Directions to Wbs Studio De Ensaio (Barra Da Tijuca) with public transportation
The following transit lines have routes that pass near Wbs Studio De Ensaio
Bus: 18, 2803, 301, 343, 415T.
Metro: L1, L4.
Ferry: BARRA PRIVATE - ILHA DA GIGÓIA, ILHA PRIMEIRA.
How to get to Wbs Studio De Ensaio by bus?
Click on the bus route to see step by step directions with maps, line arrival times and updated time schedules.
How to get to Wbs Studio De Ensaio by metro?
Click on the metro route to see step by step directions with maps, line arrival times and updated time schedules.
Bus stops near Wbs Studio De Ensaio in Barra Da Tijuca
- Ponto Final - Downtown, 2 min walk,
- Avenida Das Américas | Downtown (Sentido Alvorada), 2 min walk,
- Linhas - Barra X Baixada, 3 min walk,
- Bosque Marapendi, 5 min walk,
- Comitê Olímpico Brasileiro, 7 min walk,
- Ibmec | Barra Life Medical Center, 10 min walk,
- Avenida Rodolfo Amoedo, 341, 11 min walk,
Metro station near Wbs Studio De Ensaio in Barra Da Tijuca
- Jardim Oceânico, 15 min walk,
Ferry station near Wbs Studio De Ensaio in Barra Da Tijuca
- Deck - Barra Private, 17 min walk,
Bus lines to Wbs Studio De Ensaio in Barra Da Tijuca
- 405T, Saída 7 → Barra Da Tijuca,
- 410T, Barra Da Tijuca → Saída 7,
- 420T, Nilópolis (Expresso),
- 900, Taquara,
- 301, Terminal Gentileza - Terminal Alvorada (Brs 5 - Via Av. das Américas),
- 319, Central - Terminal Alvorada (via Av. Américas / Túnel Santa Bárbara),
- SV 319, Terminal Alvorada - Central (via Av. Américas / Praia do Flamengo),
- 400, Belford Roxo - Barra da Tijuca (Via Linha Amarela),
- 400T, Belford Roxo - Barra da Tijuca (Via Linha Amarela),
- 417T, Xerém - Barra da Tijuca (via Linha Vermelha / Washington Luiz),
- 425, Queimados - Barra da Tijuca (Via Linha Amarela),
- 425T, Queimados - Barra da Tijuca (Via Linha Amarela),
- 460S (EXECUTIVO), Itaguaí - Barra da Tijuca,
- SC460S, Itaguaí - Barra da Tijuca (via Transolímpica),
- 553, Recreio - Rio Sul (Brs 3 - Via Av. das Américas / Copacabana),
- 554, Piabas - Rio Sul (Brs 3 - Via Vargem Grande / Copacabana),
- SN 554, Piabas - Metrô Botafogo (Brs 3 - Via Vargem Grande / Copacabana),
- 565, Tanque - Gávea (via Alvorada),
- SN 565, Tanque - Gávea (via Alvorada),
- 645, Alvorada - Saens Peña (Via Av. das Américas),
What are the closest stations to Wbs Studio De Ensaio?
The closest stations to Wbs Studio De Ensaio are:
- Ponto Final - Downtown stop is 87 meters away, 2 min walk.
- Avenida Das Américas | Downtown (Sentido Alvorada) stop is 128 meters away, 2 min walk.
- Linhas - Barra X Baixada stop is 197 meters away, 3 min walk.
- Bosque Marapendi stop is 341 meters away, 5 min walk.
- Comitê Olímpico Brasileiro stop is 476 meters away, 7 min walk.
- Ibmec | Barra Life Medical Center stop is 690 meters away, 10 min walk.
- Avenida Rodolfo Amoedo, 341 stop is 821 meters away, 11 min walk.
- Jardim Oceânico station is 1103 meters away, 15 min walk.
- Deck - Barra Private station is 1267 meters away, 17 min walk.
Which bus lines stop near Wbs Studio De Ensaio?
