How to Get to Wbs Matratzen in Bavaria by Bus?

Directions to Wbs Matratzen (Bavaria) with public transportation

The following transit lines have routes that pass near Wbs Matratzen

  • TrainTrain: RE2, RB23, RE23, RE41, RE2.
  • BusBus: 1962, 1990, 1961, 1963.

How to get to Wbs Matratzen by bus?

Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.

    Bus stops near Wbs Matratzen in Bavaria

    • Meerbodenreuth, Industriepark, 3 min walk,
    • Meerbodenreuth, 10 min walk,

    Train stations near Wbs Matratzen in Bavaria

    • Altenstadt (Waldnaab), 25 min walk,

    Bus lines to Wbs Matratzen in Bavaria

    • 1990, Bedarfsverkehr,
    • 1962, Weiden,
    • 1961, Neustadt\Nüber Altenstadt,
    • 1963, Weiden,
    Questions & Answers
    • What are the closest stations to Wbs Matratzen?

      The closest stations to Wbs Matratzen are:

      • Meerbodenreuth, Industriepark stop is 130 meters away, 3 min walk.
      • Meerbodenreuth stop is 638 meters away, 10 min walk.
      • Altenstadt (Waldnaab) station is 1936 meters away, 25 min walk.
    • Which bus lines stop near Wbs Matratzen?

      These bus lines stop near Wbs Matratzen: 1962, 1990.

    • What’s the nearest train station to Wbs Matratzen in Bavaria?

      The nearest train station to Wbs Matratzen in Bavaria is Altenstadt (Waldnaab). It’s a 25 min walk away.

    • What’s the nearest bus station to Wbs Matratzen in Bavaria?

      The nearest bus station to Wbs Matratzen in Bavaria is Meerbodenreuth, Industriepark. It’s a 3 min walk away.

    • What time is the first train to Wbs Matratzen in Bavaria?

      The RB23 is the first train that goes to Wbs Matratzen in Bavaria. It stops nearby at 4:25 AM.

    • What time is the last train to Wbs Matratzen in Bavaria?

      The RB23 is the last train that goes to Wbs Matratzen in Bavaria. It stops nearby at 11:05 PM.

    • What time is the first bus to Wbs Matratzen in Bavaria?

      The 1962 is the first bus that goes to Wbs Matratzen in Bavaria. It stops nearby at 6:04 AM.

    • What time is the last bus to Wbs Matratzen in Bavaria?

      The 1990 is the last bus that goes to Wbs Matratzen in Bavaria. It stops nearby at 12:30 AM.

    See Wbs Matratzen, Bavaria, on the map

    Public Transit to Wbs Matratzen in Bavaria

    Wondering how to get to Wbs Matratzen in Bavaria? Moovit helps you find the best way to get to Wbs Matratzen with step-by-step directions from the nearest public transit station.

    Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Wbs Matratzen in real time.

    Looking for the nearest stop or station to Wbs Matratzen? Check out this list of stops closest to your destination: Meerbodenreuth; Meerbodenreuth; Altenstadt (Waldnaab).

    Train: RE2, RB23, RE23, RE41, RE2, RB23, RE23, RE41.Bus: 1962, 1990, 1961, 1963.

    Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Matratzen easily from the Moovit App or Website.

    We make riding to Wbs Matratzen easy, which is why over 1.7 billion users, including users in Bavaria, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.

    For information on prices of bus, costs and ride fares to Wbs Matratzen, please check the Moovit app.

    Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.

    Wbs Matratzen Address: Meerbodenreuth 33 92665 Altenstadt an der Waldnaab street in Bavaria

    Wbs Matratzen

    Get around Bavaria by public transit!

    Traveling around Bavaria has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Bavaria.

    When traveling to any destination around Bavaria use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.

    Wondering how to use public transit in Bavaria or how to pay for public transit in Bavaria? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Bavaria public transit lines? Moovit public transit app shows all public transit maps in Bavaria with all Bus, Train, Subway, Light Rail, Ferry and S-Bahn routes and stops on an interactive map.

    Bavaria has 6 transit type(s), including: Bus, Train, Subway, Light Rail, Ferry and S-Bahn, operated by several transit agencies, including MVG, Münchner Verkehrsgesellschaft (SWM), DB Regio AG S-Bahn München, MVV, MVV-Regionalbus, Bus München, DB Regio AG Bayern, Bus8, Regionalverkehr Oberbayer (überregional), Straßenbahn München, Stadtwerke Passau, Bus Nürnberg, U-Bahn Nürnberg, Würzburger Straßenbahn and Omnibus2

    Public transit lines with stations closest to Wbs Matratzen in Bavaria

    Train lines with stations closest to Wbs Matratzen in Bavaria

    Bus lines with stations closest to Wbs Matratzen in Bavaria