Directions to Wbs (Centro) with public transportation
The following transit lines have routes that pass near Wbs
Bus: 206 BARREIRINHA / SÃO JOSÉ, 304 PINHAIS / CAMPO COMPRIDO, 505 BOQUEIRÃO / CENTRO CÍVICO, 507 SÍTIO CERCADO (HORÁRIO), J62 CAMPO LARGO / GUADALUPE.
How to get to Wbs by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Wbs in Centro
- R. Conselheiro Laurindo, 341, 2 min walk,
- R. José Loureiro, 720, 2 min walk,
- R. Tibagi, 386 - Associação Metrocard, 3 min walk,
- Guadalupe (702 / X36), 3 min walk,
- Guadalupe (206 / 505), 3 min walk,
- R. João Negrão, 520, 4 min walk,
- Terminal Guadalupe (Y99) - R. Pedro Ivo, 971, 4 min walk,
- Guadalupe (700 / 702), 5 min walk,
- R. André de Barros, 929, 5 min walk,
- Terminal Metropolitano Guadalupe, 6 min walk,
Bus lines to Wbs in Centro
- K01 ITAPERUÇU / GUADALUPE (TAMANDARÉ / MINÉRIOS), ITAPERUÇU / GUADALUPE (TAMANDARÉ / MINÉRIOS),
- A06 TAMANDARÉ / GUADALUPE (MINÉRIOS), TAMANDARÉ / GUADALUPE (MINÉRIOS),
- J62 CAMPO LARGO / GUADALUPE, CAMPO LARGO / GUADALUPE,
- A77 TANGUÁ / GUADALUPE, TANGUÁ / GUADALUPE,
- A80 TANGUÁ (VILA MARTA) / GUADALUPE, TANGUÁ (VILA MARTA) / GUADALUPE,
- 385 CRISTO REI, CRISTO REI,
- 386 CAJURU, CAJURU,
- 464 ALCIDES MUNHOZ / JARDIM BOTÂNICO, ALCIDES MUNHOZ / JARDIM BOTÂNICO,
- 365 JARDIM SOCIAL / BATEL, JARDIM SOCIAL / BATEL,
- 372 TARUMÃ, TARUMÃ,
- 373 ALTO TARUMÃ, ALTO TARUMÃ,
- 389 MAD. TARUMÃ / AUGUSTA, MAD. TARUMÃ / AUGUSTA,
- C03 PINHAIS / GUADALUPE, Terminal Pinhais → Terminal Guadalupe,
- N61 CAMPINA GRANDE DO SUL / GUADALUPE, Terminal Guadalupe → Terminal Campina Grande do Sul (Eugênia Maria),
- N62 JARDIM PAULISTA / GUADALUPE, Terminal Guadalupe → Terminal Jardim Paulista,
- O62 QUATRO BARRAS / GUADALUPE (VIA ESTAÇÃO ATUBA), Terminal Guadalupe → Terminal Quatro Barras,
- B72 COLOMBO / GUADALUPE (VIA T. ROÇA GRANDE), Terminal Sede Colombo → Terminal Guadalupe,
- C72 VILA PALMITAL / GUADALUPE (VIA ESTAÇÃO ATUBA), Vila Palmital (31 de Março) → Terminal Guadalupe,
- N72 EUGÊNIA MARIA / GUADALUPE, Eugênia Maria → Terminal Guadalupe,
- O74 QUATRO BARRAS / GUADALUPE, Terminal Quatro Barras → Terminal Guadalupe,
What are the closest stations to Wbs?
The closest stations to Wbs are:
- R. Conselheiro Laurindo, 341 stop is 85 meters away, 2 min walk.
- R. José Loureiro, 720 stop is 137 meters away, 2 min walk.
- R. Tibagi, 386 - Associação Metrocard stop is 140 meters away, 3 min walk.
- Guadalupe (702 / X36) stop is 195 meters away, 3 min walk.
- Guadalupe (206 / 505) stop is 207 meters away, 3 min walk.
- R. João Negrão, 520 stop is 219 meters away, 4 min walk.
- Terminal Guadalupe (Y99) - R. Pedro Ivo, 971 is 264 meters away, 4 min walk.
- Guadalupe (700 / 702) stop is 301 meters away, 5 min walk.
- R. André de Barros, 929 stop is 344 meters away, 5 min walk.
- Terminal Metropolitano Guadalupe is 402 meters away, 6 min walk.
Which bus lines stop near Wbs?
These bus lines stop near Wbs: 206 BARREIRINHA / SÃO JOSÉ, 304 PINHAIS / CAMPO COMPRIDO, 505 BOQUEIRÃO / CENTRO CÍVICO, 507 SÍTIO CERCADO (HORÁRIO), J62 CAMPO LARGO / GUADALUPE.
What’s the nearest bus station to Wbs in Centro?
The nearest bus stations to Wbs in Centro are R. Conselheiro Laurindo, 341 and R. José Loureiro, 720. The closest one is a 2 min walk away.
What time is the first bus to Wbs in Centro?
The 389 MAD. TARUMÃ / AUGUSTA is the first bus that goes to Wbs in Centro. It stops nearby at 3:00 AM.
What time is the last bus to Wbs in Centro?
The 489 MAD. PETRÓPOLIS / SOLITUDE is the last bus that goes to Wbs in Centro. It stops nearby at 2:01 AM.