These bus lines stop near Wbs Studio De Ensaio: 18, 2803, 301, 343, 415T, 50, 900.
Which metro line stops near Wbs Studio De Ensaio?
L1, L4 (Jardim Oceânico)
What’s the nearest metro station to Wbs Studio De Ensaio in Barra Da Tijuca?
The nearest metro station to Wbs Studio De Ensaio in Barra Da Tijuca is Jardim Oceânico. It’s a 15 min walk away.
What’s the nearest bus station to Wbs Studio De Ensaio in Barra Da Tijuca?
The nearest bus stations to Wbs Studio De Ensaio in Barra Da Tijuca are Ponto Final - Downtown and Avenida Das Américas | Downtown (Sentido Alvorada). The closest one is a 2 min walk away.
What’s the nearest ferry station to Wbs Studio De Ensaio in Barra Da Tijuca?
The nearest ferry station to Wbs Studio De Ensaio in Barra Da Tijuca is Deck - Barra Private. It’s a 17 min walk away.
What time is the first metro to Wbs Studio De Ensaio in Barra Da Tijuca?
The L1, L4 is the first metro that goes to Wbs Studio De Ensaio in Barra Da Tijuca. It stops nearby at 5:00 AM.
What time is the last metro to Wbs Studio De Ensaio in Barra Da Tijuca?
The L1, L4 is the last metro that goes to Wbs Studio De Ensaio in Barra Da Tijuca. It stops nearby at 12:42 AM.
What time is the first bus to Wbs Studio De Ensaio in Barra Da Tijuca?
The 22 is the first bus that goes to Wbs Studio De Ensaio in Barra Da Tijuca. It stops nearby at 3:00 AM.
What time is the last bus to Wbs Studio De Ensaio in Barra Da Tijuca?
The 301 is the last bus that goes to Wbs Studio De Ensaio in Barra Da Tijuca. It stops nearby at 3:36 AM.
What time is the first ferry to Wbs Studio De Ensaio in Barra Da Tijuca?
The BARRA PRIVATE - ILHA DA GIGÓIA is the first ferry that goes to Wbs Studio De Ensaio in Barra Da Tijuca. It stops nearby at 3:00 AM.
What time is the last ferry to Wbs Studio De Ensaio in Barra Da Tijuca?
The ILHA PRIMEIRA is the last ferry that goes to Wbs Studio De Ensaio in Barra Da Tijuca. It stops nearby at 2:56 AM.
See Wbs Studio De Ensaio, Barra Da Tijuca, on the map
Public Transit to Wbs Studio De Ensaio in Barra Da Tijuca
Wondering how to get to Wbs Studio De Ensaio in Barra Da Tijuca? Moovit helps you find the best way to get to Wbs Studio De Ensaio with step-by-step directions from the nearest public transit station.
Moovit provides free maps and live directions to help you navigate through your city. View schedules, routes, timetables, and find out how long does it take to get to Wbs Studio De Ensaio in real time.
Looking for the nearest stop or station to Wbs Studio De Ensaio? Check out this list of stops closest to your destination: Ponto Final - Downtown; Avenida Das Américas | Downtown (Sentido Alvorada); Linhas - Barra X Baixada; Bosque Marapendi; Comitê Olímpico Brasileiro; Ibmec | Barra Life Medical Center; Avenida Rodolfo Amoedo; Jardim Oceânico; Deck - Barra Private.
Bus: 18, 2803, 301, 343, 415T, 50, 900, 405T, 410T, 420T, 319, SV 319, 400, 400T, 416T, 2417T, 22.Metro: L1, L4.Ferry: BARRA PRIVATE - ILHA DA GIGÓIA, ILHA PRIMEIRA.
Want to see if there’s another route that gets you there at an earlier time? Moovit helps you find alternative routes or times. Get directions from and directions to Wbs Studio De Ensaio easily from the Moovit App or Website.
We make riding to Wbs Studio De Ensaio easy, which is why over 1.7 billion users, including users in Barra Da Tijuca, trust Moovit as the best app for public transit. You don’t need to download an individual bus app or train app, Moovit is your all-in-one transit app that helps you find the best bus time or train time available.
