ge),
- Office Cantonal Des Véhicules, Carouge (Ge),
- IKEA Vernier, Vernier,
- Cimetière De St.-Georges, Genève,
- Gare de Genève Cornavin, Genève,
- Bois de la BĂ¢tie, Genève,
- Hôpital, Genève
How to get to popular places in Geneve with public transit
Get around Geneve by public transit!
Traveling around Geneve has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Geneve.
When traveling to any destination around Geneve use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Geneve or how to pay for public transit in Geneve? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Geneve public transit lines? Moovit public transit app shows all public transit maps in Geneve with all Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular routes and stops on an interactive map.
Geneve has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car and Funicular, operated by several transit agencies, including Schweizerische Bundesbahnen SBB, Nyon-St-Cergue-Morez, SociĂ©tĂ© Nationale des Chemins de fer Français, TPG, SBB Infrastruktur AG Bahnersatz, Transports Publics de l'agglomĂ©ration d'Annemasse, Bus Nyon-Prangins, Alpbus Fournier, CGN SA, Transports Publics NeuchĂ¢telois SA (tc), RĂ©seau de transports de l'AgglomĂ©ration de Thonon, PostAuto AG, Transports Publics de la RĂ©gion Nyonnaise, SMGN and Bus Buchserberg