Directions to Wbs Grundbesitz (Köln) with public transportation
The following transit lines have routes that pass near Wbs Grundbesitz
Train: S11, S6, S6.
Bus: 127, 121, 125, 139, S11.
How to get to Wbs Grundbesitz by bus?
Click on the bus route to see step-by-step directions with maps, line arrival times and updated time schedules.
How to get to Wbs Grundbesitz by train?
Click on the train route to see step-by-step directions with maps, line arrival times and updated time schedules.
Train stations near Wbs Grundbesitz in Köln
- Longerich - Köln, 1 min walk,
- Köln Longerich S-Bahn, 1 min walk,
Bus stop near Wbs Grundbesitz in Köln
- Köln Longerich S-Bahn, 2 min walk,
Light Rail stations near Wbs Grundbesitz in Köln
- Köln Longericher Str., 15 min walk,
Bus lines to Wbs Grundbesitz in Köln
- 121, Köln Marconistr.,
- 125, Köln Weiler,
- 127, Köln Longericher Str.,
- 139, Köln Longericher Str.,
- S11, Longerich S-Bahn,
What are the closest stations to Wbs Grundbesitz?
The closest stations to Wbs Grundbesitz are:
- Longerich - Köln station is 22 meters away, 1 min walk.
- Köln Longerich S-Bahn stop is 52 meters away, 2 min walk.
- Köln Longericher Str. station is 1152 meters away, 15 min walk.
Which train line stops near Wbs Grundbesitz?
S11 (Düsseldorf Flughafen Terminal (S))
Which bus line stops near Wbs Grundbesitz?
127 (Köln Ebertplatz→Köln Longericher Str.)
What’s the nearest light rail station to Wbs Grundbesitz in Köln?
The nearest light rail station to Wbs Grundbesitz in Köln is Köln Longericher Str.. It’s a 15 min walk away.
What’s the nearest train station to Wbs Grundbesitz in Köln?
The nearest train stations to Wbs Grundbesitz in Köln are Longerich - Köln and Köln Longerich S-Bahn. The closest one is a 1 min walk away.
What’s the nearest bus station to Wbs Grundbesitz in Köln?
The nearest bus station to Wbs Grundbesitz in Köln is Köln Longerich S-Bahn. It’s a 2 min walk away.
What time is the first light rail to Wbs Grundbesitz in Köln?
The 15 is the first light rail that goes to Wbs Grundbesitz in Köln. It stops nearby at 3:08 AM.
What time is the last light rail to Wbs Grundbesitz in Köln?
The 15 is the last light rail that goes to Wbs Grundbesitz in Köln. It stops nearby at 1:38 AM.
What time is the first train to Wbs Grundbesitz in Köln?
The S11 is the first train that goes to Wbs Grundbesitz in Köln. It stops nearby at 3:34 AM.
What time is the last train to Wbs Grundbesitz in Köln?
The S11 is the last train that goes to Wbs Grundbesitz in Köln. It stops nearby at 2:04 AM.
What time is the first bus to Wbs Grundbesitz in Köln?
The 121 is the first bus that goes to Wbs Grundbesitz in Köln. It stops nearby at 5:39 AM.
What time is the last bus to Wbs Grundbesitz in Köln?
The 127 is the last bus that goes to Wbs Grundbesitz in Köln. It stops nearby at 1:33 AM.
See Wbs Grundbesitz, Köln, on the map
Public Transit to Wbs Grundbesitz in Köln
Wondering how to get to Wbs Grundbesitz in Köln? Moovit helps you find the best way to get to Wbs Grundbesitz with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Wbs Grundbesitz in real time.
Looking for the nearest stop or station to Wbs Grundbesitz? Check out this list of stops closest to your destination: Longerich - Köln; Köln Longerich S-Bahn; Köln Longericher Str..
Train: S11, S6, S6.Bus: 127, 121, 125, 139, S11.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Grundbesitz easily from the Moovit App or Website.
We make riding to Wbs Grundbesitz easy, which is why over 1.7 billion users, including users in Köln, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, train, light rail and subway, costs and ride fares to Wbs Grundbesitz, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Grundbesitz Address: Grethenstraße 66 Longerich, 50739 Köln in Köln
- Hds,
- Sion Kolsch International Küche,
- Restaurant Jägerhof,
- Bahnhof Köln-Longerich (Longerich S-Bahn),
- Easy-Vita,
- S-Bahn Köln-Longerich,
- Breuer's Bikebahnhof,
- Ralf Breuer Fahrrad Motorradhandel,
- Wed2b,
- Longerich S-Bahn,
- Dmanera,
- Sh Shah Management,
- Marisales,
- Lebensglut,
- Kiosk & Lottolädchen,
- Schattenmagie Tattoostudio,
- Wilfried und Christa Görgens,
- Elektro Schüchter,
- Änderungsatelier Damen & Herren,
- Susskind & Ber
Places Near Wbs Grundbesitz (Köln)
- Fühlinger See, Köln,
- E-Werk, Köln,
- Messe Düsseldorf, Düsseldorf,
- IKEA, Kaarst,
- Unterbacher See, Düsseldorf,
- Kemnader See, Bochum,
- Aqualand, Köln,
- Ruhrpark, Bochum,
- Silbersee II, Haltern Am See,
- Palladium, Köln,
- Kaiserswerther Straße 89, Düsseldorf,
- CentrO, Oberhausen,
- Kristallsaal der Koelnmesse, Köln,
- Steeler Weihnachtsmarkt, Essen,
- Altstadt, Düsseldorf,
- Mitsubishi Electric Halle, Düsseldorf,
- Kölner Zoo, Köln,
- Universitätsklinikum Essen, Essen,
- Sankt-Josefs-Hospital Hagen, Hagen,
- Trödelmarkt Messeparkplatz P1, Düsseldorf