See Wbs, Centro, on the map
Public Transit to Wbs in Centro
Wondering how to get to Wbs in Centro? Moovit helps you find the best way to get to Wbs with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Wbs in real time.
Looking for the nearest stop or station to Wbs? Check out this list of stops closest to your destination: R. Conselheiro Laurindo; R. José Loureiro; R. Tibagi; Guadalupe (702 / X36); Guadalupe (206 / 505); R. João Negrão; Terminal Guadalupe (Y99) - R. Pedro Ivo; Guadalupe (700 / 702); R. André de Barros; Terminal Metropolitano Guadalupe.
Bus: 206 BARREIRINHA / SÃO JOSÉ, 304 PINHAIS / CAMPO COMPRIDO, 505 BOQUEIRÃO / CENTRO CÍVICO, 507 SÍTIO CERCADO (HORÁRIO), J62 CAMPO LARGO / GUADALUPE, K01 ITAPERUÇU / GUADALUPE (TAMANDARÉ / MINÉRIOS), A06 TAMANDARÉ / GUADALUPE (MINÉRIOS), A77 TANGUÁ / GUADALUPE, A80 TANGUÁ (VILA MARTA) / GUADALUPE, 365 JARDIM SOCIAL / BATEL, 372 TARUMÃ, 373 ALTO TARUMÃ, 389 MAD. TARUMÃ / AUGUSTA, C03 PINHAIS / GUADALUPE, N61 CAMPINA GRANDE DO SUL / GUADALUPE, N62 JARDIM PAULISTA / GUADALUPE, O62 QUATRO BARRAS / GUADALUPE (VIA ESTAÇÃO ATUBA), B72 COLOMBO / GUADALUPE (VIA T. ROÇA GRANDE), X36 REFORÇO GUADALUPE / FAZENDINHA, 702 CAIUÁ / CACHOEIRA, 508 SÍTIO CERCADO (ANTI-HORÁRIO), 461 SANTA BÁRBARA, 462 PETRÓPOLIS, 463 SOLITUDE / PLANTA EVARISTO, 489 MAD. PETRÓPOLIS / SOLITUDE.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs easily from the Moovit App or Website.
We make riding to Wbs easy, which is why over 1.7 billion users, including users in Centro, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, costs and ride fares to Wbs, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Address: Rua Conselheiro Laurindo, 600 street in Centro
- Re Oliveira,
- Walter Pinotti - Advogado,
- Serenità Estúdio,
- Aparelho Auditivo Curitiba,
- Jacob & Holz Advogados Associados,
- Sirbatattoo,
- Inova Brindes,
- Dhb Laboratório De Ortodontia,
- Contract Experts,
- Partiu Brasil Viagens,
- Pedro Júnior, Coelho E Tonello,
- Jefferson Nascimento Da Silva,
- Medi Class,
- Höschele & Silva Advogados,
- Nowacon Projetos E Construções,
- Only Apple Cwb,
- Salão Eliz,
- Marcelo Santolin Advogado,
- Advocacia Mauro C. Ferreira,
- Gustavo Henrique Rezende
Places Near Wbs (Centro)
- Hospital Madalena Sofia, Bairro Alto,
- Arena Da Baixada - Curitiba,
- Pontifícia Universidade Católica do Paraná (PUCPR), Prado Velho,
- Hospital de Clínicas (HC - UFPR), Centro,
- Curitiba, Centro,
- Rua marechal floriano Peixoto, Centro,
- Terminal Boqueirão, Boqueirão,
- São José Dos Pinhais, São José Dos Pinhais,
- Universidade Tuiuti do Paraná (UTP), Santo Inácio,
- Shopping Estação, Rebouças,
- Campo Largo, Campo,
- Hospital Erasto Gaertner, Jardim Das Américas,
- Av Vicente Machado, Centro,
- Hospital Nossa Senhora Das Graças, Mercês,
- Hospital Universitário Evangélico Mackenzie, Bigorrilho,
- Hospital Da Cruz Vermelha, Batel,
- Rua Itupava, Centro,
- Rua General Mário Tourinho, Campina Do Siqueira,
- Passeio Público, Centro,
- Terminal Fazendinha, Fazendinha
How to get to popular places in Curitiba Region with public transit
Get around Centro by public transit!
Traveling around Centro has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Centro.
When traveling to any destination around Centro use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Centro or how to pay for public transit in Centro? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Centro public transit lines? Moovit public transit app shows all public transit maps in Centro with all Bus and Cable Car routes and stops on an interactive map.
Curitiba Region has 2 transit type(s), including: Bus and Cable Car, operated by several transit agencies, including Sistema Integrado de Mobilidade (URBS), Sistema Integrado de Mobilidade (AMEP), URBS (Cartões bancários e Dinheiro), URBS (Cartões bancários / Cartão URBS), AMEP (Cartões bancários / Cartão MetroCard), AMEP (Cartões bancários / Cartão MetroCard / Dinheiro), Viação Colombo (Dinheiro), TRIAR (Cartão TRIAR / Dinheiro), Empresa Curitiba Cerro Azul (Dinheiro), Expresso Penha (Dinheiro), Empresa Campo Alto Tijucas (Dinheiro), Auto Viação São José (Cartão VEM / Dinheiro), BRT S/A (Cartão VEM / Dinheiro), TransPiedade (Cartão Cidadão / Dinheiro) and Oceânica Sul (Cartão Transporte / Dinheiro)