Directions to Studyo Evm (Sincan) with public transportation
The following transit lines have routes that pass near Studyo Evm
Bus: 510, 510-1, 514-2, 529, 551.
Train: BAŞKENTRAY, B22.
Subway:Â M1-M2-M3.
How to get to Studyo Evm by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Studyo Evm by train?
Click on the train route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Studyo Evm by subway?
Click on the subway route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Studyo Evm in Sincan
- 50328 - Sincan Lale Meydanı, 2 min walk,
- 50335 - Sincan Tren İstasyonu, 4 min walk,
- 50334 - Ankara Caddesi, 5 min walk,
- 50330 - Sincan Lisesi, 7 min walk,
- 50332 - Sincan Lisesi, 7 min walk,
Train stations near Studyo Evm in Sincan
- Sazpınarı, 9 min walk,
- Sincan, 26 min walk,
Subway station near Studyo Evm in Sincan
- Fatih, 25 min walk,
Bus lines to Studyo Evm in Sincan
- 503, Yenikent - Çayırlar Bölgesi - Cumhuriyet Blv. - Sincan,
- 509, Sincan - Fatih (Törekent),
- 510, Sincan-Sıhhiye,
- 511, Sincan-Ümitköy Metro İstasyonu,
- 514, Çimşit - Sıhhiye,
- 516, Si̇ncan-Peçenek-Çi̇çektepe-Yapracık Toki̇ Konutları,
- 526, Temelli - Sincan (Temelliden),
- 529, Osmaniye - Sincan,
- 531, Eryaman - Fatih - Sincan - Elvankent - Etimesgut,
- 548, Sincan,
- 551, Sincan-Merkez-Eryaman 1-2 Metro,
- 577, Yenikent - Ortapınar - İlksan Toki Kont. - Sincan,
- 579, Sincan - Çokören - Ücret - Yenihisar,
- 611, Sincan Saraycık Toki - Ümitköy Metro İstasyonu - Eskişehir Yolu - 15 Temmuz Kızılay Milli İrade Meydanı,
- 616, Si̇ncan-Vatan Cd.-Peçenek-Çi̇çektepe-Yapracık Toki̇ Konutları,
- 503-1, Yenikent-Çayırlık Bölgesi-Cumhuriyet Blv-Törekent-Sincan,
- 510-1, Sincan-Sihhiye,
- 510-6, Sincan - Sıhhiye,
- 513-2, BeÅŸevler - Sincan,
- 514-2, Çimşit - Sıhhiye (Mezarlık),
What are the closest stations to Studyo Evm?
The closest stations to Studyo Evm are:
- 50328 - Sincan Lale Meydanı is 96 meters away, 2 min walk.
- 50335 - Sincan Tren İstasyonu is 265 meters away, 4 min walk.
- 50334 - Ankara Caddesi is 291 meters away, 5 min walk.
- 50330 - Sincan Lisesi is 448 meters away, 7 min walk.
- 50332 - Sincan Lisesi is 467 meters away, 7 min walk.
- Sazpınarı is 644 meters away, 9 min walk.
- Fatih is 1943 meters away, 25 min walk.
- Sincan is 2032 meters away, 26 min walk.
Which bus lines stop near Studyo Evm?
These bus lines stop near Studyo Evm: 510, 510-1, 514-2, 529, 551, 561, 577-1, 611.
Which train line stops near Studyo Evm?
BAÅžKENTRAY (Sincan)
Which subway line stops near Studyo Evm?
M1-M2-M3 (Çayyolu --> Sincan)
What’s the nearest subway station to Studyo Evm in Sincan?
The nearest subway station to Studyo Evm in Sincan is Fatih. It’s a 25 min walk away.
What’s the nearest train station to Studyo Evm in Sincan?
The nearest train station to Studyo Evm in Sincan is Sazpınarı. It’s a 9 min walk away.
What’s the nearest bus station to Studyo Evm in Sincan?
The nearest bus station to Studyo Evm in Sincan is 50328 - Sincan Lale Meydanı. It’s a 2 min walk away.
What time is the first subway to Studyo Evm in Sincan?
The M1-M2-M3 is the first subway that goes to Studyo Evm in Sincan. It stops nearby at 6:03 AM.
What time is the last subway to Studyo Evm in Sincan?
