How to Get to Wbs Construtora in Sorocaba by Bus?

Directions to Wbs Construtora (Sorocaba) with public transportation

The following transit lines have routes that pass near Wbs Construtora

  • BusBus: 28 MINEIRÃOA110 VITÓRIA RÉGIA II E III20 CAROL50 HUNGARES24 GUADALUPE.

How to get to Wbs Construtora by bus?

Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.

Bus stops near Wbs Construtora in Sorocaba

  • Rua Major Arthur Cunha Soares, 313, 4 min walk,
  • Rua José Pisteli 183, 5 min walk,
  • Rua Pedro Pegoretti 642, 5 min walk,

Bus lines to Wbs Construtora in Sorocaba

  • 28 MINEIRÃO, Mineirão,
  • 20 CAROL, Jardim Guíba,
  • 50 HUNGARES, Terminal Santo Antônio,
  • 24 GUADALUPE, Guadalupe,
Questions & Answers
  • What are the closest stations to Wbs Construtora?

    The closest stations to Wbs Construtora are:

    • Rua Major Arthur Cunha Soares, 313 stop is 243 meters away, 4 min walk.
    • Rua José Pisteli 183 stop is 309 meters away, 5 min walk.
    • Rua Pedro Pegoretti 642 stop is 332 meters away, 5 min walk.
  • Which bus lines stop near Wbs Construtora?

    These bus lines stop near Wbs Construtora: 28 MINEIRÃO, A110 VITÓRIA RÉGIA II E III.

  • What’s the nearest bus station to Wbs Construtora in Sorocaba?

    The nearest bus station to Wbs Construtora in Sorocaba is Rua Major Arthur Cunha Soares, 313. It’s a 4 min walk away.

  • What time is the first bus to Wbs Construtora in Sorocaba?

    The 28 MINEIRÃO is the first bus that goes to Wbs Construtora in Sorocaba. It stops nearby at 4:14 AM.

  • What time is the last bus to Wbs Construtora in Sorocaba?

    The 28 MINEIRÃO is the last bus that goes to Wbs Construtora in Sorocaba. It stops nearby at 12:22 AM.

See Wbs Construtora, Sorocaba, on the map

Public Transit to Wbs Construtora in Sorocaba

Wondering how to get to Wbs Construtora in Sorocaba? Moovit helps you find the best way to get to Wbs Construtora with step-by-step directions from the nearest public transit station.

Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Wbs Construtora in real time.

Looking for the nearest stop or station to Wbs Construtora? Check out this list of stops closest to your destination: Rua Major Arthur Cunha Soares; Rua José Pisteli 183; Rua Pedro Pegoretti 642.

Bus: 28 MINEIRÃOA110 VITÓRIA RÉGIA II E III20 CAROL50 HUNGARES24 GUADALUPE.

Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Construtora easily from the Moovit App or Website.

We make riding to Wbs Construtora easy, which is why over 1.7 billion users, including users in Sorocaba, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

For information on prices of bus, costs and ride fares to Wbs Construtora, please check the Moovit app.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

Wbs Construtora Address: Rua Humberto del Cistia, 165 Vila Fiori Sorocaba-SP 18076-560 street in Sorocaba

Wbs Construtora, Sorocaba

Get around Sorocaba by public transit!

Traveling around Sorocaba has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Sorocaba.

When traveling to any destination around Sorocaba use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

Wondering how to use public transit in Sorocaba or how to pay for public transit in Sorocaba? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Sorocaba public transit lines? Moovit public transit app shows all public transit maps in Sorocaba with all bus routes and stops on an interactive map.

Sorocaba Region has 1 transit type(s), including: bus, operated by several transit agencies, including BRT Sorocaba, Viação Cometa, Rápido Luxo Campinas, VB Transportes, City+ Sorocaba, CONSOR - Consórcio Sorocaba, Piracema, MOV ITU - URBANO, Mov Boituva, City+ Votorantim, Viação Tieteense, Expresso Porto Feliz, SOU Salto, Prefeitura de Tatuí and EMTU

Public transit lines with stations closest to Wbs Construtora in Sorocaba

Bus lines with stations closest to Wbs Construtora in Sorocaba