Directions to Wbs Matratzen (Bavaria) with public transportation
The following transit lines have routes that pass near Wbs Matratzen
Bus: 1990, 1961, 1962, 1963.
Bus stops near Wbs Matratzen in Bavaria
- Meerbodenreuth, 2 min walk,
Bus lines to Wbs Matratzen in Bavaria
- 1961, Neustadt, Schulzentrum - Schwand b. Parkstein, Sportplatz,
- 1962, Weiden ZOB - Schwand b. Parkstein, Sportplatz,
- 1963, Weiden (Oberpf) - Schwand b. Parkstein,
- 1990, Bedarfsverkehr,
- Parkstein,
- Witron,
- Josef Hauer,
- Parkstein,
- Sagen Aus Der Mooslohe,
- Haidmühle,
- Schätzlerbad,
- Bauhof Altenstadt A D Waldnaab,
- Schustermooslohe,
- Platz 1 Sv Altenstadt Tennis,
- Fahrrad Fritsch,
- Oed,
- Sv Altenstadt B-Platz,
- Kz-Gedenkstätte Flossenbürg - Nächste Ausfahrt,
- Hammerles,
- Hammerles,
- Jet,
- Altenstadt A.D.Waldnaab,
- Heimatverein Altenstadt,
- Markgraf
Places Near Wbs Matratzen (Bavaria)
- Zenith - Die Kulturhalle, Freimann,
- Landsberger Straße, Laim,
- Riem Arcaden, Messestadt Riem,
- Schloss Kaltenberg,
- Therme Erding, Erding,
- Gartencenter Seebauer, Ramersdorf,
- Schön Klinik München Harlaching, Giesing,
- Segmüller, Parsdorf,
- Paulaner am Nockherberg, Haidhausen,
- Primark München, Neuperlach,
- Allianz Arena, Munchen, München - Innenstadt,
- Heßstraße, Maxvorstadt,
- Hafen Passau-Racklau,
- Prinzregententheater, Bogenhausen,
- Circus Krone, Marsfeld,
- Utopia, Schwabing West,
- Klinikum Bogenhausen, Bogenhausen,
- MTU Aero Engines AG, Karlsfeld,
- Isarphilharmonie, Thalkirchen,
- GOP Varieté-Theater, München - Innenstadt
How to get to popular places in Bavaria with public transit
What are the closest stations to Wbs Matratzen?
The closest stations to Wbs Matratzen are:
- Meerbodenreuth stop is 99 meters away, 2 min walk.
Which bus line stops near Wbs Matratzen?
1990 (Bedarfsverkehr)
What’s the nearest bus station to Wbs Matratzen in Bavaria?
The nearest bus station to Wbs Matratzen in Bavaria is Meerbodenreuth. It’s a 2 min walk away.
What time is the first bus to Wbs Matratzen in Bavaria?
The 1990 is the first bus that goes to Wbs Matratzen in Bavaria. It stops nearby at 9:22 AM.
What time is the last bus to Wbs Matratzen in Bavaria?
The 1990 is the last bus that goes to Wbs Matratzen in Bavaria. It stops nearby at 12:32 AM.
See Wbs Matratzen, Bavaria, on the map
Public Transit to Wbs Matratzen in Bavaria
Wondering how to get to Wbs Matratzen in Bavaria? Moovit helps you find the best way to get to Wbs Matratzen with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long it takes to get to Wbs Matratzen in real time.
Looking for the nearest stop or station to Wbs Matratzen? Check out this list of stops closest to your destination: Meerbodenreuth.
Bus: 1990, 1961, 1962, 1963.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Matratzen easily from the Moovit App or Website.
We make riding to Wbs Matratzen easy, which is why over 1.7 billion users, including users in Bavaria, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app; Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus, train and subway, costs and ride fares to Wbs Matratzen, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Matratzen Address: Meerbodenreuth 33D Meerbodenreuth, 92665 Altenstadt an der Waldnaab in Bavaria