The M1-M2-M3 is the last subway that goes to Studyo Evm in Sincan. It stops nearby at 1:34 AM.
What time is the first train to Studyo Evm in Sincan?
The BAÅžKENTRAY is the first train that goes to Studyo Evm in Sincan. It stops nearby at 6:00 AM.
What time is the last train to Studyo Evm in Sincan?
The BAÅžKENTRAY is the last train that goes to Studyo Evm in Sincan. It stops nearby at 11:49 PM.
What time is the first bus to Studyo Evm in Sincan?
The 510-6 is the first bus that goes to Studyo Evm in Sincan. It stops nearby at 3:55 AM.
What time is the last bus to Studyo Evm in Sincan?
The 510-6 is the last bus that goes to Studyo Evm in Sincan. It stops nearby at 3:57 AM.
See Studyo Evm, Sincan, on the map
Public Transit to Studyo Evm in Sincan
Wondering how to get to Studyo Evm in Sincan? Moovit helps you find the best way to get to Studyo Evm with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Studyo Evm in real time.
Looking for the nearest stop or station to Studyo Evm? Check out this list of stops closest to your destination: 50328 - Sincan Lale Meydanı; 50335 - Sincan Tren İstasyonu; 50334 - Ankara Caddesi; 50330 - Sincan Lisesi; 50332 - Sincan Lisesi; Sazpınarı; Fatih; Sincan.
Bus: 510, 510-1, 514-2, 529, 551, 561, 577-1, 611, 503, 509, 511, 514, 549, 755, 758, 513-1.Train: BAŞKENTRAY, B22.Subway: M1-M2-M3.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Studyo Evm easily from the Moovit App or Website.
We make riding to Studyo Evm easy, which is why over 1.5 million users, including users in Sincan, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, subway and train, costs and ride fares to Studyo Evm, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Studyo Evm Address: Ankara Caddesi, 06930 Atatürk, Ankara street in Sincan
- Farmasi Sincan,
- Sincan Sesi Gazetesi,
- Ankara Metro,
- Diş Hekimi Anife Göktaş,
- Sinkent,
- Kamil Koç,
- Qnb FİNANSBANK,
- Mali Müşavir Lokman Yılmaz,
- Teknosa,
- Diş Hekimi Şerife Özkan,
- Karacan Hukuk Bürosu,
- Avukat İbrahim Emin Yazı,
- Papatyam,
- Avukat Süleyman Karacan,
- Avukat Emine TahiroÄŸlu Esen,
- Avukat Fatma Cüveyri Yazi,
- Aksel Yapı,
- Koçak İş Merkezi,
- Kokulu TaÅŸ,
- Atatürk Mahallesi
Places Near Studyo Evm (Sincan)
- Taurus Avm, Çankaya,
- Nata Vega Alışveriş Merkezi, Çankaya,
- Kentpark AVM, Yenimahalle,
- ANKAmall, Yenimahalle,
- Metromall AVM, Yenimahalle,
- İncek Dolmuş, Ankara,
- Ankara Gülhane Askeri Hastanesi (GATA), Yenimahalle,
- Atakule, Çankaya,
- Acity Outlet Avm, Yenimahalle,
- Cumhurbaşkanlığı Millet Kütüphanesi, Yenimahalle,
- Karşıyaka Mezarlığı, Ankara,
- Antares, Ankara,
- Anıtkabir, Çankaya,
- Dolmuş Durakları, Keçiören,
- Dolmuş Durakları, Çubuk,
- Panora Alışveriş Merkezi, Ankara,
- Ankara Yüksek Hızlı Tren Garı (YHT-Ankara Gari), Çankaya,
- kaveeeeee, Çankaya,
- Forum Ankara Outlet, Keçiören,
- Hamamönü, Ankara
How to get to popular places in Ankara with public transit
Get around Sincan by public transit!
Traveling around Sincan has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Sincan.
When traveling to any destination around Sincan use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Sincan or how to pay for public transit in Sincan? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Sincan public transit lines? Moovit public transit app shows all public transit maps in Sincan with all Bus, Train, Subway and Light Rail routes and stops on an interactive map.
Ankara has 4 transit type(s), including: Bus, Train, Subway and Light Rail, operated by several transit agencies, including Ankara Metrosu, TCDD, Ankaray, Nostaljik Tramvay, EGO, EGO ÖHO and EGO ÖTA