Directions to Ruko Raci Pakal (Benowo) with public transportation
The following transit lines have routes that pass near Ruko Raci Pakal
Bus: BJ, I, R5, Z, RDK.
Train:Â A.
How to get to Ruko Raci Pakal by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Ruko Raci Pakal by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
Bus stops near Ruko Raci Pakal in Benowo
- Sumberejo A, 4 min walk,
- Singgapur A, 8 min walk,
- Sdn Benowo 1, 12 min walk,
- Terminal Benowo, 13 min walk,
Train station near Ruko Raci Pakal in Benowo
- Stasiun Benowo, 19 min walk,
Bus lines to Ruko Raci Pakal in Benowo
- R5, Terminal Benowo,
- RDK, Benowo,
- I, Kupang - Benowo,
- Z, Kalimas Barat - Benowo,
- BJ, Kalimas Barat,
- BP, Balongpanggang,
- Z1, Ujung Baru,
What are the closest stations to Ruko Raci Pakal?
The closest stations to Ruko Raci Pakal are:
- Sumberejo A stop is 310 meters away, 4 min walk.
- Singgapur A stop is 578 meters away, 8 min walk.
- Sdn Benowo 1 stop is 923 meters away, 12 min walk.
- Terminal Benowo is 1003 meters away, a 13 min walk.
- Stasiun Benowo station is 1440 meters away, 19 min walk.
Which bus lines stop near Ruko Raci Pakal?
These bus lines stop near Ruko Raci Pakal: BJ, I, R5, Z.
Which train line stops near Ruko Raci Pakal?
A (Bojonegoro)
What’s the nearest train station to Ruko Raci Pakal in Benowo?
The nearest train station to Ruko Raci Pakal in Benowo is Stasiun Benowo. It’s a 19 min walk away.
What’s the nearest bus station to Ruko Raci Pakal in Benowo?
The nearest bus station to Ruko Raci Pakal in Benowo is Sumberejo A. It’s a 4 min walk away.
What time is the first train to Ruko Raci Pakal in Benowo?
The A is the first train that goes to Ruko Raci Pakal in Benowo. It stops nearby at 3:13 AM.
What time is the last train to Ruko Raci Pakal in Benowo?
The A is the last train that goes to Ruko Raci Pakal in Benowo. It stops nearby at 5:20 PM.
What time is the first bus to Ruko Raci Pakal in Benowo?
The Z1 is the first bus that goes to Ruko Raci Pakal in Benowo. It stops nearby at 5:00 AM.
What time is the last bus to Ruko Raci Pakal in Benowo?
The Z1 is the last bus that goes to Ruko Raci Pakal in Benowo. It stops nearby at 10:28 PM.
See Ruko Raci Pakal, Benowo, on the map
Public Transit to Ruko Raci Pakal in Benowo
Wondering how to get to Ruko Raci Pakal in Benowo? Moovit helps you find the best way to get to Ruko Raci Pakal with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Ruko Raci Pakal in real time.
Looking for the nearest stop or station to Ruko Raci Pakal? Check out this list of stops closest to your destination: Sumberejo A; Singgapur A; Sdn Benowo 1; Terminal Benowo; Stasiun Benowo.
Bus: BJ, I, R5, Z, RDK, BP, Z1.Train: A.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Ruko Raci Pakal easily from the Moovit App or Website.
We make riding to Ruko Raci Pakal easy, which is why over 1.7 billion users, including users in Benowo, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and train, costs and ride fares to Ruko Raci Pakal, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Ruko Raci Pakal Address: Jalan Raya Pakal Surabaya 60196 in Benowo
- UD Jaya Rahmat,
- Jl. Stasiun Benowo,
- Tahu Campur Gado Gado,
- Yusuf Bakery,
- Alfamidi,
- Rumah Sakit Islam Darus Syifa Muslimat,
- Rumah Sakit Islam Darus Syifa',
- Iquteche Playground,
- Pon-Pes Darussholihin,
- GBT (Gelora Bung Tomo) Surabaya,
- Hutan Kota Pakal,
- Pt. Sinar Kayu Abadi 88,
- makam Pangeran Benowo,
- Jalan Benowo,
- TOKO JAMU RODIYAH,
- Toko Bangunan Sahabat Putra,
- Kelurahan Pakal Benowo,
- Warung Hmupid Rawon Balungan Benowo,
- Dwi Rimba Agung Pt,
- kolam renang hasil tirta
Places Near Ruko Raci Pakal (Benowo)
- BG Junction Mall, Bubutan,
- Grand City Mall, Surabaya, Gubeng,
- Halte Bis Royal Plaza, Wonokromo,
- Universitas Negeri Surabaya (UNESA), Lidah Wetan,
- RSAL dr. Ramelan Surabaya, Jagir,
- Bg Junction, Bubutan,
- Manukan, Surabaya,
- Pintu Keluar Terminal Bungurasih, Sidoarjo,
- Smoking Room Terminal Domestik Juanda International Airport, Sidoarjo,
- Sarangan, Magetan (Jawa Timur), Surabaya,
- ATM BCA Juanda Int'l Airport, Sidoarjo,
- Kantor Regional II BKN Surabaya, Sidoarjo,
- Pakuwon Mall, Lontar,
- Galaxy Mall Surabaya, Mulyorejo,
- Pakuwon City Mall, Keputih,
- Makam Sunan Ampel, Ampel,
- jatim expo surabaya, Ketintang,
- Masjid Al-Akbar, Surabaya,
- Taman Harmoni, Keputih,
- Stadion gelora bung tomo(surabaya,jawa timur), Surabaya