Directions to Wbs (Taranto) with public transportation
The following transit lines have routes that pass near Wbs
Bus: 21A, 27C, 29, 14A, 23.
How to get to Wbs by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Wbs in Taranto
- Vittorio Emanuele - 342, 3 min walk,
- Vittorio Emanuele - 271, 5 min walk,
- Cavalcanti Street, 7 min walk,
- Europa Avenue, 9 min walk,
Bus lines to Wbs in Taranto
- 14A, Commercial Port - Leporano - Saturo - Commercial Port,
- 21A, Commercial Port - Talsano - Lama - Battaglia - Lighthouse - Commercial Port,
- 23, Cimino - Sanarica - Cimino,
- 27, Porto Mercantile - Talsano,
- 27C, Commercial Port - Talsano - Lama - San Vito - Commercial Port,
- 29, Cimino - Talsano - Pezzavilla,
- 28C, West Complex SS.7 Appia,
- 16A, Leporano,
- 20, PM - Merchant Port Captain,
- 14, PM - Merchant Port Captain,
- 16, Saturo (Terminal),
What are the closest stations to Wbs?
The closest stations to Wbs are:
- Vittorio Emanuele - 342 stop is 221 meters away, 3 min walk.
- Vittorio Emanuele - 271 stop is 347 meters away, 5 min walk.
- Cavalcanti Street stop is 478 meters away, 7 min walk.
- Europa Avenue stop is 630 meters away, 9 min walk.
Which bus lines stop near Wbs?
These bus lines stop near Wbs: 21A, 27C, 29.
What’s the nearest bus station to Wbs in Taranto?
The nearest bus station to Wbs in Taranto is Vittorio Emanuele - 342. It’s a 3 min walk away.
What time is the first bus to Wbs in Taranto?
The 27C is the first bus that goes to Wbs in Taranto. It stops nearby at 5:30 AM.
What time is the last bus to Wbs in Taranto?
The 27 is the last bus that goes to Wbs in Taranto. It stops nearby at 12:26 AM.
See Wbs, Taranto, on the map
Public Transit to Wbs in Taranto
Wondering how to get to Wbs in Taranto? Moovit helps you find the best way to get to Wbs with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Wbs in real time.
Looking for the nearest stop or station to Wbs? Check out this list of stops closest to your destination: Vittorio Emanuele - 342; Vittorio Emanuele - 271; Cavalcanti Street; Europa Avenue.
Bus: 21A, 27C, 29, 14A, 23, 27, 28C, 16A, 20, 14, 16.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs easily from the Moovit App or Website.
We make riding to Wbs easy, which is why over 1.7 billion users, including users in Taranto, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, costs and ride fares to Wbs, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Address: Via della Cabina, 1 74122 Taranto street in Taranto
- Dog Grooming at Bau Island,
- S.I.F.I. Italian Industrial Ovens,
- Merlo Agency,
- Santa Rita,
- The Twin by Francesca Lategana,
- Fiorenzo Cazzato,
- Assoraider Taranto 2 Section,
- Safa by P. Arboritanza,
- Dragone Artisan Cheese Factory,
- Food Service,
- Equine Meat,
- Commerbit,
- Our Lady of Fatima Parish,
- Barok,
- Barock Bistro,
- Puglia and Basilicata Popular Bank - Branch 3,
- Queen by Tamburrino Angela,
- Casa Mania Wholesale and Retail Srl Simplified,
- CONAD,
- Gino's Pizzeria
Places Near Wbs (Taranto)
- Bariblu, Triggiano,
- Pane E Pomodoro, Bari,
- United Hospitals of Foggia, Foggia,
- Mongolfiera Shopping Center, Surbo,
- Bari Blu (Bariblu Shopping Center), Triggiano,
- Lecce Fairs, Lecce,
- IRCCS Saverio De Bellis, Castellana Grotte,
- Casamassima Commercial Park, Casamassima,
- Japigia Quarter, Bari,
- Team Theater Bari, Bari,
- Ice Rink, Bari,
- Barletta Hospital, Barletta,
- Ipercoop Santa Caterina, Bari,
- Ikea, Bari,
- Ipercoop, Molfetta,
- Primark Casamassima, Casamassima,
- City of Cinema, Foggia,
- Auchan Commercial Park, Casamassima,
- Civil Motorization - Bari, Modugno,
- Poggiofranco, Bari