Directions to WBS Studio (Roma) with public transportation
The following transit lines have routes that pass near WBS Studio
Bus: 168, 226, 280, 69, 910.
Train:Â FL3.
Metro:Â A.
Light Rail:Â 2.
How to get to WBS Studio by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to WBS Studio by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to WBS Studio by metro?
Click on the metro route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near WBS Studio in Roma
- Flaminia/Calderini, 3 min walk,
- Mancini, 4 min walk,
- Mancini Square, 4 min walk,
Bus lines to WBS Studio in Roma
- 2BUS, Piazzale Flaminio (Metro),
- 53, Mancini,
- N201, Piazza Venezia,
- N200, Prima Porta Station,
- 201, Venezuela/India,
- C2, Termini (MA-MB-FS) - Cimitero Flaminio,
- C3, Tiburtina (MB-FS) - Flaminio Cemetery,
- 168, Tiburtina (Metro B-Railway) - Farnesina,
- 226, Grottarossa/Istituto Asisium,
- 911, Mancini,
- 910, Indipendenza,
- 446, Cornelia (MA),
- 200, Prima Porta Station,
- G05, Mancini,
- 280, Mancini,
What are the closest stations to WBS Studio?
The closest stations to WBS Studio are:
- Flaminia/Calderini stop is 191 meters away, 3 min walk.
- Mancini stop is 268 meters away, 4 min walk.
- Mancini Square stop is 293 meters away, 4 min walk.
Which bus lines stop near WBS Studio?
These bus lines stop near WBS Studio: 168, 226, 280, 69, 910.
Which train line stops near WBS Studio?
FL3 (Viterbo)
Which metro line stops near WBS Studio?
A (Battistini)
Which light rail line stops near WBS Studio?
2 (Mancini)
What’s the nearest bus station to WBS Studio in Roma?
The nearest bus station to WBS Studio in Roma is Flaminia/Calderini. It’s a 3 min walk away.
What time is the first light rail to WBS Studio in Roma?
The 2 is the first light rail that goes to WBS Studio in Roma. It stops nearby at 5:16 AM.
What time is the last light rail to WBS Studio in Roma?
The 2 is the last light rail that goes to WBS Studio in Roma. It stops nearby at 12:27 AM.
What time is the first bus to WBS Studio in Roma?
The N200 is the first bus that goes to WBS Studio in Roma. It stops nearby at 3:02 AM.
What time is the last bus to WBS Studio in Roma?
The N201 is the last bus that goes to WBS Studio in Roma. It stops nearby at 3:11 AM.
See WBS Studio, Roma, on the map
Public Transit to WBS Studio in Roma
Wondering how to get to WBS Studio in Roma? Moovit helps you find the best way to get to WBS Studio with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to WBS Studio in real time.
Looking for the nearest stop or station to WBS Studio? Check out this list of stops closest to your destination: Flaminia/Calderini; Mancini; Mancini Square.
Bus: 168, 226, 280, 69, 910, 2BUS, 53, N201, N200, 201, C2, C3, 911.Train: FL3.Metro: A.Light Rail: 2.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to WBS Studio easily from the Moovit App or Website.
We make riding to WBS Studio easy, which is why over 1.7 billion users, including users in Roma, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, metro, light rail and train, costs and ride fares to WBS Studio, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
WBS Studio Address: Via Giuseppe Sacconi, 8 00196 Roma street in Roma
- On Logopedics and Neurosciences,
- Baroque in Rome,
- Family Tomorrow Association,
- Millenium Audio Recording by F Ferri,
- Eisst Limited,
- Franceschi Giorgia,
- Magnolia Home Rome,
- Human Factor Editions,
- E.S.A. Construction,
- Roma Olympic,
- Sergio Mignogna,
- Tersilia Margottini,
- New Horizons Social Cooperative Society,
- Modern Times Editions,
- B&B da Ponticello,
- Marco Devruscian,
- Genesi,
- B&B dei Carracci,
- Al Maxxi Ex Ponte Milvio,
- From Ponticello
Places Near WBS Studio (Roma)
- Christmas World, Roma,
- L'idi, Roma,
- Tor Vergata, Roma,
- The Wow Side, Fiumicino,
- Gianicolo, Roma,
- Auditorium Music Park, Roma,
- Aurelia Hospital, Roma,
- Roma Est, Roma,
- Trevi Fountain, Roma,
- Sant'Eugenio Hospital, Roma,
- Scuderie Del Quirinale, Roma,
- Porta Hfb Eco, Roma,
- Casilino Polyclinic, Roma,
- San Carlo Hospital of Nancy, Roma,
- Cristo Re Hospital, Roma,
- Trastevere Quarter, Roma,
- Euroma2, Roma,
- Paths, Roma,
- Gemelli Polyclinic, Roma,
- Tiburtina Station, Roma
How to get to popular places in Rome and Lazio with public transit
Get around Roma by public transit!
Traveling around Roma has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Roma.
When traveling to any destination around Roma use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Roma or how to pay for public transit in Roma? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Roma public transit lines? Moovit public transit app shows all public transit maps in Roma with all Bus, Train, Metro, Light Rail, Ferry, Funicular and Gondola routes and stops on an interactive map.
Rome and Lazio has 7 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Funicular and Gondola, operated by several transit agencies, including ATAC, Cotral, Troiani Transportation Services, BIS, ATR Mobility, Tuscia, Trenitalia, ASTRAL, CSC Mobility, Troiani Bus Lines, Trotta Mobility Fiumicino, Schiaffini Travel, Seatour, Cialone S.p.A. and Ago Uno S.r.l.