Wbs Embalagens stop

Plan a trip by bus and view updated schedules

Wbs Embalagens stop - Saturday schedule

LineDirectionTime
020 COOPAVELTerminal Leste (Trevo São João/Citvel/Penitenciária)06:49
020 COOPAVELTerminal Leste (Citvel/Penitenciária)17:10

Directions to Wbs Embalagens stop (São João D'Oeste) with public transit

The following transit lines have routes that pass near Wbs Embalagens

  • BusBus: 020 COOPAVEL, 030 SÃO JOÃO, 345 VILA CAJATI.

How to get to Wbs Embalagens stop by bus?

Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.

Bus stops near Wbs Embalagens stop in São João D'Oeste

  • Ponto Final Citvel, 4 min walk,
  • Sau 4, 18 min walk,

Bus lines to Wbs Embalagens stop in São João D'Oeste

  • 020 COOPAVEL, Coopavel (Ferropar Portão 2),
  • 030 SÃO JOÃO, São João,
  • 345 VILA CAJATI, Terminal Sul,
Questions & Answers
  • What are the closest stations to Wbs Embalagens?

    The closest stations to Wbs Embalagens are:

    • Ponto Final Citvel stop is 300 meters away, 4 min walk.
    • Sau 4 stop is 1392 meters away, 18 min walk.
  • Which bus lines stop near Wbs Embalagens?

    These bus lines stop near Wbs Embalagens: 020 COOPAVEL, 030 SÃO JOÃO.

  • What’s the nearest bus station to Wbs Embalagens in São João D'Oeste?

    The nearest bus station to Wbs Embalagens in São João D'Oeste is Ponto Final Citvel. It’s a 4 min walk away.

  • What time is the first bus to Wbs Embalagens in São João D'Oeste?

    The 030 SÃO JOÃO is the first bus that goes to Wbs Embalagens in São João D'Oeste. It stops nearby at 6:13 AM.

  • What time is the last bus to Wbs Embalagens in São João D'Oeste?

    The 030 SÃO JOÃO is the last bus that goes to Wbs Embalagens in São João D'Oeste. It stops nearby at 7:49 PM.

See Wbs Embalagens stop, São João D'Oeste, on the map

Public transit to Wbs Embalagens stop in São João D'Oeste

Looking for directions to Wbs Embalagens in São João D'Oeste, Brazil?

Download the Moovit App to find the current schedule and step-by-step directions for Bus routes that pass through Wbs Embalagens.

Looking for the stops closest to Wbs Embalagens? Check out this list of closest stops to your destination: Ponto Final Citvel; Sau 4.

Bus: 020 COOPAVEL, 030 SÃO JOÃO, 345 VILA CAJATI.

We make riding on public transit to Wbs Embalagens easy, which is why over 1.7 billion users, including users in São João D'Oeste, trust Moovit as the best app for public transit.

Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

The first line to this stop is 020 COOPAVEL, at 06:49, and the last line is 020 COOPAVEL at 17:10.

This stop serves Empresa Pioneira de Transportes Ltda’s lines

Wbs Embalagens, São João D'Oeste

Public transit lines with stations closest to Wbs Embalagens in São João D'Oeste

Bus lines with stations closest to Wbs Embalagens in São João D'Oeste