Ruta P. N°412 Y Curva S stop - Monday schedule
| Line | Direction | Time |
|---|---|---|
| 560 | Bella Vista - Iglesia - Las Flores - Rodeo - San José De Jáchal | 03:34 |
| 601 | Bella Vista - Iglesia - Las Flores - Rodeo | 08:11 |
| 601 | Bella Vista - Iglesia - Las Flores - Rodeo | 13:00 |
| 601 | Bella Vista - Iglesia - Las Flores - Rodeo | 18:46 |
Directions to Ruta P. N°412 Y Curva S stop (Iglesia) with public transit
The following transit lines have routes that pass near Ruta P. N°412 Y Curva S
Bus: 560, 601, 600.
How to get to Ruta P. N°412 Y Curva S stop by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
Bus stops near Ruta P. N°412 Y Curva S stop in Iglesia
- Ruta P. N°412 Y Curva N, 1 min walk,
- Mto. Al Gaucho Iglesiano - Bella Vista N, 12 min walk,
Bus lines to Ruta P. N°412 Y Curva S stop in Iglesia
- 560, Bella Vista - Iglesia - Las Flores - Rodeo - San José De Jáchal,
- 601, Bella Vista - Iglesia - Las Flores - Rodeo,
- 600, San Juan -Capital,
What are the closest stations to Ruta P. N°412 Y Curva S?
The closest stations to Ruta P. N°412 Y Curva S are:
- Ruta P. N°412 Y Curva N stop is 6 meters away, 1 min walk.
- Mto. Al Gaucho Iglesiano - Bella Vista N stop is 884 meters away, 12 min walk.
Which bus lines stop near Ruta P. N°412 Y Curva S?
These bus lines stop near Ruta P. N°412 Y Curva S: 560, 601.
What’s the nearest bus station to Ruta P. N°412 Y Curva S in Iglesia?
The nearest bus station to Ruta P. N°412 Y Curva S in Iglesia is Ruta P. N°412 Y Curva N. It’s a 1 min walk away.
What time is the first bus to Ruta P. N°412 Y Curva S in Iglesia?
The 560 is the first bus that goes to Ruta P. N°412 Y Curva S in Iglesia. It stops nearby at 3:32 AM.
What time is the last bus to Ruta P. N°412 Y Curva S in Iglesia?
The 560 is the last bus that goes to Ruta P. N°412 Y Curva S in Iglesia. It stops nearby at 6:55 PM.
See Ruta P. N°412 Y Curva S stop, Iglesia, on the map
Public transit to Ruta P. N°412 Y Curva S stop (ID: 19500344) in Iglesia
Looking for directions to Ruta P. N°412 Y Curva S in Iglesia, Argentina?
Download the Moovit App to find the current schedule and step-by-step directions for Bus routes that pass through Ruta P. N°412 Y Curva S.
Looking for the stops closest to Ruta P. N°412 Y Curva S? Check out this list of closest stops to your destination: Ruta P. N°412 Y Curva N; Mto. Al Gaucho Iglesiano - Bella Vista N.
Bus: 560, 601, 600.
We make riding on public transit to Ruta P. N°412 Y Curva S easy, which is why over 1.7 billion users, including users in Iglesia, trust Moovit as the best app for public transit.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Ruta P. N°412 Y Curva S stop’s code is 19500344
The first line to this stop is 560, at 03:34, and the last line is 601 at 18:46.
This stop serves Valle Del Sol and Vallecito’s lines
- Ruta P. N°412 Y Curva N,
- Mto. Al Gaucho Iglesiano - Bella Vista N
Bus stops near Ruta P. N°412 Y Curva S stop
- Cenobia Bustos Y Alvear,
- Catriel Y Andacollo O,
- Av. Córdoba Y Salta N,
- Proyectada Y Constitución,
- Libertad Y José Elasche N,
- Calle 10 - S -A,
- Terminal De Ómnibus De Caucete,
- Laprida Y Juan José Paso N,
- Juan José Bustos Y Cmte. Cabot,
- Maradona Y Formosa O,
- 25 De Mayo - Bº Las Calandrias,
- 9 De Julio Y Esteban Echeverría N,
- Luis Bustos Y Comodoro Rivadavia,
- Cic Dos Acequias O,
- H. Yrigoyen E,
- Urquiza Y Cmte. Cabot E,
- Escuela Pedro Echagüe,
- 9 De Julio Y Victoria N,
- Agustín Gómez Y Av. España,
- Punta Del Monte Y Calle 8