For information on prices of bus and metro, costs and ride fares to Wbs Studio De Ensaio, please check the Moovit app.
Use the app to navigate to popular places including to the airport, hospital, stadium, grocery store, mall, coffee shop, school, college, and university.
Wbs Studio De Ensaio Address: Avenida das Américas, 500 street in Barra Da Tijuca
- 15º Ofício de Notas - Cartório 15,
- Estação Downtown,
- Bloco 9 - Sala 218/219,
- DETRAN DOWNTOWN,
- Bloco 22 Sala 306,
- Bloco 4 Sala 320,
- 234,
- 233,
- Banco de Areia,
- Avenida das Américas 500,
- Bloco 7,
- Cinemark Dowton,
- Shopping Downtown,
- Outback Steakhouse,
- Cartório da 12ª Circunscrição do Registro Civil,
- Perinatal - Centro de Diagnóstico,
- Downtown,
- Spa das Sobrancelhas Shopping Downtown,
- Escritorio Ortobom,
- Espaço Médico Brasil
Places Near Wbs Studio De Ensaio (Barra Da Tijuca)
- Rio De Janeiro,
- Hospital Federal Cardoso Fontes, Jacarepaguá,
- Rodoviária Novo Rio (Rodoviária do Rio de Janeiro), Santo Cristo,
- Rua Ulysses Guimarães 16, Cidade Nova,
- Shopping Downtown, Barra Da Tijuca,
- Niterói, Niterói,
- Hospital Municipal Ronaldo Gazolla, Acari,
- Shopping Rio Sul, Botafogo,
- Praia do Arpoador, Ipanema,
- Rua Licínio Cardoso, São Francisco Xavier,
- Feirão De Malhas, Duque De Caxias,
- Hospital Federal Do Andaraí, Andaraí,
- Museu Do Amanhã, Centro,
- Avenida Venezuela 134, Saúde,
- Shopping RioSul, Botafogo,
- Feira Livre da Gloria, Glória,
- Shopping Nova América, Del Castilho,
- Hospital Pedro Ernesto, Vila Isabel,
- Norte Shopping, Cachambi,
- Avenida Rio Branco, Centro
How to get to popular places in Rio de Janeiro Region with public transit
Get around Barra Da Tijuca by public transit!
Traveling around Barra Da Tijuca has never been so easy. See step by step directions as you travel to any attraction, street or major public transit station. View bus and train schedules, arrival times, service alerts and detailed routes on a map, so you know exactly how to get to anywhere in Barra Da Tijuca.
When traveling to any destination around Barra Da Tijuca use Moovit's Live Directions with Get Off Notifications to know exactly where and how far to walk, how long to wait for your line, and how many stops are left. Moovit will alert you when it's time to get off — no need to constantly re-check whether yours is the next stop.
Wondering how to use public transit in Barra Da Tijuca or how to pay for public transit in Barra Da Tijuca? Moovit public transit app can help you navigate your way with public transit easily, and at minimum cost. It includes public transit fees, ticket prices, and costs. Looking for a map of Barra Da Tijuca public transit lines? Moovit public transit app shows all public transit maps in Barra Da Tijuca with all Bus, Train, Metro, Light Rail, Ferry, Cable Car, Gondola and Funicular routes and stops on an interactive map.
Rio de Janeiro Region has 8 transit type(s), including: Bus, Train, Metro, Light Rail, Ferry, Cable Car, Gondola and Funicular, operated by several transit agencies, including TrensRJ, Metrô Rio, VLT Carioca, Barcas Rio, BRT MOBI-Rio, Auto Viação Alpha, Auto Viação Tijuca, Gire Transportes, Transurb, Viação Nossa Senhora das Graças, Consórcio INTERSUL, Braso Lisboa (Municipal), Caprichosa Auto Ônibus, Auto Viação Três Amigos and Rodoviária Âncora Matias